Cinere–Serpong Toll Road
Cinere–Serpong Toll Road is one of the toll roads which are part of the Jakarta Outer Ring Road 2 which will connect to connect with the Kunciran–Serpong Toll Road in the west and the Cinere–Jagorawi Toll Road in the east. This toll road that connects South Tangerang with Depok, crosses several areas, such as Jombang, Ciputat, Pamulang, Pondok Cabe and Cinere. The toll road will be managed by PT Cinere Serpong Jaya (CSJ), the majority of whose shares are owned by PT Jasa Marga.[1][2]
Cinere–Serpong Toll Road | |
---|---|
Route information | |
Maintained by PT Cinere Serpong Jaya (CSJ) | |
Length | 10.1 km (6.3 mi) |
Existed | 2021–present |
Major junctions | |
Northwest end | Serpong Interchange |
Southeast end | Cinere |
Location | |
Country | Indonesia |
Provinces | |
Major cities | |
Highway system | |
History
The toll road project was initiated in 2006, but the construction of the project was halted and delayed due to land acquisition issue, which again restarted in September 2017 after being halted for approximately eight years.[3] The toll road was previously expected to be operational in 2019, [4] however, the first section was inaugurated in 1 April 2021 along with Cengkareng–Batu Ceper–Kunciran Toll Road.[5] While the second section is currently undergoing land acquisition phase which will be used to connect this toll road with Cinere–Jagorawi Toll Road, this section is expected to be operational in 2023.[6]
Sections
This toll road is divided into two sections:
- Section 1 is 6.67 kilometres (4.14 mi) from Serpong to Pamulang
- Section 2 is 3.64 kilometres (2.26 mi) from Pamulang to Cinere.[7]
Exits
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Banten | Ciputat, South Tangerang | 24.6 | 15.3 | Kunciran–Serpong Toll Road | |||
25.7 | 16.0 | 25 | Serpong Interchange | Northern terminus | |||
Pamulang, South Tangerang | 31.2 | 19.4 | 31 | Pamulang Toll Gate | |||
West Java | Limo, Depok | Limo Interchange |
| Southern terminus | |||
Cinere–Jagorawi Toll Road (Under construction) | |||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- "Jasa Marga, Waskita Karya to build Cinere–Serpong toll road". The Jakarta Post. Retrieved 19 September 2018.
- Aditiasari, Dana. "Tol Cinere–Serpong Mulai Dibangun Awal 2017".
- Aditiasari, Dita (16 November 2016). "Tol Cinere-Serpong Mulai Dibangun Awal 2017" [Cinere-Serpong Toll Road Construction to Start in 2017]. finance.detik.com (in Indonesian). Detik.com. Retrieved 7 November 2022.
- "Cinere–Serpong Toll to Operate in 2019". Tempo. Retrieved 19 September 2018.
- "DIRESMIKAN PRESIDEN JOKOWI, 2 RUAS TOL JORR 2 JALAN TOL CENGKARENG - BATUCEPER - KUNCIRAN DAN TOL SERPONG CINERE SEKSI I" [Inaugurated by President Jokowi, 2 toll roads Cengkareng-Batuceper-Kunciran and Serpong-Cinere section 1] (in Indonesian). Badan Pengatur Jalan Tol. 1 April 2021. Retrieved 3 November 2022.
- Yanwardhana, Emir (19 May 2022). "Ini Alasan Tol Serpong-Cinere Tak Kunjung Beroperasi" [These are the reasons why Serpong-Cinere Toll Road is yet to be Operating]. cnbcindonesia.com (in Indonesian). CNBC Indonesia. Retrieved 7 November 2022.
- "Jalan Tol Serpong – Cinere (10,14 km) – KPPIP".