Green Jade
The Green Jade is a crane vessel built to support the offshore wind industry.
Design
Green Jade is 216.5m long. Its main crane capacity is 4,000 tonnes. Crew accommodations are for up to 160.[1] The main crane is made by Huisman Equipment.[2]
History
Green Jade was built at CSBC Corporation, Taiwan's Kaohsiung yard.[1] First steel was cut in September 2020[4] and the keel was laid in March 2021.[5]
Green Jade's launching in April 2022 was attended by Taiwanese Premier Su Tseng-chang. At the time of its launching it was the second largest vessel of its kind in the world.[1]
Green Jade is owned by CSBC-DEME Wind Engineering Co.[1]
References
- Cheng-hui, Chen. "Taiwan launches giant wind power installation ship". taipeitimes.com. Taipei Times. Retrieved 4 April 2022.
- Durakovic, Adnan. "Green Jade Launches in Taiwan, Delivery Pushed to 2023". offshorewind.biz. Offshore Wind. Retrieved 4 April 2022.
- yi-ning, Tseng; Lo, James. "First Taiwan-built offshore wind installation vessel launched". focustaiwan.tw. Focus Taiwan. Retrieved 4 April 2022.
- "First steel cut for Green Jade". offshore-mag.com. Offshore Magazine. Retrieved 4 April 2022.
- "Back to overview Keel Laid for Green Jade". offshorewind.biz. Offshore Wind. Retrieved 4 April 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.