Joondalup line

The Joondalup line is a commuter rail service in Western Australia, linking the Perth central business district (CBD) with the metropolitan area's north-western suburbs. The service is operated on the Northern Suburbs Railway by Transperth Train Operations,[1][2] a division of the Public Transport Authority, and is part of the Transperth network. It is 40.7 kilometres (25.3 mi) long and serves 13 stations. The service is currently being extended to Yanchep as part of the Yanchep Rail Extension project.[3]

Joondalup line
Overview
OwnerPublic Transport Authority
Termini
Continues asMandurah line
Stations13
Service
TypeCommuter rail
SystemTransperth
Operator(s)Transperth Train Operations
Ridership14,045,991 (year to June 2023)
History
Opened20 December 1992
Technical
Line length40.7 km (25.3 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification25 kV 50 Hz AC from overhead catenary
Route map

km
Yanchep
Eglinton
Alkimos
planned extension
40.7
Butler Bus transfer
Butler Boulevard flyover
Benenden Avenue flyover
Landbeach Boulevard flyover
00.0
33.2
Clarkson Bus transfer
Neerabup Road flyover
29.2
Currambine
00.0
Moore Drive flyover
Mitchell Freeway tunnel
Joondalup Drive tunnel
Lawley Court flyover
26.2
Joondalup Bus transfer
00.0
00.0
Collier Pass tunnel
00.0
Mitchell Freeway tunnel
Eddystone Avenue flyover
22.9
Edgewater
Whitfords turnback
19.8
Whitfords Bus transfer
17.7
Greenwood
Warwick Road flyover
14.5
Warwick Bus transfer
Beach Road flyover
Reid Highway flyover
Cedric Street flyover
Stirling Bus Interchange
08.8
Stirling Bus transfer CircleRoute
Hutton Street flyover
05.6
Glendalough Bus transfer
Powis Street
02.4
Leederville
00.0
00.0
Leederville turnback
Roe Street tunnel
Mitchell Freeway
00.0
James Street Bus Bridge
00.0
Perth Bus transfer Transwa Free Transit Zone
-0.6
Elizabeth Quay Bus transfer Free Transit Zone
continues to Mandurah line
Railways in Perth
Airport
Armadale
Fremantle
Joondalup
Mandurah
Midland
Thornlie
List of Transperth stations

Construction of the infrastructure for the service began on 14 November 1989. It opened between Perth station and Joondalup station on 20 December 1992, albeit with only Perth, Leederville, Edgewater and Joondalup stations operational. The remaining stations began operating on 21 March 1993. The Joondalup line initially continued as the Armadale line. The service has been extended beyond the original terminus at Joondalup several times since: an extension to Currambine opened on 8 August 1993; an extension to Clarkson opened on 4 October 2004; and an extension to Butler station opened on 21 September 2014. The railway for the service has also been realigned through the Perth CBD, as part of the construction of the Mandurah line: on 15 October 2007, the southern end began operating through tunnels under the CBD, terminating at Elizabeth Quay; and on 24 December 2007, the service began to through-run south as the Mandurah line service. In 2019, work commenced to extend the service to Yanchep as part of the Yanchep Rail Extension project,[3] scheduled to be completed by the end of 2023.[4]

Trains take 38 minutes to get from Perth Underground station to Butler station. The service is the second busiest on the Transperth network, with 14,045,991 boardings in the 2022–23 financial year. Headways are at least every 15 minutes during the day, rising to every 5 minutes on parts during peak time.

