Embraer E-Jet E2 family
The Embraer E-Jet E2 family are medium-range twinjet airliners designed and produced by the Brazilian aircraft manufacturer Embraer. It was developed as a successor to the original E-Jet family.
E-Jet E2 family E175-E2 / E190-E2 / E195-E2 | |
---|---|
An E190-E2 of Widerøe, its launch operator | |
Role | Narrow-body jet airliner |
National origin | Brazil |
Manufacturer | Embraer |
First flight | 23 May 2016[1] |
Introduction | 24 April 2018 with Widerøe[2] |
Status | In service |
Primary users | Porter Airlines KLM Cityhopper Azul Brazilian Airlines Helvetic Airways |
Produced | 2013-present |
Number built | 81 as of 30 June 2023[3][4] |
Developed from | Embraer E-Jet family |
The program was launched at the Paris Air Show in June 2013. The E-Jet 2 is a derivative of the original E-Jet family paired with several improvements, chiefly the adoption of more fuel-efficient Pratt & Whitney PW1900G turbofan engines. The family comprises three variants that share the same four-abreast narrow-body fuselage with different lengths and three different new wings, fly-by-wire controls with new avionics, and an updated cabin. The first variant, the E190-E2, made its maiden flight on 23 May 2016 and flight testing proceeded to schedule with little issue. It received certification on 28 February 2018 before entering service with launch customer Widerøe on 24 April. Certification of the larger E195-E2 was received during April 2019; Azul Brazilian Airlines was the first airline to operate this model.
Development of the smaller E175-E2 has been delayed; deliveries were originally set to begin sometime in 2021. In February 2022, Embraer announced that development of the E175-E2 would be put on hold for three years and that deliveries are thus expected to begin between 2027 and 2028.
Development
Background
During the early 2010s, the regional jets segment of the international airliner market grew more competitive with the announcement of the Airbus A320neo and the Boeing 737 MAX, thus it was thought that Embraer would have to respond or else lose the competitiveness of the E-Jet family through inaction.[5] In 2010, Embraer was reportedly considering directly challenging the Bombardier CSeries (now A220) by producing a clean-sheet five-abreast design for 100 to 150 passengers. The alternative option was to somehow improve the E-Jet family to maintain its attractiveness to customers.[5]
In November 2011, Embraer announced at the Dubai Air Show that it had committed to producing new variants of its E-Jet family.[6] This option was both lower risk and lower cost than pursuing a cleansheet design.[5] At the time, Embraer reportedly foresaw a demand for 6,400 commercial jets with capacity of up to 130 seats over the following 20 years. The smallest of the new variants, the E-175-E2, seats up to 88 passengers in a single class configuration, the medium-sized E-190-E2 seats up to 120 passengers, while the largest model, the E-195-E2 seats up to 132 passengers.[5] During the late 2000s, Embraer had studied an aircraft of such capacity, dubbed the E-195X, but had discarded the concept in 2010 in light of degraded aircraft performance in the absence of a re-engine. On account of its poor sales and decreasing demand for 70 seat jets, a redesigned counterpart to the E-170 was not pursued.[5]
One key feature of these new variants would be more efficient engines with larger diameter fans; several large engine manufacturers, GE Aviation, Pratt & Whitney, and Rolls-Royce, were all evaluated by Embraer as possible suppliers.[7] During January 2013, it was announced the Pratt & Whitney PW1000G Geared Turbofan engine had been selected to be the exclusive powerplant of the E2.[8] Embraer commercial aircraft president Paulo Cesar de Souza e Silva noted that the PW1000G was the best suited engine for the performance sought by customers.[9] The selection of the PW1000G is likely to have been eased by the parallel development of the smaller PW1200G engine for the Mitsubishi Regional Jet as well as the larger and more mature PW1500G for the Airbus A220.[5]
The E2 family made various improvements in its performance, such as a reduced specific fuel consumption, lower emissions and noise output, minimised maintenance costs, along with the use of a new aluminum or carbon fiber-based wing.[10] These wings had a higher aspect ratio, a longer wingspan, and were equipped with raked wing tips instead of winglets.[5] In early 2013, Embraer referred to this project as being "the E-jets second generation".[11] During June 2013, the $1.7 billion program was launched at the Paris Air Show, citing strong customer demand.[12][13]
The development programme made extensive use of digital model simulations and static test rigs, enabling rapid progress to be made early on.[10] By May 2016, less than three years after being launched, the E2 had 640 commitments from various airlines and leasing companies, 267 of which were firm orders while 373 were options and purchase rights.[10]
Flight testing
On 25 February 2016, the first E-Jet E2, an E190-E2, was rolled out. It performed its maiden flight from São José dos Campos on 23 May 2016, three months ahead of schedule.[10] It flew for three hours and twenty minutes to Mach 0.82, climbed to 12,000 metres (41,000 ft), retracted the landing gear and flaps, and engaged the fly-by-wire in normal mode. It flew earlier than the previously anticipated second half of 2016. The program had fewer challenges than expected and introduction was then planned in the first quarter of 2018. The airplane was slightly below expected weight and the other two E190-E2 prototypes should fly within a year.[1]
On 8 July 2016, the second prototype made its maiden flight; this initial flight lasted two hours and 55 minutes and was incident-free. The first E-Jet E2 flew from Brazil to Farnborough Airshow just 45 days after its maiden flight, demonstrating maturity and confidence in the design.[14] By April 2017, 650 hours of flight tests had been completed and the program was reportedly on schedule. Embraer sought to guarantee a 99% schedule reliability in the first year of service.[15] By June 2017, half of the flight testing had been completed; the aerodynamics were reportedly better than predicted and the E190-E2 hot and high performance was also better than anticipated.[16]
