Greenboro station

Greenboro is a transitway stop and future O-Train Trillium Line (Line 2) station in Ottawa, Ontario, Canada. It is located at Bank Street and Johnston Road at the north end of the South Keys shopping complex.[1] The station has a 678-space paid park and ride lot. The bus terminus was opened with the southern transitway on September 2, 1995.

Greenboro
Greenboro station in May 2020
General information
Coordinates45°21′35″N 75°39′33″W
Owned byOC Transpo
PlatformsSide platform
Tracks1
Construction
Parking678 spaces at South Keys Shopping Centre
Bicycle facilitiesYes
AccessibleYes
History
Opened1995
Rebuilt2001
Services
Preceding station OC Transpo Following station
South Keys
toward Airport
Route 97 Walkley
toward Hurdman
South Keys
toward Hawthorne
Route 98
South Keys Route 99
Future services
Preceding station OC Transpo Following station
Walkley
toward Bayview
Line 2
Reopens 2024
South Keys
toward Limebank

From 2001 to 2020, Greenboro served as the southern terminus for the Trillium Line. Upon the line's relaunch in 2023, Greenboro will become a through station, while Limebank station will serve as the line's new terminus. Service to the Uplands (near the EY Centre) and Airport stations will be relocated to the nearby South Keys station, which will connect to these stations with a fare-paid interchange to the Airport Link train.

Service

The following routes serve Greenboro station as of May 3, 2020:[2]

O-Train
 R1   R2  O-Train replacement bus routes
 98   39  Rapid routes
 N75  Night routes
 40   11  Frequent routes
 55   162  Local routes
 284  Connexion routes
 405  300s: Shopper routes
400s: Event routes
600s: School routes
Additional info:
Greenboro Station Service
North O-Train Under construction (opening in 2023)
South O-Train Under construction (opening in 2023)
1A Transitway South  2   6   40   90   92   93   93X   96   96B   97   98   99   99   197   198   199   294   299   304   640   644   649   698 
1B  6   40   90   92   93   93X   96   96B   99   99   197   198   640   644   649  (Off only)
2A Transitway North  2   90   92   93   96   96B   97   98   99   99   199   294   299   304   452   698 
3A No longer in use
  • Every route that ends at Greenboro (except for some Route 97 trips and O-Train replacement buses) ends at stop 1B
  • Until 2015, A stop designated as 3A was in use by route 43 but when it was redirected to the Southeast Transitway, this stop was abandoned. This stop could go back into use when the time comes to convert the Southeast Transitway into LRT but this is not going to happen until some time after 2031.

References

  1. "Greenboro" (PDF). Station Layout. OC Transpo. December 2015. Retrieved March 16, 2016.
  2. "Greenboro | OC Transpo". Retrieved October 25, 2019.

Media related to Greenboro Station at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.