Halfway tram stop (Great Orme)

The Halfway tram stop is a tram stop situated at the midpoint of the Great Orme Tramway on the slopes of the Great Orme in Llandudno, Wales. The Great Orme Tramway operates as a two-section funicular, and passengers must change at Halfway between the lower section (to and from the Victoria stop) and the upper section (to and from the Summit stop). The stop is also convenient for the nearby Bronze Age Copper Mines.[1][2]

Halfway (Great Orme)
Station on heritage railway
Halfway Tram Station seen from below
General information
LocationLlandudno, Conwy
Wales
Coordinates53.3308°N 3.8444°W / 53.3308; -3.8444
Platforms2
History
Original companyGreat Orme Tramway
Key dates
31 July 1902Lower platform opened
8 July 1903Higher platform opened

As well as being the point at which passengers change cars, the Halfway stop is also the control centre for the Great Orme Tramway. The electric motors which drive the cables that propel the cars are located in the central building of the stop, as are the winchmen who control them.[3]

Trams run approximately every ten minutes to the Summit stop, and roughly every twenty minutes to Victoria, increasing to ten minutes in peak hours. Trams run seasonally only, from late March to late October.[2]

Preceding station Heritage Railways  Heritage railways Following station
Terminus   Great Orme Tramway
Upper Section
  Summit
Llandudno Victoria   Great Orme Tramway
Lower Section
  Terminus

References

  1. Turner, Keith (2003). The Great Orme Tramway – over a century of service. Llanrwst: Gwasg Carreg Gwalch. ISBN 978-0-86381-817-2.
  2. "Visitor Information". Great Orme Tramway. Retrieved 28 October 2016.
  3. "How it works". Great Orme Tramway. Retrieved 29 October 2016.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.