The E195-E2's MTOW increased to 61,500 kg (135,600 lb) and its range to 2,600 nmi (4,800 km).[17] In June 2017, the four E190-E2s and the single E195-E2 - which was presented at the 2017 Paris Air Show - had made more than 900 flight-test hours, mostly by the E190-E2s.[18] In July 2017, the five aircraft had flown 1,000 flight-test hours while the E190-E2 had accomplished 55% of its test campaign.[19] In January 2018, 98% of the test campaign was completed with 2,000 flight hours. Fuel burn was 17.3% lower than for the E190, up from 16% predicted, while range had increased by 750 nmi (1,390 km) from hot-and-high or short runways: 1,600 or 2,200 nmi (3,000 or 4,100 km) from Mexico City or London City, and noise margin to Stage 4 was 3 EPNdB better than specification at 20 EPNdB.[20]
On 28 February 2018, the E190-E2 received its type certificate from the National Civil Aviation Agency of Brazil (ANAC), Federal Aviation Administration (FAA) and European Union Aviation Safety Agency (EASA).[21] The first production engines for the larger variant were delivered in February 2019 and should deliver a 24% reduction in per-seat fuel burn compared with the E195.[22] The E195-E2 obtained its type certification in April 2019.[23]
Production
Inspired by the automotive industry's production of multiple models on the same line, Embraer proposed building the E190/195-E2 alongside the original E175/190/195 at a steady rate of eight aircraft per month by the end of 2018. Production of the original E-Jet family was projected to slow if assembly of the E175-E2 had started in 2021.[24] As Embraer transitioned from its previous E-jets to the upgraded E2, it was expecting to deliver 85-95 airliners in 2018 with a negative $150 million free cash flow, less than in 2017 with 78 deliveries in the first nine months with a cash outflow of $700 million: return to profitability will take at least three years once the program investment is reduced and the production ramp up is complete.[25] Hybrid stations capable of work on either the E1 or E2 were more automated, moving to 90% automated drilling and riveting for the E2 wing.[26]
Elements such as the cabin were examined from a production standpoint relatively early in the design process, which included the involvement of external suppliers as well. Embraer opted for a sole-source solution for the cabin; this approach reportedly enabled more aggressive deals to be secured from key suppliers and thus lowering costs while also easing integration by reducing the number of suppliers involved.[27]
In November 2017, the E2 was forecast to account for 10% of Embraer's airliner deliveries in 2018 ahead of a planned rise in 2019.[28][29] Embraer thought Airbus would not be able to lower the A220 supply chain costs enough to make it profitable and viewed the A220 as a heavy, expensive and long-range aircraft. Embraer hoped the E2's operational capabilities would win a majority of the market share as commitments were hoped to follow certification and entry into service.[28] Embraer delivered 101 airliners in 2017, down from 162 in 2008, but targeted delivering 14 E2 monthly or even 16 or 18.[26] Throughout 2022, Embraer worked to ramp production at its Sao Jose dos Campos facility, hiring Toyota to help improve efficiency on the E-Jet line. During the fourth quarter of that year, deliveries surged to 80 aircraft, pushing Embraer's full-year deliveries to 159, up from 141 delivered in 2021.[30]
Introduction
After type certification, the first E190-E2 was delivered to launch operator Widerøe in April 2018, configured with 114-seat in single-class, followed by deliveries for Air Astana and Chinese GX Airlines. Before the aircraft were delivered, Embraer announced that some of the initial E-Jet E2s will need to be retrofitted due to the shorter life of the combustor in their Pratt & Whitney PW1900G engines. A business class is developed with a 2+2 staggered seat layout offering a seat pitch of up to 137 cm (54 in), available from mid-2019.[31]
Embraer targets a 99% dispatch reliability after 12 months and 99.5% after four years while the E1 took 10 years to achieve its targeted reliability.[26] On 4 April 2018, Widerøe took delivery of its first E190-E2 in Sao Jose dos Campos.[32] It was introduced between Bergen and Tromsø, Norway on 24 April 2018.[2] By June 2018, the first three E190-E2s delivered to Wideroe accumulated 413 flight hours and 332 cycles, an average of 6.57 cycles per day and an average stage length of 1.28 hours, with a 99.35% dispatch reliability and a 97.74% schedule reliability.[33] Widerøe had a dispatch reliability of 98.5% after its first year of operation.[34]
Boeing–Embraer joint venture
In December 2017, Boeing and Embraer were discussing a potential combination.[35] On July 5, 2018, Boeing and Embraer announced a Memorandum of Understanding to establish a joint venture, in which Boeing would hold an 80% stake, to produce and service Embraer's commercial airliners, including the E-Jet E2.[36] Aviation industry analysts noted that the deal would be good for both companies, as Boeing needed smaller aircraft, like the E-Jet and E-Jet E2 families, and Embraer needed the marketing power of a larger company as the E-Jet E2 family was selling slowly.[37]
On February 26, 2019, the partnership was approved by Embraer's shareholders,[38] and the new joint venture was waiting for regulatory approval. On April 24, 2020, Boeing terminated the deal, stating that Embraer did not satisfy the conditions of the agreement.[39] Embraer rejected Boeing's reasons, saying the company sought to avoid its commitments and said it would pursue "all remedies against Boeing for the damages incurred,"[40] which industry analysts believe may include damages for orders that were lost while customers were waiting for the deal to close.[41]
Design
The E-Jet E2 family had been built on the first generation E-Jet, its wing is redesigned, and it introduces new pylons, landing gear, horizontal stabilizers, cabin, cabin air system, air cycle machine, bleed air system, and a new fly-by-wire system.[42] The E2 is exclusively powered by the Pratt & Whitney PW1000G Geared Turbofan engine; in comparison to traditional powerplants, the PW1000 offers double-digit improvements in fuel burn, pollutant and noise emissions, and operating costs via its lower fan pressure ratios and greater bypass ratios, achieved via the uncoupling of the fan from the low-pressure compressor and the low-pressure turbine.[43] In addition to the main engines, the auxiliary power unit is also supplied by Pratt & Whitney.[44]