History

Construction of the railway line commenced with Premier Peter Dowding driving the first spike on 14 November 1989. The line to Joondalup was opened by Premier Carmen Lawrence on 20 December 1992.[5][6][7] Initially only Leederville, Edgewater and Joondalup stations were opened with the remaining stations opened as completed for a full service to commence on 21 March 1993.[8][9] A realignment of the entire Transperth bus system was undertaken whereby the new railway stations became bus interchanges. On 8 August 1993, the line was extended to Currambine.[10][11]

Initially, service frequencies were similar to those for the Fremantle line as lower passenger numbers were anticipated; however, overcrowding saw the doubling of services between Perth and Whitfords on weekdays. Services were reverted to Fremantle line frequencies between 09:00 and 14:00 on 28 June 2009 due to low passenger numbers on those services.[12]

On 4 October 2004, the line was extended to Clarkson as part of the New MetroRail project. Nowergup depot opened at the same time.[1][13] On 29 January 2005, Greenwood was opened to alleviate pressure at the adjacent Warwick and Whitfords stations.[5][14]

On 8 August 2005, the service, which previously continued south from Perth station onto the Armadale line, was curtailed at Perth and no longer provided a through service. On 15 October 2007, Joondalup line trains began running to Perth Underground and Elizabeth Quay stations via new tunnels under central Perth.[15]

On 23 December 2007, the opening of the Mandurah line resulted in Joondalup services operating through to Mandurah. On 21 September 2014, the service was extended to Butler.[16]

Future

Yanchep extension

Long, sandy construction site
Construction work on the extension to Yanchep viewed from Butler railway station in January 2023
Construction work on the Yanchep Rail Extension north of Romeo Road in Alkimos, with Alkimos station seen in the distance

Construction has commenced to extend the line by 14.5 km (9.0 mi) to growing suburbs including Alkimos, Eglinton and Yanchep. In the 2017 Western Australian state budget, $441 million was allocated to build the extension, with preparation works starting in January 2020 and bulk earthworks to start by April 2020.[17] When the extension opens, a journey time of 49 minutes is envisioned from Yanchep to the CBD, with up to 13,500 people expected to use the service every day.[3]

At the 2021–22 State Budget, it was announced that completion of the Yanchep rail extension had been deferred by 12 months, as a result of Western Australia's skills shortage. This was alongside the deferment of 15 other state government infrastructure projects. The revised opening date is late 2023.[18][19][20]

By May 2023, the first 2.7 kilometres (1.7 mi) of track had been laid.[21]

Additional stations

There are provisions for a special events station to be built to service Arena Joondalup. However, there are currently no plans for that to go ahead.[22][23]

Description

The railway has a gauge of 1,067 millimetres (3 ft 6 in); the same as the rest of the Transperth network. South of Currambine, the line is designed for a maximum speed of 110 kilometres per hour (68 mph); north of Currambine, the line is designed for a maximum speed of 130 kilometres per hour (81 mph). During hot weather, the tracks can distort. As a result, train speeds are reduced by approximately 20 kilometres per hour (12 mph) when the air temperature is above 39 °C (102 °F), and by an additional 10 kilometres per hour (6.2 mph) when the air temperature is above 41 °C (106 °F).[24][25]

The Transperth network currently uses fixed block signalling and automatic train protection, which stops trains that pass a red signal and slows trains that drive too fast.[26]:21 These systems will be replaced by an automatic train control system, likely a communications-based train control system.[26]:27 The new systems are planned to be in place on the Joondalup line by June 2029,[26]:77 and will allow up to at least 30 trains per hour to use the line.[26]:28

Route

At its southern end, the service (travelling north) begins as a continuation of the Mandurah line at Elizabeth Quay and (travelling south) ends as a continuation of the Mandurah line at Perth Underground. The 1.5-kilometre-long (0.93 mi) section through the Perth CBD runs underground, passing underneath the Fremantle line at Yagan Square which at their crossing also runs underground. The service surfaces and enters the median of the Mitchell Freeway. It continues north along the freeway until Butler, only exiting the median to pass through the centre of Joondalup, the major suburban centre fed by the service. At Butler, the service veers off to the west, terminating at Butler railway station.

