Brown Line (Delhi Metro)
The Brown Line (Line 12) is a proposed line of the Delhi Metro, a rapid transit system in Delhi, India and is scheduled to be opened in 2025.[1]
Brown Line (Line 12) | |
---|---|
Overview | |
Status | Planned |
Owner | Delhi Metro |
Locale | Delhi |
Termini |
|
Stations | 8 |
Service | |
Type | Rapid transit |
System | Delhi Metro |
Operator(s) | Delhi Metro Rail Corporation |
History | |
Opened | 2025 (Phase 4) |
Technical | |
Line length | 7.96 km (4.95 mi) |
The line, proposed to be 7.96 km (4.95 mi) in length, will have eight stations from Lajpat Nagar to Saket G-Block. This Line is a part of Phase 4 of Delhi Metro.[2]
Stations
The stations proposed for the Brown Line are:[2]
Brown Line | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Phase | Opening | Interchange Connection | Station Layout | Platform Level Type | Depot Connection | Depot Layout | |
English | Hindi | ||||||||
1 | Lajpat Nagar | लाजपत नगर | 4 | 2025 | Pink Line Violet Line |
||||
2 | Andrews Ganj | एंड्रयूज़ गंज | 4 | 2025 | None | ||||
3 | Greater Kailash-1 | ग्रेटर कैलाश-१ | 4 | 2025 | None | ||||
4 | Chirag Delhi | चिराग दिल्ली | 4 | 2025 | Magenta Line | ||||
5 | Pushpa Bhawan | पुष्प भवन | 4 | 2025 | None | ||||
6 | Saket District Centre | साकेत डिस्ट्रिक्ट सैंटर | 4 | 2025 | None | ||||
7 | Pushp Vihar | पुष्प विहार | 4 | 2025 | None | ||||
8 | Saket G-Block | साकेत जी-ब्लॉक | 4 | 2025 | Silver Line (Phase 4 - Under Construction) |
References
- "The remaining 3 corridors of the Delhi Metro Phase-4 Project will be completed by 2025 at the cost of Rs. 12,600 CR". Metro Rail News. 3 November 2021. Retrieved 27 May 2022.
- "Delhi metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.