The raised, 11:1 aspect ratio gull-wing partially accommodate the 2.01 m (79 in) diameter geared turbofan engine, larger than the CF34 engine by 66 cm (26 in) while the trailing arm landing gear is taller for 23–25 cm (9.1–9.8 in) higher door sills, giving a 5 cm (2.0 in) lower nacelles than the E1.[45] The wing remains broadly similar to that of the E1, the main difference being the use of single-slotted flaps instead of the more complex and drag-generating double-slotted arrangement while the engine pylon is also shorter. The adoption of a composite wing was considered by found to be not yet economically justifiable.[26] The wing structure was lightened by 200 kg (440 lb) due to the fly-by-wire ailerons, also used when braking, avoiding larger wheels and brakes.[26] The horizontal stabilizer was reduced from 26 m2 (280 sq ft) on the E190 and E195 to 23 m2 (250 sq ft) on the E2 jets.[46]
Embraer targeted 16 to 24% lower fuel burn and 15–25% lower maintenance cost per seat.[47] In the E190-E2, of the 17.3% better fuel burn, 11% comes from the geared turbofan, 4.8% from the improved aerodynamics of the new high aspect ratio wing and 1.5% from the fly-by-wire's 15% smaller tail surfaces.[45] Over a 600 nmi (1,100 km) trip and with a US$72 fuel barrel, Embraer estimates a 97-seat E190-E2 trip cost is 7% lower for a 1% higher seat cost than a 106-seat A220-100, a 120-seat E195-E2 has a 2% higher trip cost but a 10% lower seat cost and 10% lower trip cost and 3% lower seat cost than a 129-seat A220-300; and while a 97-seat E190 had an 18% higher seat cost than a 150-seat A320 and a 23% lower trip cost, an E190-E2 has a 30% lower trip cost for an 8% higher seat cost than a 150-seat A320neo, while an E195-E2 has the same seat cost but 20% lower trip cost.[48] In October 2018, Embraer raised its E190/E195-E2 seat or trip costs claim to roughly 10% better than the A220.[49]
The cabin of the E2 was designed around customer requirements that called for greater robustness, flexible reconfiguration, and improved maintainability.[27] The lighting is entirely by LEDs; they can be controlled via the integrated cabin management system along with other functions such as cabin temperature control, water and waste system monitoring, moving map, flight attendant calls, cabin systems power, and audio digital playback amongst others. The interior features modular provisions that enable the future installation of new equipment and whole systems relatively easily and quickly either while in the original production process or mid-life retrofitting.[27] Many interior elements of the cabin, such as panels, bins, galley elements, and lavatories, are provided by EZ Air, a joint venture between Zodiac Aerospace and Embraer.[27] In comparison with the E1 family, the cabin side walls were replaced with slimmer counterparts to gain 2.5 cm (1 in) on each side while new overhead bins are 7.6 cm (3 in) deeper.[26] Baggage bins have been enlarged by 40%.[50][51]
The E2 features a closed loop fly-by-wire flight control system which reduces weight, increases fuel efficiency, enhances control and increases safety by full envelope protection in all flight phases compared to the first E-Jet.[52] The fuel savings of the now closed loop fly-by-wire control come from the enhanced flight stability and the resulting increased lift (lower tail downward force) and weight savings and drag reductions related to the 26% reduction in the horizontal tail (tailplane) size.[53] The Primary Flight Control System is supplied by Moog Inc.[54] The Honeywell Primus Epic 2 avionics suite is used across the family, which aids in maintaining commonality with the E1.[10][55] The cockpit is equipped with landscape displays and advanced graphics capabilities via this suite.[5]
Basic maintenance inspections occur every 1,000 flight hours, up from 850 on the E1, while the intermediate check interval grew to 10,000 flight hours from 8,500.[20] The heavy-check downtime was reduced by 15% from the E1, no out-of-phase tasks are required, and control and corrosion prevention is required every eight years with 82 tasks down from 240.[56]
Operational history
On 3 December 2018, Air Astana received its first E190-E2 of an order of five, to replace nine E190LR used on domestic and regional routes since 2011.[57]
On 31 October 2019, Helvetic Airways became the fourth airline to take delivery of an E2 aircraft and the third (after Widerøe and Air Astana) to receive an E190-E2 aircraft, configured in a single-class layout with 110 seats.[58] On 1 November 2019, Helvetic Airways made their first revenue flight with the E190-E2. The inaugural flight, LX850, was a 336 nmi (623 km), 95-minute leg from Zürich to Bremen.[59]
On 21 November 2019, Binter Canarias became the fifth airline to take delivery of an E2 aircraft and the second (after Azul Brazilian Airlines) to receive an E195-E2 aircraft, configured in a single-class layout with 132 seats.[60] On 13 December 2019, Binter Canarias made their first revenue flight with the E195-E2, which was to depart from Gran Canaria at 11:35 and to arrive at Sal at 14:00.[61][62]
On 30 December 2019, Air Kiribati received its first E190-E2 of an order of two, becoming the fourth airline to take delivery of an E190-E2 aircraft. The airliner, configured in a two-class layout with 92 seats (12 business and 80 economy class), is to serve destinations throughout the vast expanse of Kiribati, including nonstop from Tarawa to Kiritimati (Christmas) Island (the current domestic flight from Tarawa to Kiritimati requires an international stopover in Fiji).[63]
Variants
E175-E2
The E175-E2 (EMB 190-500) model is the smallest in the E-Jet Second Generation family. The E175-E2 will be extended by 60 cm (24 in) from the E175, allowing for the addition of one seat row and a capacity up to 90 passengers. In 2013, the aircraft was expected to cost US$46.8 million.[64]
While the first-generation E175 proved popular with regional airlines in the United States, the weight of the E175-E2 has prevented sales to these customers. Scope clause agreements between mainline carriers and their pilots unions prevent these airlines from contracting with regional airlines to operate aircraft with maximum takeoff weight exceeding 39,000 kg (86,000 lb). The E175-E2 exceeds this limit by 5,400 kg (12,000 lb), due to its heavier geared turbofan engines.[65][66]
The first E175-E2 prototype made its first takeoff on 12 December 2019 from São José dos Campos and flew for 2 hours and 18 minutes, starting a test and certification campaign that was expected to take 24 months and involve two additional aircraft.[67] At that time, Embraer said it believed there would be strong demand for the jet from outside North America,[67] but as of 2023 the company has received no orders for the variant.
