Castle Bromwich Assembly

52.515°N 1.805°W / 52.515; -1.805

Castle Bromwich Assembly

Castle Bromwich Assembly is a factory owned by Jaguar Land Rover. It is located on the Chester Road in Castle Vale, Birmingham, England and employs 3,200 people. The plant is situated on a 110-acre (45 ha) site, with a 60,000 square metres (650,000 sq ft) manufacturing facility.[1] It manufactures all Jaguar saloon and sports cars.

The site was first developed as Castle Bromwich Aircraft Factory, a shadow factory for the production of aircraft by the car industry as part of the rearmament of the UK in the pre-Second World war era. After initial problems it was brought under the control of aircraft manufacturers and became one of the largest producers of aircraft during the war.

History

Nuffield: 1936–1940

In 1936, the British government had formalised a plan under the Air Ministry called the Shadow factory plan to increase capacity within Britain's aircraft industry. Headed up by automotive pioneer Herbert Austin, the plan was to create nine new factories and add additional capacity and facilities to Britain's existing car manufacturing plants to enable them to quickly turn to aircraft production should the political situation in Europe change towards war.

In 1936, the Air Ministry purchased a parcel of land opposite Castle Bromwich Aerodrome which encompassed an old sewage works. Developed and managed by the Nuffield Organization, owners of Morris Motors, they were briefed to manufacture Supermarine Spitfire fighters and later Avro Lancaster bombers. The theory was that the local Birmingham skills-base and production techniques used in the manufacture of motor vehicles could be transferred to aircraft production.

CBAF ordered the most modern machine tools then available which were being installed two months after work started on the site.[2] Although Morris Motors under Lord Nuffield (an expert in mass motor-vehicle construction) managed and equipped the factory, it was funded by government money. When the project was first mooted, it was estimated that the factory would be built for £2,000,000, however, by the beginning of 1939, this cost had doubled to over £4,000,000.[3] The Spitfire's stressed-skin construction required precision engineering skills and techniques outside the experience of the local labour force which took some time to train. Aircraft and sub-assemblies were taken across the Chester Road to Castle Bromwich Aerodrome; though early plans included an aerial bridge from E block to the airfield. Very large hangar-like buildings were erected on the east side of the airfield, which were originally referred to as 'Erecting Sheds', where aircraft were prepared for flight testing. They were for the most part referred to by personnel as the 'Flight Sheds'.

CBAF's chief test pilot was Alex Henshaw MBE who managed a team of pilots who had the job of flight-testing the aircraft. The Air Transport Auxiliary were responsible for dispersing tested machines to the Maintenance Units around the country for the fitting of radio-telephones and other equipment. As any build-up of machines on the airfield would be vulnerable to aerial attack, testing was carried out during daylight in almost any weather.

This Spitfire Mk IIA, now owned by the Battle of Britain Memorial Flight, was built at Castle Bromwich

CBAF produced all versions of the Spitfire from the Mk II onwards. This aircraft had the more powerful Rolls-Royce Merlin XII engine, providing 1,150 horsepower (860 kW), an increase of 120 horsepower (89 kW) over the Mk I, and could be used with either the de Havilland or Rotol propellers. The first Mk II flew on 24 September 1939.[4]

However, even as the first Spitfires were being built in June 1940, the factory was still incomplete and there were numerous problems with the factory management which ignored tooling and drawings provided by Supermarine in favour of tools and drawings of its own designs.[5] Meanwhile, the workforce, while not completely stopping production, continually threatened strikes or "slow downs" until their demands for higher than average pay rates were met.[6] By May 1940, Castle Bromwich had not yet built its first Spitfire in spite of promises that the factory would be producing 60 per week starting in April.[3]

It is worth noting, however, that key players, such as Alex Henshaw, viewed the problems as primarily those of poor management during the initial phase. Workers worked twelve-hour on and twelve-hours off until bombings forced a switch to a three-shift, eight-hour system. Henshaw attended the diamond jubilee in 1996 of the founding of the CBAF, hosted by Jaguar Cars Limited in the old factory and remained fulsome in his praise for the workforce until his death.

