Florida Midland Railway (defunct)

The Florida Midland Railway Company was incorporated under the general incorporation laws of Florida, and surveyed a line from Lake Jessup, in Orange County, to Leesburg, in Lake County.

Florida Midland Railway
Original Route (click to enlarge)
Overview
LocaleCentral Florida
SuccessorPlant System
Atlantic Coast Line Railroad
Seaboard Coast Line Railroad

History

The company was reincorporated on February 10, 1885; only 10 miles (16 km) had been graded. The new owners were E. W. Henck, S. M. Breuster, Carl Cushing, A. Menser and C. E. Munson of Florida, and Edward Page, Charles W. Morris and Cyrus Carpenter of Boston, Massachusetts.

The line was extended

... beginning at a point on the Indian River and running through the counties of Brevard and Orange to Leesburg, in Sumter county, or to Eustis, in Orange county, or to points or a point of connection with railroads or a railroad running from these places, or from either of them, and from a point on the line of said road, in Orange county, to a point on the Gulf of Mexico, running through the counties of Orange, Sumter, Polk, Hernando, Hillsborough, Manatee and Monroe, or such of them as may be necessary to reach the terminal point, which shall be selected on the Gulf of Mexico.

Florida state law chapter 3652, approved February 10, 1885, source unknown

Land grants were promised, as long as part of the railroad was completed within a year.

Florida state law chapter 3795, approved June 2, 1887, expanded the area from which land grants could be chosen, and extended the deadline to June 1, 1888.

The line actually built was rather different, running from Clifton on Lake Jesup west to Apopka, but then turning south to Kissimmee.

The railroad's track was 4 ft 8+12 in (1,435 mm) standard gauge while it was independent, but when it was taken over by the Plant System in the late 1890s, all track north of the 3 ft (914 mm) narrow gauge section of the Sanford and St. Petersburg Railroad (also taken over by the Plant System) was abandoned and the remaining trackage from Clarcona to Kissimmee was converted to 3 ft narrow gauge. The two narrow gauge lines were run in conjunction with one another, allowing the usage of the same narrow gauge equipment on both lines.[1] The Plant System became part of the Atlantic Coast Line Railroad system in 1902.

Current conditions

Abandoned Florida Midland RR Right of way in Ocoee Florida

From Clifton to Apopka, the railroad has been abandoned for over 100 years. Virtually no trace of this section remains, but parts of the right-of-way were used to construct SR 434.

From Apopka to Clarcona, the right-of-way is used for the West Orange Trail.

From Clarcona to Ocoee, the right-of-way is currently owned by CSX Transportation and run by the Florida Central Railroad.

From Ocoee to Kissimmee, the railroad is abandoned, and some elements remain.

Historic stations

These are listed from north to south.

Milepost[2] City/Location Station Connections and notes
Clifton junction with Sanford and Indian River Railroad (ACL)
Longwood Longwood junction with South Florida Railroad (ACL)
Palm Springs junction with Orange Belt Railway (ACL)
Altamonte Springs Altamonte
Lake Brantley
Fitzville
Apopka East Apopka junction with Apopka and Clay Spring Railway
AVB 841.1 Apopka junction with Florida Central and Peninsular Railroad Orlando Division (SAL)
AVB 837.5 Clarcona junction with Orange Belt Railway (ACL)
Villa Nova
AVB 832.6 Ocoee Ocoee junction with Tavares & Gulf Railroad (SAL)
Minorville
AVB 829.1 Gotha
AVB 825.7 Windermere Windermere
AVB 822.0 Doctor Phillips previously known as Harperville
AVB 818.5 Vineland previously known as Orange Center, also Englewood
Molanes
AVB 812.3 Shingle Creek
AVB 808.0 Kissimmee Kissimmee junction with South Florida Railroad (ACL)

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.