First delivery was initially scheduled for 2021.[66] It has been repeatedly delayed and in February 2022, Embraer announced that it will be halting development of the E175-E2 for three years, with deliveries expected to begin between 2027 and 2028.[68]
E190-E2
The 98 kN (22,000 lbf) PW1900G has a 190 cm (73 in) fan for a 12:1 bypass ratio. The aluminum wing span increased to 33.7 m (111 ft) for the highest wing aspect ratio of any airliner, just over 11, while the larger E195-E2 has a longer wingtip and the smaller E175-E2 has a downsized wing. It was moved forward to shift the center of gravity envelope aft to reduce the horizontal stabilizer downforce, lowering fuel burn by 1.5%. The trailing link main landing gear has wheel doors to reduce fuel consumption by 1% and is 51 cm (20 in) taller to provide enough engine ground clearance. The E2 have 75% new parts, closed-loop controls fly-by-wire instead of the open-loop type in the E1 gaining improved maintenance intervals. For E1-rated pilots, the transition to the new type need 2.5 days with no full flight simulator, having similar Honeywell Primus Epic 2 avionics.[69] The E190-E2 (EMB 190-300) has a 5 m (16 ft) wider wingspan but otherwise is close in size to the E190, with up to 114 seats in a single class configuration.[70][71][72][73]
The E190-E2 unit cost was US$53.6 million in 2013.[64] Embraer had it certified on 28 February 2018.[21] Certification needed 46,000 test hours on ground and 2,200 in flight.[69] Due to better than expected fuel burn during tests, in January 2018 Embraer increased the range to 2,880 nmi (5,330 km), and Bombardier tried to implicate it in the CSeries dumping petition by Boeing as it could attain a 2,900 nmi (5,400 km) range.[74] It entered service with Widerøe on 24 April 2018.[2] In 2018, a newly delivered E190-E2 is worth $34 million, $3 million more than the E190, falling to $20 million in seven years, a 40% decline to be compared with 30% projected for an A320neo over the same timeframe.[75]
E195-E2
The E195-E2 (EMB 190-400) will be extended by three seat rows from the E195 by 2.85 m (9.4 ft), and will accommodate up to 146 seats.
The E195-E2 unit cost was US$60.4 million in 2013.[64] In February 2016, Embraer announced that it had decided to increase the E195-E2's wingspan by 1.4 m (4.6 ft) for greater lift, along with a MTOW increase of 2 t (4,400 lb) to extend its range by 450 nmi (830 km) at sea-level starts, and 250 nmi (460 km) in hot and high conditions.[76][77] It competes with the Airbus A220-300,[78] at a lower unit cost. As well, Embraer claims E195 trip costs are 22% lower than a 154-seat A320neo and 24% below a 160-seat 737-8 - but airlines install more seats, widening seat costs further apart than the 6% and 8% quoted by Embraer.[26]
The variant rolled out on 7 March 2017 and Azul was confirmed as its launch operator.[79] It first flew on 29 March 2017, ahead of the previously scheduled second half of the year.[80] Embraer showcased the prototype at the Paris Air Show in June 2017 and plan to enter service in the first half of 2019.[81] By January 2019, the flight-test program preliminary results shows the E195-E2 could end up being a little above specifications at introduction.[82] It was certified on 15 April 2019, with a fuel burn 1.4% less than originally specified for 25.4% less per seat than the E195.[23] Binter Canarias should be its European launch customer, to enter service in late 2019.[83]
On 12 September 2019, Embraer delivered its first E195-E2 to Azul through lessor AerCap, configured with 136 seats in a single class.[84] On 22 July 2022, an E195-E2 landed at London City Airport (LCY) for the first time, making it the largest aircraft cleared to operate from the small airport.[85]
Operators
As of September 2023, there were 89 E2-Jet aircraft in commercial service with nine known operators; the three largest operators are Porter Airlines (19) KLM Cityhopper (18), Azul Brazilian Airlines (15).[3][4]
Airlines | E175-Е2 in service |
E190-Е2 in service |
E195-Е2 in service |
Total |
---|---|---|---|---|
Air Astana | — | 5 | — | 5 |
Air Kiribati | — | 1 | — | 1 |
Air Peace | — | — | 5 | 5 |
Azul Brazilian Airlines | — | — | 15 | 15 |
Binter Canarias | — | — | 5 | 5 |
Helvetic Airways | — | 8 | 4 | 12 |
KLM Cityhopper | — | — | 18 | 18 |
Porter Airlines | — | — | 19 | 19[86] |
Widerøe | — | 3 | — | 3 |
Undisclosed | — | 1 | — | 1 |
Total | 0 | 18 | 66 | 89 |
Model summary
Model variant | Orders | Deliveries | Backlog |
---|---|---|---|
E175-E2 | – | – | – |
E190-E2 | 34 | 18 | 16 |
E195-E2 | 236 | 63 | 173 |
E2-Jet Total | 270 | 81 | 189 |
Deliveries by year
