New York City steam system

The New York City steam systems include Con Edison's Steam Operations and other smaller systems that provide steam to New York University and Columbia University. Many individual buildings in New York have their own steam systems.

Steam vapor visible above the buildings on William Street between Maiden Lane and Liberty Street in New York City around year 1901.
Steam vapor being vented through a typical Con Edison orange and white stack on Seventh Avenue at West 20th Street. Steam vapor such as this can be caused by a leak in Con Ed's steam system, which heats and cools buildings in Manhattan up to East 89th and West 96th Street, or by cooler water contacting the outside of a steam pipe.[1]

Con Edison's Steam Operations

Con Edison's Steam Operations is a district heating system which carries steam from generating stations under the streets to heat and cool buildings and businesses in Manhattan. Some New York businesses and facilities also use steam for cleaning and disinfection.

The New York Steam Company began providing service in lower Manhattan on March 3, 1882.[2] The company merged with Consolidated Edison on March 8, 1954.[2][3] Today, Con Edison operates the largest commercial steam system in the world (larger than the next nine combined).[4] The organization within Con Edison responsible for the system's operation, known as Steam Operations, provides steam service to over 1,700 commercial and residential customers in Manhattan from Battery Park to 96th Street uptown on the west side, and 89th Street on the east side of Manhattan. Roughly 27 billion pounds (12,000,000 t) of steam flow through the system every year.[5]

Uses

Steam provides heat and cooling to many buildings in New York. The steam system also provides humidity to art museums, steam cleaning for restaurants to clean dishes, and other uses.[4]

Environmental effects

Approximately 30% of the ConEd steam system's installed capacity and 50% of the annual steam generated comes from cogeneration.[6] Cogeneration and Heat Recovery Steam Generation (HRSG) significantly increase the fuel efficiency of cogenerated electricity and thereby reduce the emission of pollutants, such as NOx, sulfur dioxide, carbon dioxide, and particulate matter, as well as the city's carbon footprint. Con Edison is promoting the use of steam for cooling in the summer months, something that can be accomplished with the installation of absorption chillers.[7] Such trigeneration systems reduce peak electrical loads and save construction costs associated with expanding electrical infrastructure.

Clouds of condensation are vented from manholes in Manhattan through orange and white "chimneys". This can be caused by external water being boiled by contact with the steam pipes or by leaks in the steam system itself.[1]

At least twelve steam pipe explosions have occurred in New York City since 1987.[8] The most recent major incident was the 2018 steam pipe explosion which occurred in the Flatiron District and forced the evacuation of 49 buildings.[9][10] The explosion released concrete, asphalt, "asbestos-containing material" and mud into the air. The asbestos cleared out of the air to safe-level.[11][12] A previous incident was the 2007 New York City steam explosion, and another on June 28, 1996, at a plant on East 75th Street.[13]

Plants

See also

References

  1. "Steam operations FAQ". Consolidated Edison. Archived from the original on August 11, 2016.
  2. "A Brief History of Con Edison". Con Edison. Archived from the original on March 12, 2006. Retrieved May 4, 2014.
  3. "N.Y. Steam Corp. Merged". The New York Times. March 10, 1954. Retrieved June 30, 2023.
  4. Moyer, Greg (October 9, 2014). "Miles of Steam Pipes Snake Beneath New York". The New York Times. Retrieved July 20, 2017.
  5. "Steam Energy" (PDF). Con Edison. Retrieved January 20, 2021.
  6. "Con Edison Steam Long Range Plan 2010-2030" (PDF). Con Edison. December 2010. p. 69. Archived from the original (PDF) on December 7, 2010.
  7. "Benefits and Case Studies of Hybrid Cooling Using Steam" (PDF). Consolidated Edison. Archived from the original (PDF) on October 8, 2007.
  8. Belson, Ken; DePalma, Anthony (July 19, 2007). "Asbestos and Aging Pipes Remain Buried Hazards". The New York Times.
  9. "28 buildings evacuated in NYC steam pipe explosion". WRAL. Archived from the original on July 19, 2018. Retrieved July 19, 2018.
  10. Brassil, Gillian (July 19, 2018). "Asbestos found at steam pipe explosion in Manhattan's Flatiron District". CNBC. Retrieved July 21, 2018.
  11. "Steam Pipe Explosive Event: Frequently Asked Questions (FAQs)" (PDF). NYC.gov. July 19, 2018. Retrieved July 20, 2018.
  12. "Mayor de Blasio Delivers Update On Manhattan Steam Pipe Explosion". The official website of the City of New York. July 19, 2018. Retrieved July 21, 2018.
  13. Raffa, Frank. "Con-Ed Blows Off Some Steam". FDNewYork.com. Retrieved February 20, 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.