Binalood Wind Farm

Binalood wind farm is a wind farm situated in Razavi Khorasan Province of Iran near the city of Nishapur. It currently uses 43 turbines with a generating capacity of 660 kW to produce 28.2 MW of electricity using wind power. The area of the farm is over 700 hectares (1,700 acres). The project was initiated in 2002 and the farm came online in 2008. The plant was built by Renewable energy organization of Iran. The plant is currently being expanded by adding 50 more turbines, each with a capacity of 660 kW, increasing its total capacity to 61.2 MW.[1][2][3]

Binalood wind farm
Official nameنیروگاه بادی بینالود
CountryIran
LocationNishapur, Razavi Khorasan Province
Coordinates35°59′31″N 59°23′18″E
StatusActive
Commission date2008
Wind farm
TypeOnshore
Power generation
Units operational43 X 0.66 MW
Nameplate capacity28.2 MW
Planned: 61.2 MW
External links
Websitehttps://binaloodwf.com/?lang=en

See also

References

  1. "Archived copy" (PDF). Archived from the original (PDF) on 2011-07-13. Retrieved 2010-04-22.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ".:: Wind Turbine & Power Plant ::". Archived from the original on 2010-01-09. Retrieved 2010-04-19.
  3. "Archived copy". Archived from the original on 2010-07-30. Retrieved 2010-04-19.{{cite web}}: CS1 maint: archived copy as title (link)


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.