2018 | 2019 | 2020 | 2021 | 2022 | 2023 | Total | |
---|---|---|---|---|---|---|---|
Deliveries | 4 | 14 | 11 | 21 | 19 | 12 | 81 |
Orders and deliveries
The Embraer E-Jet E2 program was officially launched during the 50th International Paris Air Show held in June 2013, with SkyWest Airlines, a North American regional airline, and ILFC, a leasing company placing the first firm orders for the aircraft.[88]
SkyWest was intended as the launch customer of the Embraer E175-E2, with the airline placing a firm order for 100 aircraft, with purchase rights for another 100, an order valued at US$9.36 billion at list price,[89] although airlines routinely receive deep discounts from the list price of planes. The order was canceled in Q3 of 2018.[90][91]
ILFC is the launch customer for the Embraer E190-E2 and E195-E2, with the leasing company placing a firm order for 25 E190-E2 aircraft and 25 E195-E2 aircraft, with purchase rights for another 25 of each type.[92] ILFC was purchased by AerCap in May 2014.[93]
Initial order | Country | Customer | E175-E2 | E190-E2 | E195-E2 | Order total |
---|---|---|---|---|---|---|
17 July 2013[94] | Ireland | AerCap | – | 5 | 45 | 50 |
17 July 2014[95] | China | ICBC | – | – | 10 | 10 |
21 May 2015[96] | Brazil | Azul[lower-alpha 1] | – | – | 51 | 51 |
15 June 2015[97] | United States | Aircastle | – | 2 | 23 | 25 |
16 January 2017[98] | Norway | Widerøe[lower-alpha 2] | – | 3 | – | 3 |
26 September 2018[99] | Switzerland | Helvetic Airways | – | 8 | 4 | 12[100] |
13 November 2018[101] | Spain | Binter Canarias | – | – | 5 | 5[102] |
18 December 2018[103] | Kiribati | Air Kiribati | – | 2 | – | 2[104] |
3 April 2019[105] | Nigeria | Air Peace | – | – | 13 | 13[106] |
23 April 2021[107] | Canada | Porter Airlines | – | – | 50 | 50[108] |
24 January 2022[109] | United States | Azorra | – | 4 | 16 | 20[109] |
6 October 2022[110][111] | Oman | SalamAir | – | – | 6 | 6[112][113] |
30 November 2022[114] | Spain | Binter Canarias | – | – | 5 | 5[115] |
18 May 2023[116] | Jordan | Royal Jordanian | – | – | 2 | 2 |
Undisclosed | – | 1 | 15 | 16 | ||
Totals | 0 | 25 | 245 | 270 |
- E195-E2 launch customer
- E190-E2 launch operator
Initial order | Country | Customer | E175-E2 | E190-E2 | E195-E2 | Order total |
---|---|---|---|---|---|---|
17 June 2013[89] | US | SkyWest Airlines | 100 | – | – | 100 |
17 July 2014[118] | China | Tianjin Airlines | – | 20 | – | 20 |
26 May 2020[119] | Congo | Congo Airways | – | 2 | 2 | 4 |
31 July 2023 | Argentina | Aerolineas Argentinas | - | - | 12 | 12 |
Totals | 100 | 22 | 12 | 136 |
Binter Canarias has converted two options for Embraer E195-E2 aircraft to firm orders. Their first new Embraer aircraft is expected to be delivered in the second half of 2019 with Binter Canarias being the European launch customer.[120] KLM is to lease 25 E195-E2s from Aircastle (15) and ICBC (10) instead of buying from Embraer.[121]
Specifications
Variant | E175-E2[123] | E190-E2[124] | E195-E2[125] |
---|---|---|---|
Flight deck crew | 2 pilots | ||
Seating, dual class | 80 (8J @36 in +72Y @31 in) | 96 (12J @38 in +84Y @31 in) | 120 (12J @36 in +108Y @31 in) |
Seating, single class | 88 @31 in, max 90 @29 in | 104 @31 in, max 114 @29 in | 132 @31 in, max 146 @28 in |
Seat width | 46 cm (18.3 in)[126] | ||
Length | 32.40 m (106.3 ft) | 36.25 m (118 ft 11 in) | 41.51 m (136.2 ft) |
Height | 9.98 m (32.7 ft) | 10.96 m (36.0 ft) | 10.91 m (35.8 ft) |
Wingspan | 31.00 m (101.71 ft) | 33.72 m (110.6 ft) | |
Wing area | 103 m2 (1,110 sq ft)[127] | ||
Aspect ratio | 11.04 | 11.5 | |
MTOW | 44,800 kg (98,800 lb) | 56,400 kg (124,300 lb) | 61,500 kg (135,600 lb) |
OEW | 33,000 kg (73,000 lb) | 35,700 kg (78,705 lb) | |
Max payload | 10,600 kg (23,400 lb) | 13,700 kg (30,200 lb) | 16,150 kg (35,600 lb) |
Max fuel | 8,522 kg (18,788 lb) | 13,500 kg (29,800 lb) | 13,690 kg (30,180 lb) |
Takeoff (MTOW, ISA, SL) | 1,800 m (5,900 ft) | 1,450 m (4,760 ft) | 1,970 m (6,460 ft) |
Landing (MLW, ISA, SL) | 1,300 m (4,300 ft) | 1,240 m (4,070 ft) | 1,412 m (4,633 ft) |
Speed | Mach 0.82 (473 kn; 876 km/h) max., Mach 0.78 (450 kn; 833 km/h) typical | ||
Range (full pax) | 3,735 km (2,017 nmi)[128] | 5,280 km (2,850 nmi) | 4,917 km (2,655 nmi) |
Service ceiling | 12,000 m (41,000 ft) | ||
Engines | 2× Pratt & Whitney PW1715G | 2× Pratt & Whitney PW1919G/21G/22G/23G | |
Fan diameter | 142 cm (56 in) | 185 cm (73 in) | |
Thrust per engine | 67 kN (15,000 lbf) | 85–102 kN (19,000–23,000 lbf) |
See also
Related development
Aircraft of comparable role, configuration, and era
References
- Yeo, Ghim-Lay (24 May 2016). "Embraer completes first flight of E-Jet E2". Washington DC: Flightglobal.