Vickers-Armstrong: 1940–1945

After the fall of the government of Neville Chamberlain, new Prime Minister Winston Churchill appointed press tycoon Lord Beaverbrook as the Minister of Aircraft Production. On 17 May, Beaverbrook telephoned Nuffield and manoeuvered him into handing over control of the Castle Bromwich plant to Beaverbook's Ministry.[7] Nuffield was furious and reported the incident to Churchill, but Beaverbrook countered by sending in aircraft expert Sir Richard Fairey who wrote a secret report which detailed how expensive machinery had been unused, the assembly line in chaos, and the employees not doing their work:[8]

Labour is in a very bad state. Discipline is lacking. Men are leaving before time and coming in late, taking evenings off when they think fit. In parts of the factory I noticed that the men did not even stir themselves at the approach of the Works Manager. The labour in the Midlands is not “playing the game”. They are getting extra money and are not working in proportion for it.

Beaverbrook, who had disturbed the Air Ministry by agreeing with the vision of Air Vice Marshal Hugh Dowding that Britain at that time needed defensive fighters over attacking bombers, immediately cancelled all Castle Bromwich contracted bombers, which at that point included the Handley-Page Halifax and the Vickers Wellington.[9] He then sent in experienced management staff and workers from Supermarine, and gave over control of the factory to Vickers-Armstrong (Supermarine's parent company). Although it would take some time to resolve the problems, CBAF achieved full production in June 1940, when 10 Spitfire Mk IIs were built;[10] 23 in July; 37 in August; and 56 in September.[11] No. 611 Squadron at RAF Digby the first squadron to receive the Mk II in August 1940, notably late in the Battle of Britain.

The wisdom of the shadow factory scheme was demonstrated in September 1940, when the Supermarine factory in Southampton was bombed, and production there temporarily stopped. CBAF went on to become the largest and most successful plant of its type during the 1939–45 conflict. As the largest Spitfire factory in the UK, by producing a maximum of 320 aircraft per month, it built over half of the approximately 20,000 aircraft of this type. By the time production ended at Castle Bromwich in June 1945, a total of 12,129 Spitfires (921 Mk IIs,[12] 4,489 Mk Vs, 5,665 Mk IXs,[13] and 1,054 Mk XVIs[12]) had been built.

Subsequently receiving an order for 200 production aircraft, the first CBAF Lancaster was flown on 22 October 1943 by Alex Henshaw. Given the airframe number HK535 and fitted with Merlin 22 engines, it was issued to No. 463 Squadron Royal Australian Air Force. It was lost on a raid over Lille, France, during the night of 10/11 May 1944. Production of Lancasters reached a peak of 25 in December 1944, a record for the quantity produced anywhere.

Some original war time features can still be seen such today, such as the faded remains of green camouflage paint. This can still be seen on the top of some older production buildings such as F Block that is now used as trim and final assembly for the Jaguar XJ. Close inspection will also reveal that all the cast-iron hoppers of the factory's rainware have a winged-roundel motif cast into them. At the Jubilee celebrations in 1997, a plaque was unveiled by Alex Henshaw just inside the old wartime main gates to the factory site. At the moment of the unveiling, ex-Red Arrows founder Ray Hanna made a single pass over the ceremony in Spitfire MkIX, MH434. This machine was not only built at the CBAF, but was test-flown by Henshaw himself. The a/c had been specially named for the occasion by Henshaw at Elmdon Airfield (Now known as Birmingham International.). After the unveiling, both Henshaw and Hanna attended a celebratory luncheon with many local dignitaries as well as many former CBAF employees. The whole event was supported and funded by Jaguar Cars Ltd.

1945–1977

The first post war owners were Fisher and Ludlow, themselves having been bombed out of their inner city factory. Fisher and Ludlow (later Pressed Steel Fisher) were a car body pressings sub-contractor for most of the (now mainly defunct) British Motor Corporation and later British Leyland marques, the last being Jaguar, who took over outright control of the factory in 1977, seven years before being floated off from British Leyland.

Jaguar Cars/Jaguar Land Rover: 1977 to present

Sentinel sculpture on nearby roundabout

Taken over by Jaguar Cars, the facility transferred to Ford on their takeover of Jaguar in 1990, and then in 2008 to Tata Motors as part of Jaguar Land Rover.