Stations

Key
Icon Purpose
Under construction
Station Distance from Perth[27] Fare zone Location Opened Connections
km mi
Elizabeth Quay -0.6 -0.4 1/FTZ Perth 15 October 2007 Bus at Elizabeth Quay Bus Station
Services continue on the Mandurah line
Perth Underground 0.0 0.0 1/FTZ Perth 15 October 2007 Bus at Perth Busport
Australind, Airport, Armadale, Fremantle, Midland and Thornlie lines
Leederville 2.4 1.5 1 Leederville, West Leederville 20 December 1992 Bus
Glendalough 5.6 3.5 1 Glendalough, Osborne Park, Mount Hawthorn 21 March 1993 Bus
Stirling 8.8 5.5 2 Innaloo, Osborne Park, Stirling 21 March 1993 Bus
Warwick 14.5 9.0 2 Carine, Duncraig, Hamersley, Warwick 21 March 1993 Bus
Greenwood 17.7 11.0 2 Duncraig, Greenwood, Kingsley, Padbury, Sorrento 29 January 2005
Whitfords 19.8 12.3 3 Craigie, Kingsley, Padbury, Woodvale 21 March 1993 Bus
Edgewater 22.9 14.2 3 Edgewater, Heathridge 20 December 1992
Joondalup 26.2 16.3 3 Joondalup 20 December 1992 Bus
Currambine 29.2 18.1 4 Currambine, Joondalup 8 August 1993
Clarkson 33.2 20.6 4 Clarkson 4 October 2004 Bus
Butler 40.7 25.3 5 Butler 21 September 2014 Bus
Alkimos 5 Alkimos 2024 Bus
Eglinton 5 Eglinton 2024 Bus
Yanchep 6 Yanchep 2024 Bus

Service

The Joondalup line has three stopping patterns in addition to all stops services. All stops services run every 15 minutes during the day Monday to Sunday, every 10 minutes during the weekday peak, and every half an hour or every hour at night. In addition, there is the W stopping pattern, which stops at all stations between Elizabeth Quay and Whitfords, terminating there. This runs every 10 minutes during the weekday peak, so stations between Perth and Whitfords have a service every 5 minutes in each direction during peak. There is also the K stopping pattern, which stops at all stations between Perth and Clarkson, terminating there. This runs every 10 minutes towards Perth before peak instead of W pattern services, and every 10 minutes towards Clarkson after peak instead of W pattern services. The other stopping pattern is the P stopping pattern, which runs from Whitfords to Perth Station, instead of Perth Underground. There is one P stopping pattern service per weekday, departing Whitfords at the end of the morning peak.[28][29]

Rolling stock

Electric passenger train viewed from bridge
Transperth B-series train south of Butler station

The Joondalup line is operated exclusively by Transperth B-series trains,[26]:79 which are three cars long each, and are typically coupled together to form six car sets. These trains have a maximum speed of 130 kilometres per hour (81 mph), and have two doors on each side per car.[30] Previously, there were Transperth A-series trains operating on the line. These trains are two cars long, typically coupled together to form four car sets, have a maximum speed of 110 kilometres per hour (68 mph), and have two doors on each side per car. As more B-series trains were delivered, A-series trains were moved from the Joondalup and Mandurah lines to the other lines on the network.[31] Starting in 2022, Transperth C-series trains will be operating on the Joondalup line. These trains will be six cars long, have a maximum speed of 130 kilometres per hour (81 mph), and have three doors on each side per car. The higher number of doors will help reduce dwell times at stations, making 18 trains per hour possible. B-series trains will be gradually transferred onto the other lines to replace A-series trains.[32][33] By about 2031, all trains on the Joondalup line will be C-series trains.[26]:79

