Hanjialing–Yuanping railway

The Hanjialing–Yuanping railway, also known as the Hanyuan Railway (Chinese: 韩原铁路; pinyin: Hán yuán tiělù), also known as the North Tongpu four-track railway, is a north–south railway located in Shanxi Province. It is the northern part of the Datong–Puzhou railway (Tongpu railway) running from Yuanping in the south to the Datong–Qinhuangdao railway at Hanjialing. The line is a national class I double-track, electrified railway with a total length of 153 kilometres and a design speed of 160 kilometres per hour, built entirely with heavy-duty track. The whole line opened for freight traffic on 25 February 2014[1] and passenger services commenced on March 29 of the same year.[2] Construction of two extra tracks was completed on 1 May 2019.[3]

Hanjialing–Yuanping railway
韩原铁路
Overview
Other name(s)Hanyuan railway
StatusIn operation
LocaleShanxi
Termini
  • Hanjialing
  • Yuanping
Service
TypeClass I railway
SystemChina Railway
Operator(s)China Railway Taiyuan Group
History
Opened25 February 2014
Technical
Line length153 km (95 mi)
CharacterPassenger and freight
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius3,500 m (11,500 ft), 2,800 m (9,200 ft) in difficult areas
Operating speed160 km/h (99 mph) with capacity to increase to 200 km/h (120 mph)
Maximum incline0.6%
Route map

km
Datong
Left arrowYungang branch
Pingwang
Left arrow Kouquan branch
Hanjialing
Mizhuang crossing loop
Huairen East
Yingxian
Shanyin
Shuoshan Railway
Shuozhou
Xiaguanyuan
Yuanping West
Xuegu
Yuanping
Down arrow Tongpu Railway to Fenglingdu

In February 2016, Shanxi Province decided to build the Datong–Yuanping HSR. On June 15, the "Environmental Impact Report on the New Daton–Yuanping Railway Passenger Dedicated Line" was published in its entirety.[4] In July, the Shanxi Provincial Development and Reform Commission approved the "Feasibility Study Report on the New Datong–Yuanping Railway Passenger Dedicated Line". On 9 July, the Environmental Protection Department of Shanxi Province approved the "Environmental Impact Report of the New Datong–Yuanping Railway Passenger Dedicated Line". On 12 August, the construction of third and fourth tracks for passenger traffic from Datong to Yuanping commenced next to the North Tongpu Railway, then under construction. However, only about 2.2 kilometres of the subgrade and culvert construction at Shuozhou East railway station was completed, and then construction was suspended.[5]

Subsequently, a new route extending from Ulanqab railway station (in Jining) to Datong and Yuanping was studied. The announcement of the approval of the construction of the new Jining–Datong–Yuanping HSR was made on 18 May 2020.[6][7] On 30 June, the groundbreaking ceremony for the Jining–Datong–Yuanping HSR was held in Shuozhou City.[8]

References

  1. "韩原线通车,大秦续写传奇" [Hanyuan Line opened to traffic, Daqin continued to write legends] (in Chinese). China Railway. 1 March 2014. Retrieved 18 June 2020.
  2. "韩原铁路客运线开通 太原到大同缩短至3个多小时" [Hanyuan Railway Passenger Line opened from Taiyuan to Datong shortened to more than 3 hours]. People's Daily (in Chinese). 30 March 2014. Archived from the original on 26 March 2017. Retrieved 18 June 2020.
  3. "韩原线要开动车了!开启逛吃模式" [Hanwon Line is about to drive! Open shopping mode] (in Chinese). China Railway. 1 May 2019. Retrieved 18 June 2020.
  4. "新建大同至原平铁路客运专线变更环境影响评价信息公告" [Announcement on Environmental Impact Assessment Information for the Change of the New Datong–Yuanping Railway Passenger Dedicated Line]. 网易 (in Chinese). 20 April 2018. Archived from the original on 17 November 2021. Retrieved 17 November 2021.
  5. "集大原高速铁路开工建设" [The construction of Jidayuan high-speed railway started]. 朔州新闻网 (in Chinese). 1 July 2020. Archived from the original on 5 July 2020. Retrieved 1 January 2023.
  6. "新建铁路集宁经大同至原平铁路环境影响评价第二次信息公告" [The second information announcement on the environmental impact assessment of the new railway Jining via Datong to Yuanping Railway]. 大同市人民政府 (in Chinese). 18 May 2020. Archived from the original on 17 November 2021. Retrieved 2 January 2023.
  7. "新建铁路集宁经大同至原平铁路环境影响报告书" [Environmental Impact Report of the New Railway Jining via Datong to Yuanping Railway] (PDF). 大同市人民政府 (in Chinese). 18 May 2020. Archived (PDF) from the original on 17 November 2021. Retrieved 2 January 2023.
  8. "集宁经大同至原平高速铁路开工建设" [Construction of the Jining-Yuanping high-speed railway started via Datong]. 山西省政府网 (in Chinese). 30 June 2020. Retrieved 2 January 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.