- "Norway's Widerøe completes first revenue flight of an Embraer E190-E2" (Press release). Embraer. 24 April 2018.
- "Embraer orderbook: 2023 2nd quarter Deliveries and Backlog". 3 August 2023. Retrieved 4 August 2023.
- "Embraer Delivers 10 Commercial and 23 Executive Jets in 3Q22" (Press release). Embraer. 7 November 2022.
- "The shaping of Embraer's Second Generation E-Jets: "E2"". theflyingengineer.com. 21 October 2013.
- Trimble, Stephen (10 November 2011). "Embraer commits to re-engined E-Jets". Flightglobal.
- Ostrower, Jon (20 March 2012). "E-Jet revamp promises three-way engine 'dogfight'". Flightglobal.
- Polek, Gregory (14 January 2013). "Embraer Turns True Believer in Pratt's GTF". AINonline.
- "Embraer To Re-engine E-Jets with Geared Turbofan". AIN Online. 8 January 2013.
- Jean L. (31 May 2016). "Embraer's First E190-E2 Jet Takes off Early". mobilityengineeringtech.com.
- "Embraer Selects Pratt & Whitney's PurePower Engines for Second Generation of E-Jets" (Press release). São José dos Campos: Embraer. 8 January 2013.
- Haynes, Brad (17 June 2013). "Embraer launches next E-Jets to strong demand, SkyWest orders up to $9.4 billion". Paris: Reuters. Retrieved 19 June 2013.
- "Embraer Launches "E2", the Second Generation of E-Jets" (Press release). Paris: Embraer. 17 June 2013.
- "E190 E2 Makes its International Debut at the Farnborough Airshow" (Press release). Embraer. 10 July 2016.
- Hemmerdinger, Jon (27 April 2017). "Embraer predicts 99% first-year schedule reliability for E2". Flight Global.
- "Embraer adds range to E190/95 E2s". Leeham. 2 June 2017.
- Hemmerdinger, Jon (2 June 2017). "Embraer boosts range figures for E195-E2s and E190-E2s". Flightglobal.
- "Civil Aviation Programs To Watch". Aviation Week & Space Technology. 9 June 2017.
- Karp, Aaron (28 July 2017). "Embraer swings to $69.5 million 2Q net profit; E2 testing progressing". Aviation Week Network.
- Norris, Guy (19 January 2018). "Embraer Targets Improved E190-E2 As Certification Nears". Aviation Week Network.
- "Embraer E190-E2 Granted Certification by ANAC, FAA and EASA" (Press release). Embraer. 28 February 2018.
- Gubisch, Michael (19 February 2019). "Embraer receives first production engines for E195-E2". FlightGlobal.
- Hemmerdinger, Jon (15 April 2019). "Embraer's E195-E2 receives type certification". Flightglobal.
- Trimble, Stephen (9 October 2017). "Embraer primes factory for hybrid E-Jet production system". Flightglobal.
- Derber, Alex (31 October 2017). "Embraer Battles Through E2 Transition". Aviation Week Network.
- Flottau, Jens (20 March 2018). "Embraer Ventures Out of the Box With E2 Family". Aviation Week & Space Technology.
- Eden, Paul E (13 December 2019). "Embraer E-Jet E2 cabin: Evolutionary design". aviationbusinessnews.com. Retrieved 5 June 2023.
- Flottau, Jens (21 November 2017). "Industry Closely Watching Airbus". Aviation Week & Space Technology.
- Trimble, Stephen (3 November 2017). "Embraer comes of age with the E190-E2". Flightglobal.
- Hemmerdinger, Jon (17 February 2023). "Embraer's deliveries surged in final months of 2022". flightglobal.com.
- Perry, Dominic (5 February 2018). "Initial E-Jet E2s to require engine update". Flightglobal.
- Perrella, Enrique (4 April 2018). "Widerøe Takes Delivery of the World's First Embraer E190-E2". Airways International.
- Flottau, Jens (26 June 2018). "Embraer: Bombardier's C Series Support 'Not A Fair Game'". Aviation Week Network.
- Heguy, Jean-Baptiste (10 May 2019). "E190-E2 makes its mark". Air & Cosmos International. pp. 24–25.
- "Boeing and Embraer Confirm Discussions on Potential Combination" (Press release). 21 December 2017. Boeing and Embraer
- Boeing, Embraer (5 July 2018). "Boeing and Embraer to Establish Strategic Aerospace Partnership to Accelerate Global Aerospace Growth" (Press release).
{{cite press release}}
: External link in
(help)|author=
- "Boeing deal, "crucial to Embraer survival," in doubt". Leeham News. 6 December 2018.
- Boeing and Embraer (26 February 2019). "Boeing-Embraer partnership receives shareholder approval" (Press release).
{{cite press release}}
: External link in
(help)|author=
- "Boeing Terminates Agreement to Establish Joint Ventures with Embraer" (Press release). Boeing. 25 April 2020.
- "Embraer says that Boeing wrongfully terminated the Master Transaction Agreement" (Press release). Embraer. 25 April 2020.
- Hamilton, Scott (27 April 2020). "Pontifications: Taking a knife to a gunfight". Leeham News.