In May 2002, the government signed a contract with EDI RailBombardier Transportation for the delivery and maintenance of 31 three car B-series trains, and the construction of the Nowergup depot.[30] In December 2006, the government signed another contract for 15 more three car B-series trains.[34][35] The first of these additional railcars were delivered in 2009, allowing several A-series trains to be moved from the Joondalup and Mandurah lines to other lines on the network, and for frequencies to increase on most lines, including the Joondalup line.[31] In July 2011,[36] the government ordered 15 more three car B-series trains.[37][38] In August 2012, this order was increased by two, to cater for the opening of Aubin Grove station on the Mandurah line. In November 2012, this order was increased by five, bringing the total order to 22 three car trains.[36][39] By the final delivery from that order, all trains operating on the Joondalup and Mandurah lines were B-series trains.[39] In December 2019, the government signed a contract with Alstom for the construction of 41 six car C-series trains. These trains are expected to be delivered starting in 2022.[40]

Most trains on the Joondalup line are stored and cleaned at Nowergup depot. There is also Mandurah depot on the southern end of the Mandurah line, which can store and clean a smaller number of trains. Maintenance occurs at Nowergup depot.

Patronage

Below is the annual patronage of the Joondalup line from July 2010 to June 2023. Figures are provided as total boardings, which includes all fare-paying boardings and free travel on stations within the free transit zones as well as transfers between stations. The figures for rail replacement and special events services are not included in the total.[41]

Joondalup line annual patronage
YearPatronage±%
2010–1115,611,836
2011–1216,700,234+6.97%
2012–1317,449,891+4.49%
2013–1416,897,361−3.17%
2014–1517,105,797+1.23%
2015–1616,917,029−1.10%
2016–1716,658,559−1.53%
2017–1816,477,387−1.09%
2018–1916,531,788+0.33%
2019–2013,374,710−19.10%
2020–2111,885,779−11.13%
2021–2211,752,572−1.12%
2022–2314,045,991+19.51%

