Hangzhou–Taizhou high-speed railway

The Hangzhou–Taizhou high-speed railway is a high-speed railway in China. It was opened on 8 January 2022.[1]

Hangzhou–Taizhou
high-speed railway
杭台高速铁路
Overview
StatusIn operation
LocaleZhejiang Province, China
Termini
Stations12
Service
Operator(s)China Railway Shanghai Group
History
Opened8 January 2022[1]
Technical
Line length267 km (166 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

Description

The railway does not parallel any existing railway.

The railway is the first privately funded Chinese high-speed railway, while a consortium led by Fosun Group provided 51% of the funds.[2]

Features

Xiaobeishan tunnel, a 596 metres (1,955 ft) long single-bore quadruple-track tunnel. The Hangzhou–Taizhou high-speed railway uses the inner two tracks.[3]

18.23 kilometres (11.33 mi) Dongming Tunnel is the longest high-speed railway tunnel in East China.[4][2]

Jiaojiang Bridge over Jiao River is a cable-stayed bridge with a total length of 5,253 metres (17,234 ft), main span of 480 metres (1,570 ft) and 194 metres (636 ft) high central pylon.[5][6]

Stations

It has the following stations:[7]

Station Name Chinese Metro
transfers/connections
Hangzhou East 杭州东 Hangzhou Metro  1   4   6   19 
Hangzhou South 杭州南 Hangzhou Metro  5 
Shaoxing North 绍兴北
Shangyu South 上虞南
Shengzhou North 嵊州北
Shengzhou Xinchang 嵊州新昌
Tiantaishan 天台山
Linhai 临海
Taizhou 台州
Wenling 温岭
Wenling West 温岭西
Yuhuan 玉环

References

  1. "杭台高铁将于1月8日开通运营 两地最快63分钟可达". Archived from the original on 2022-01-07. Retrieved 2022-01-07.
  2. "Test running starts on privately financed high speed line". Railway Gazette International. 2021-12-03. Archived from the original on 2021-12-03. Retrieved 2021-12-21.
  3. "我国首条单洞四线超大断面高铁隧道贯通". www.crecg.com. Archived from the original on 2020-11-10. Retrieved 2020-11-09.
  4. "Longest High-speed Railway Tunnel in East China Completed". Tunnel Business Magazine. 2020-07-27. Archived from the original on 2021-12-21. Retrieved 2021-12-21.
  5. "The main tower on the south bank of the Jiaojiang Bridge was successfully topped". Seetao. 2020-12-08. Archived from the original on 2021-12-21. Retrieved 2021-12-21.
  6. "Jiaojiang Bridge Was Successfully Closed". Shandong Hanpu Machinery Co.,Ltd. Archived from the original on 2021-12-21. Retrieved 2021-12-21.
  7. "杭台高铁正式定名 杭州️到台州铁路出行时间缩短". Archived from the original on 2021-06-04. Retrieved 2021-06-18.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.