- Pratt & Whitney (16 January 2018). "Embraer's Pratt-Powered E2 Crossover Jet Readied for Launch". Aviation Week.
- "Pratt & Whitney GTF™ engine". MTU Aero Engines. Retrieved 5 June 2023.
- "Pratt & Whitney engines for E-Jets E2 begin flight tests". aerospacemanufacturinganddesign.co. 5 November 2015.
- Gerzanics, Mike (17 July 2018). "Analysis: With E2 series, Embraer closes the loop". Flightglobal.
- Norris, Guy (5 September 2016). "Embraer E2 Certification Tests Set to Accelerate". Aviation Week.
- "investor relations". Embraer. March 2016.
- Field, James (3 April 2018). "Embraer Gives Update on the E-Jet Program". Airways International.
- Russell, Edward (28 October 2018). "Embraer touts E2 costs in effort to land US orders". Flightglobal.
- "The Embraer E-Jet E2". Aircraft interiors international. 11 December 2014.
- Morris, John (8 November 2015). "Embraer Hopes For First Middle East E2 Orders". Aviation Week.
- "E195-E2 > Specifications > New Technologies > Full Fly-By-Wire". Embraer.
- Fehrm, Bjorn (8 April 2016). "Embraer's Fly-by-wire approach". Leeham News and Comment.
- "Moog Announces Contract Award from Embraer for Flight Control System on Second Generation of E-Jets" (Press release). Moog Inc. 13 May 2013.
- "Embraer Selects Honeywell to Provide Avionics for E-Jets Second Generation" (Press release). Embraer. 4 February 2013.
- Baldwin, Bernie (7 September 2018). "Profitability Is Aim of Crossover Jets' Better Maintainability". Aviation Week & Space Technology.
- "Air Astana receives E190-E2 in 'snow leopard' livery". Flightglobal. 3 December 2018.
- "Helvetic Airways Receives its First E190-E2 Jet" (Press release). Zürich: Embraer. 31 October 2019.
- "Helvetic's E190-E2 Readies for First Flight" (Press release). Embraer. 31 October 2019.
- "Binter Receives Its First E195-E2" (Press release). São José dos Campos: Embraer. 21 November 2019.
- "Trabajadores de Binter son los primeros pasajeros del nuevo avión Embraer E195-E2" (Press release) (in Spanish). Binter Canarias. 13 November 2019.
- "Binter Canarias flight NT6800 - Flightradar24". Flightradar24. Retrieved 18 December 2019.
- "Air Kiribati Receives Its First E190-E2 Jet" (Press release). São José dos Campos: Embraer. 30 December 2019.
- Baldwin, Mary-Anne (11 August 2013). "The E2: Embraer's next generation of EJets". Airline Fleet Management. Archived from the original on 13 April 2014.
- Trimble, Stephen (2 December 2016). "Scope clause freeze pushes E175-E2 back to 2021". Flight Global.
- Wolfsteller, Pilar (29 April 2021). "Embraer delays E175-E2 service entry one year". Flightglobal.
- Hemmerdinger, Jon (12 December 2019). "Embraer's first E175-E2 takes to the skies in Sao Jose dos Campos". Flightglobal.
- "Embraer E175-E2 further delayed until 2027". AirInsightGroup. 19 February 2022.
- Wuerfel, Tim (7 March 2018). "Embraer's E2 Advances E-Jet Without Sacrificing Commonality". Aviation Week & Space Technology.
- Embraer ERJ 190-300 is commercially named as "EMBRAER 190-E2" or “E190-E2” From https://www.aviation.govt.nz/assets/aircraft/type-acceptance-reports/embraer-erj-190-series.pdf
- https://www.flyembraer.com/irj/go/km/docs/download_center/Anonymous/Ergonomia/Home%20Page/Documents/APM_E-JetsE2.PDF
- https://www.embraercommercialaviation.com/wp-content/uploads/2017/02/APM_E190.pdf
- "E190-E2 Commercial Jet".
- Lampert, Allison (23 January 2018). "Bombardier seeks to enmesh Embraer in trade spat before ruling". Reuters.
- "Disappointing E2 Orders Could Impact Residual Values". Aircraft Value News. 10 December 2018.
- Trimble, Stephen (24 February 2016). "Embraer announces design revamp of E195-E2". Flightglobal.
- "EJet-E2 ranged upped by 450nm". Leeham News. 24 February 2016.
- "Embraer challenges Bombardier's CSeries with orders for second generation E-Jets". CAPA - Centre for Aviation. 28 June 2013.
- Karp, Aaron (9 March 2017). "Embraer E195-E2 to enter service in 2019 with Azul". Air Transport World. Aviation Week.
- Karp, Aaron (29 March 2017). "Embraer E195-E2 achieves first flight ahead of schedule". Air transport World. Aviation Week.
- "Embraer brings E195-E2 flight test forward". Flightglobal. 7 March 2017.
- Flottau, Jens; Bruno, Michael (25 January 2019). "Embraer Hopes For E2 Sales Surge In 2019". Aviation Week & Space Technology.
- "Binter, of Spain, Will Receive its First E195-E2 in 2019" (Press release). Embraer. 13 November 2018.
- "Embraer Delivers its First E195-E2 to AerCap and Azul" (Press release). Embraer. 12 September 2019.
- "Embraer E195-E2 Becomes the Largest Airliner to Touch Down at London City". airwaysmag.com. 23 July 2022.
- "Porter Airlines Fleet Detail". Retrieved 13 August 2023.
- Araujo, Gabriel (25 July 2022). "Brazil's Embraer delivers 32 jets in Q2, backlog hits 4-year high". Reuters. Retrieved 26 August 2022.