References

  1. "Railway (Northern & Southern Urban Extensions) Act 1999" (PDF). Western Australia Government Gazette. 5 October 2004. p. 4319. Archived from the original (PDF) on 12 February 2020.
  2. Public Transport for Perth in 2031: Mapping out the Future for Perth's Public Transport Network (PDF) (Draft for Consultation). Perth: Department of Transport, Government of Western Australia. July 2011. Archived (PDF) from the original on 2 March 2022. Retrieved 4 January 2022.
  3. "Yanchep Rail Extension". MetroNET. MetroNET Taskforce. Archived from the original on 26 February 2021. Retrieved 17 February 2021.
  4. "State Budget delivers continued METRONET investment". Metronet. 11 May 2023. Retrieved 14 May 2023.
  5. Our History Archived 22 January 2016 at the Wayback Machine Public Transport Authority
  6. Trial of first northern suburbs electric train a success Archived 10 January 2016 at the Wayback Machine Minister for Transport 20 November 1992
  7. Northern suburbs an instant hit Archived 10 January 2016 at the Wayback Machine Minister for Transport 21 December 1992
  8. Bus/train interchanges on northern subs railway to open February Archived 10 January 2016 at the Wayback Machine Minister for Transport 28 January 1993
  9. Inspection of Joondalup train-bus interchange Archived 10 January 2016 at the Wayback Machine Minister for Transport 21 March 1993
  10. Opening of Currambine station next month Archived 16 February 2016 at the Wayback Machine Minister for Transport 17 July 1993
  11. Quinlan, Howard; Newland, John (2000). Australian Railway Routes 1854 - 2000. Redfern: Australian Railway Historical Society. p. 66. ISBN 0-909650-49-7.
  12. "Off-peak train service reduction 'minor'". Public Transport Authority. Archived from the original on 3 July 2009. Retrieved 6 July 2009.
  13. Annual Report year ended 30 June 2005 Archived 4 March 2016 at the Wayback Machine Public Transport Corporation
  14. Services commence from Greenwood Railway Station Archived 22 December 2015 at the Wayback Machine Premier of Western Australia 29 January 2005
  15. Perth CBD's first underground train station in operation Archived 10 January 2016 at the Wayback Machine ABC News 15 October 2007
  16. "Media Statements". Public Transport Authority. Archived from the original on 27 April 2015. Retrieved 4 September 2014.
  17. Pond, Laura (7 September 2017). "$441m commitment to make Yanchep rail line a reality". Perth Now. Community Newspaper Group. Archived from the original on 14 May 2020. Retrieved 7 September 2017.
  18. de Kruijff, Peter (9 September 2021). "State projects delayed to ease pressure on 'hot' WA construction market". WAtoday. Archived from the original on 9 September 2021. Retrieved 9 September 2021.
  19. Clarke, Jenna (9 September 2021). "Metronet projects, including Thornlie-Cockburn link and Yanchep train line, will be delayed by 12-months". The West Australian. Archived from the original on 9 September 2021. Retrieved 9 September 2021.
  20. "Projects adjusted to deliver a strong economy for the long term". Media Statements. Archived from the original on 9 September 2021. Retrieved 9 September 2021.
  21. "One small step for Yanchep, one giant leap for Perth-kind!". Metronet. 16 May 2023. Archived from the original on 16 May 2023. Retrieved 16 May 2023.
  22. "WA Australian Sports Centre Trust to take over ownership of the Arena Joondalup". Media Statements. Retrieved 6 March 2021.
  23. "Structure Plan for Arena Joondalup Precinct" (PDF). City of Joondalup. Archived (PDF) from the original on 29 March 2022. Retrieved 6 March 2021.
  24. "Train services slowed due to extreme heat". Public Transport Authority. 4 February 2020. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  25. Coles, Brittany (6 February 2020). "Transperth reduces speed of trains due to extreme heat". Rail Express. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  26. "HCS SWTR Book 1 - Scope of Works DRAFT 01-09-21_Redacted". Tenders WA. 30 September 2021. Archived from the original on 20 January 2022. Retrieved 20 January 2022. Click Download Now, then Download for Information Only. Make sure HCS SWTR Book 1 - Scope of Works DRAFT 01-09-21_Redacted.pdf is selected, then click Download Documents.
  27. "Manual – Rail Access" (PDF). Public Transport Authority. 30 August 2021. p. 10. Archived (PDF) from the original on 21 September 2021. Retrieved 21 September 2021.
  28. "Joondalup Line". Joondalup Line Timetable (PDF). Transperth. 1 May 2023 [effective from 12 June 2023].
  29. "Joondalup Line Train Timetable" (PDF). Transperth. Archived (PDF) from the original on 5 October 2021. Retrieved 8 August 2021.
  30. "Railcar contract seals railway commitment". Media Statements. 12 May 2002. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  31. "Timetables change as train capacity boosted". Media Statements. 4 June 2009. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  32. "WA Railcar Program Project Definition Plan" (PDF). Metronet. December 2018. Archived (PDF) from the original on 18 January 2022. Retrieved 18 January 2022.
  33. "WA Railcar Program". Metronet. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  34. "More trains for Perth's transport system". Media Statements. 19 September 2006. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  35. "WA Government secures new railcars". Media Statements. 22 September 2006. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  36. Carter, Mark (6 November 2013). "Perth grapples with growth and funding challenges". International Railway Journal. Archived from the original on 28 September 2020. Retrieved 18 January 2022.
  37. "State Budget 2011-12: Supporting our Community; Building the State (Transport) - Massive injection to build WA's road, rail and bus networks". Media Statements. 19 May 2011. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  38. "State Budget 2011-12: Building the State - Funding for new railcars for Perth's growing transport system". Media Statements. 23 May 2011. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  39. "More rail cars for Perth transport system". Media Statements. 4 November 2012. Archived from the original on 19 January 2022. Retrieved 18 January 2022.
  40. "Historic contract signed for WA-made METRONET railcars". Media Statements. 10 December 2019. Archived from the original on 20 January 2022. Retrieved 20 January 2022.
  41. "Transperth patronage". Public Transport Authority. Retrieved 1 October 2023.

Media related to Joondalup railway line at Wikimedia Commons