Soon after takeover, Tata Motors announced it would close either the Castle Bromwich Assembly plant or Land Rover's Lode Lane plant in Solihull.[14] In March 2010 it was reported that Tata Motors might reconsider plant closures,[15] but on 19 April 2010 Tata Motors announced it would go ahead and close one factory.[16] On 15 October 2010 it was announced that an agreement had been made between Jaguar Land Rover management and union bosses to save all three Jaguar Land Rover production plants from closure. Jaguar Land Rover have agreed that all plants will remain open until at least 2020 in a deal with the Unite the Union, which represents the majority of salaried production employees. Although the deal has yet to be voted on by union members it is expected to be accepted.[17]

In mid June 2019, workers at the plant had voted to move to a four-day week amid a £2.5bn cost-cutting drive. The offer by the employees was intended to help "attract new models and increase job security" since manufacturing of the XJ was to end in July.[18][19]

Weeks later, on 5 July 2019, JLR announced its intention to build a new electric XJ saloon, replacing the manufacturing of the conventional Jaguar XJ (X351) at Castle Bromwich, "safeguarding the jobs of 2,500 people"[20] (or 2,700 people, according to BBC News). Manufacturing of the new model was expected to start in autumn 2019, after an investment of £1 billion in upgrades to the facility.[20] A BBC report indicated that the plant "also produces the Jaguar XF, XE and F-Type" as of mid-2019, but the XJ was essential for the continuation of the manufacturing facility. Without the new electric model, the Castle Bromwich plant would "effectively be dead", according to David Bailey, a professor of business economics at Birmingham Business School.[21]

Products made

The facility currently handles body stamping operations, body assembly, paint and trim, and final assembly for all Jaguar saloon and sports cars. Over 3000 workers currently work at the site producing thousands of cars for the UK and export markets.

Product history

The following models were built at the Castle Bromwich plant until end of production.

References

  1. "Jaguar Land Rover, Castle Bromwich - Cundall".
  2. Price 1982, p. 67.
  3. McKinstry 2007, p. 145.
  4. "Spitfire Mk II". History of War. Retrieved 20 November 2010.
  5. McKinstry 2007, p. 152.
  6. McKinstry 2007, pp. 152, 153.
  7. Price 1982, p. 107.
  8. Leo McKinstry (14 November 2007). "How labour unrest almost lost us the Battle of Britain". The Spectator. Retrieved 15 April 2016.
  9. "Document-42: Aircraft production during the Battle of Britain".
  10. Castle Bromwich Retrieved: 9 February 2008.
  11. Price 1982, p. 109.
  12. Air International 1985, p. 187.
  13. Delve 2007, p. 79.
  14. "Business | Jaguar to shut one Midlands plant". BBC News. 24 September 2009. Retrieved 6 August 2010.
  15. Jon Griffin. "News – Top Stories – New rethink over JLR closure plan". Birmingham Mail. Retrieved 6 August 2010.
  16. Ramanathan, S. Kalyana (19 April 2010). "No change in plan to close unit: JLR". Business Standard India. Business-standard.com. Retrieved 6 August 2010.
  17. "Jaguar Land Rover to retain three UK factories". BBC News. 15 October 2010.
  18. "Jaguar Land Rover workers to vote on four-day week at Castle Bromwich plant as XJ production finishes". Birmingham Mail. 12 June 2019. Retrieved 6 July 2019. The Merlin Gateway Agreement has been drawn up ... at Castle Bromwich - a site previously said to be at risk of closure
  19. "Jaguar Land Rover to build electric XJ car at Castle Bromwich plant". The Guardian. 5 July 2019. Retrieved 6 July 2019.
  20. "Jaguar Land Rover to build electric XJ car at Castle Bromwich plant". The Guardian. 5 July 2019. Retrieved 6 July 2019. safeguarding the jobs of 2,500 people. The last of the current XJ model will roll off the factory lines on Friday before the company switches production to the new model over the summer.
  21. "Jaguar Land Rover announces electric car investment". BBC News. 5 July 2019. Retrieved 6 July 2019. Given where it is in its product lifecycle it [JLR] has to make this decision. The capacity is at Castle Bromwich and there's research and development nearby as well, so they've basically run out of time on this decision
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.