Lakeland Freeway

The Lakeland Freeway (often called "Route 2" in the section that carries solely Ohio State Route 2) is a limited-access freeway in the northeastern suburbs of Cleveland, Ohio. It runs with and parallel to Interstate 90, and follows the shore of Lake Erie, linking the suburban areas of Lake County to Cleveland and Cuyahoga County.

State Route 2 marker

State Route 2

Lakeland Freeway
Lakeland Freeway highlighted in red
Route information
Maintained by ODOT
Length24.51 mi[1] (39.45 km)
Existed1962–present
Component
highways
I-90 from Bratenahl to Euclid

SR 2 from Bratenahl to Painesville Township

SR 44 from Mentor to Painesville Township
Major junctions
West end I-90 / SR 2 / SR 283 in Cleveland
Major intersections I-90 in Euclid
East end US 20 / SR 2 in Painesville Township
Location
CountryUnited States
StateOhio
Highway system
  • Ohio State Highway System

Route description

The Lakeland Freeway passes through the municipalities of Cleveland, Euclid, Wickliffe, Willowick, Willoughby, Eastlake, Mentor, Painesville, and Painesville Township. The freeway is eight lanes in the I-90/SR 2 section. The SR 2 section to the east had consisted of six lanes only to Vine Street, but the third lane in each direction was extended to SR 44 between 2006 and 2012.[2][3] It then narrows to four lanes from there to its eastern terminus in Painesville Township at US 20. The freeway has seen tremendous growth since it opened in the 1960s. In 2003, average daily traffic ranged from about 94,100 at the I-90/SR 2 split to 31,200 east of Painesville.[4]

History

The Lake County section of freeway was authorized by Lake County Commissioners in 1957,[3] and constructed and opened to traffic in the early 1960s. It was blended into the Cleveland Memorial Shoreway at the western end in Cuyahoga County; because of that, the "Shoreway" name is often applied to the Lakeland Freeway from its west end to the I-90/SR 2 split.[5]

Exit list

CountyLocationmikmExit[6]

[7] [8]

[9]
DestinationsNotes
CuyahogaBratenahl0.000.00




I-90 west / SR 2 west to SR 283 west / LECT (Cleveland Memorial Shoreway)
Western terminus of Lakeland Freeway
Cleveland180East 140th Street / East 152nd StreetSigned as exits 180A (East 140th Street) and 180B (East 152nd Street) eastbound
181East 156th StreetWestbound entrance and exit
182AEast 185th Street
182BEast 200th Street
Euclid183East 222nd Street
184 SR 175 (East 260th Street) / Babbitt RoadSigned as exits 184A (Babbitt Rd.) and 184B (E. 260th) eastbound
207


I-90 east to I-271 south Erie Pa.
Left exit westbound; exit numbers follow SR 2 in Lake County; eastern end of I-90 concurrency; exit 185 on I-90 westbound
LakeWickliffe208Lloyd Road (SR 633) – WickliffeAccess via Lakeland Boulevard
210East 305th Street Willowick
Eastlake211 SR 91 Eastlake
Willoughby212 SR 640 (Vine Street) Willoughby
213Lost Nation Road
Mentor215
SR 306 to US 20 Kirtland, Mentor-on-the-Lake
217 SR 615 Mentor
220
SR 44 north (Heisley Road) Grand River
Western end of SR 44 concurrency
Painesville Township221

SR 44 south to I-90 Chardon
Eastern end of SR 44 concurrency
Painesville223 SR 283 / SR 535 Painesville, Fairport Harbor
Painesville Township225 SR 535 (Fairport Nursery Road)Eastbound exit and westbound entrance
24.5139.45227
US 20 east Ashtabula
Eastern terminus of Lakeland Freeway / SR 2
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

Template:Attached KML/Lakeland Freeway
KML is from Wikidata
  1. Technical Service Straight Line Diagrams Archived May 22, 2008, at the Wayback Machine from The Ohio Department of Transportation
  2. "State Route 2 Modernization & Lane Addition, Lake County". Ohio Department of Transportation District 12.
  3. Improving State Route 2 Project Plan Archived July 21, 2011, at the Wayback Machine (Lake County Engineer's Web Site)
  4. Purpose and Need Statement to Improve State Route 2 (Lake County Engineer's Web Site) from ARCADIS FPS via Archive.org
  5. Example: John, Andrew (June 27, 2011). "Wind Turbine Starts Up in Euclid above Lincoln Electric Co". The Plain Dealer. Retrieved June 28, 2011. The sprawling blades on Ohio's largest wind turbine started turning 278 feet above the headquarters of Lincoln Electric this weekend in Euclid...located a few hundred yards from the Shoreway....
  6. "Ohio Highways: OH 2 Exit Guide". June 18, 2004. Archived from the original on June 18, 2004. Retrieved January 8, 2016.
  7. "Ohio Highways: Interstate 90 Exit Guide". June 17, 2004. Archived from the original on June 17, 2004. Retrieved January 8, 2016.
  8. "Ohio 2 East". www.roadfan.com. Archived from the original on March 4, 2016. Retrieved May 20, 2016.
  9. "Ohio 2/Cleveland Memorial Shoreway West". www.roadfan.com. Archived from the original on March 4, 2016. Retrieved May 20, 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.