The current [July 25] backlog did not include a new Porter Airlines order of 20 E195-E2 aircraft from the Farnborough Airshow last week, valued at $1.56 billion, Embraer said.
- Rothman, Andrea; Catts, Tim; Wall, Robert (17 June 2013). "Embraer Wins 150 Orders as ILFC, SkyWest Buy Newest Jets". Bloomberg. Retrieved 28 February 2023.
- "SkyWest Inc. Orders 100 New E-Jets E2 from Embraer as a Launch Customer" (Press release). Paris: Embraer. 17 June 2013. Retrieved 12 July 2018.
- Polek, Gregory (30 October 2018). "Embraer Removes 100-unit SkyWest Order from E2 Backlog". Aviation International News. Retrieved 28 February 2023.
- Flottau, Jens (21 February 2022). "Embraer To Pause E175-E2 Program For Three Years". Aviation Week Network. Retrieved 28 February 2023.
- "ILFC Signs Final Agreement For Up To 100 Embraer E-Jets E2s" (Press release). prnewswire.com. 17 July 2013. Retrieved 12 July 2018.
- "AIG Completes $7.6 Billion ILFC Sale to AerCap". insurancejournal.com. 15 May 2014.
- "ILFC Signs Final Agreement For Up To 100 Embraer E-Jets E2s" (Press release). São José dos Campos: Embraer. 17 July 2013. Retrieved 17 July 2013.
- "China's ICBC Orders 10 E195-E2 Jets". Embraer. 17 July 2014.
- "Azul Orders 30 E195-E2 Jets". Embraer. 21 May 2015.
- "Aircastle Signs Firm Order for 25 Embraer E-Jet E2s" (Press release). Paris: Embraer. 15 June 2015.
- "Embraer Signs Order with Widerøe for up to 15 E2 Aircraft" (Press release). Embraer. 16 January 2017.
- "Helvetic Airways Firms Up Order for 12 E190-E2 jets". Embraer. 26 September 2018.
- "Brazil's Embraer says Helvetic signed firm order of 12 jets worth..." Reuters. Retrieved 26 September 2018.
- "Binter, of Spain, Will Receive its First E195-E2 in 2019". Embraer. 13 November 2018.
- "Binter will have the first E195-E2 jet aircraft that will operated by a European airline". www.bintercanaries.com.
- "Embraer Signs Agreement With Air Kiribati For Up to 4 E190-E2". Embraer. 18 December 2018.
- "Air Kiribati Orders Four Embraer E190-E2s". Airwaysmag.
- "Air Peace Selects the E195-E2 and Becomes the First E2 Operator in Africa". Embraer. 3 April 2019.
- "Brazil's Embraer signs $2.1 billion order with Nigeria's Air Peace:..." Reuters. 3 April 2019. Retrieved 3 April 2019.
- "Unidentified Customer Orders 30 Embraer E195-E2 Aircraft". Simple Flying. 29 April 2021. Retrieved 30 April 2021.
- "Porter Airlines Orders a Further 20 Embraer E195E2s to Support Major Expansion Plan". www.flyporter.com. Retrieved 19 July 2022.
- "Azorra Places Order For 20 Embraer E2 Aircraft". azorra.com. 24 January 2022. Retrieved 25 February 2022.
- "Brazil's Embraer gets fresh E195-E2 orders from Oman's SalamAir". Reuters. 6 October 2022. Retrieved 20 November 2022.
- Amati, Giacomo (9 October 2022). "It's Official: SalamAir Firms Up Order For 6 Embraer E195-E2s". Simple Flying. Retrieved 20 November 2022.
- Araujo, Gabriel; Grattan, Steven; Adler, Leslie (6 October 2022). "Brazil's Embraer gets fresh E195-E2 orders from Oman's SalamAir". Reuters.
- Amati, Giacomo (8 October 2022). "It's Official: SalamAir Firms Up Order For 6 Embraer E195-E2s". Simple Flying.
- "Embraer confirms Binter as the customer of five E195-E2 aircraft announced this week". embraer.com. 2 December 2022. Retrieved 3 December 2022.
- "Embraer confirms Binter as the customer of five E195-E2 aircraft announced this week" (Press release). Sao Paulo: Embraer. 12 December 2022.
- "Embraer and Azorra Seal Deal with Royal Jordanian Airlines for Eight New E2 Jets". Yahoo Finance. 18 May 2023. Retrieved 18 May 2023.
- "Release of Deliverables and Backlog". Embraer. Retrieved 25 February 2023.
- "China's HNA Group Tianjin Airlines Purchases 20 E-Jets and 20 E-Jets E2". 17 July 2014. Archived from the original on 24 September 2015. Retrieved 7 May 2015.
- "Congo Airways Converts Embraer E175 Order to E190-E2 Jets". Embraer. 26 May 2020.
- "Binter Canarias". Airliner World. August 2019: 11.
- "KLM Firms Up Order for E195-E2 Jets and Adds Six Further Aircraft". Embraer. 12 November 2019.
- "E-Jets E2 Folder" (PDF). Embraer. 13 June 2015.
- "E175-E2" (PDF). Embraer. June 2017.
- "E-Jets E2 Airport Planning Manual" (PDF). Embraer. 11 May 2018.
- "E195-E2" (PDF). Embraer. June 2017.
- "The Single Aisle Cabin War Reaches its Climax". Airways International.
- "Type certificate data sheet No. EASA.IM.A.071 for Embraer ERJ 190" (PDF). European Union Aviation Safety Agency. 15 April 2019.
- "E175-E2" (PDF). Embraer. August 2018.
External links
- Official E-Jet E2 page
- "An Ingenious Plane Design That Makes Room for Your Carry-Ons". Wired. 29 July 2014.
- "E-Jets E2 Airport Planning Manual" (PDF). Embraer. 11 May 2018.