Line 19 (São Paulo Metro)

Line 19 (Sky Blue) (Portuguese: Linha 19–Celeste) is a planned line of the São Paulo Metro.[4][5][6]

São Paulo Metro Line 19 (Sky Blue)
São Paulo Metro logo
Overview
StatusProposed
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Guarulhos, Brazil
Termini
Connecting lines
Stations15 (First phase)
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) Companhia do Metropolitano de São Paulo
Depot(s)Vila Medeiros railyard[1]
Rolling stock31 6-car trains[1]
Daily ridership500,000 (projected, first phase)[2]
Ridership621,000/business day (projected, first phase)[1]
History
Planned opening2030 (estimated)[3]
Technical
Line length17.6 km (10.9 mi) (First phase)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
SignallingCBTC
Route map

Campo Belo
Jesuíno Maciel
Alvorada
Hélio Peregrino
 20 
Itaim Bibi
Parque Ibirapuera
Jardim Paulista
 16 
Brigadeiro
Bela Vista
Up arrow
Second phase
Down arrow
First phase
Bixiga train park
Anhangabaú
São Bento
Cerealista
Silva Teles
Catumbi train park
Catumbi
Vila Maria
Santo Eduardo
Cerejeiras
Vila Sabrina
Jardim Julieta
Vila Medeiros rail yard
Itapegica
Dutra
Vila Augusta
Guarulhos Centro
Bosque Maia train park
Bosque Maia

At 17.6 kilometres (10.9 mi) in length at its first phase, the line will be the first subway line to serve the municipality of Guarulhos, with Line 13-Jade of the commuter rail system already serving the city since 2018. Construction is expected to begin in 2023.[2]

Background

Guarulhos is the second-largest city in the state of São Paulo, yet was not served by rail transport until the opening of the CPTM commuter rail's Line 13-Jade in 2018. Thus, planning for Line 19 began to link Guarulhos to the São Paulo Metro, along with Vila Medeiros and Vila Maria.[2] It will be underground for its entire length.

Planning

São Paulo Metro originally planned to begin tendering for the construction of Line 19 in April 2020, but this was delayed to May.[7]

Stations

Code Station Integration City Platform[8] Status
TBA Bosque Maia Guarulhos Side platforms Planning (first phase)
Guarulhos Centro
Vila Augusta
Dutra
Itapegica
Jardim Julieta São Paulo
Vila Sabrina
Cerejeiras
Santo Eduardo
Vila Maria
Catumbi
Silva Teles
Cerealistas
São Bento
Anhangabaú
Bela Vista Planning (second phase)
Brigadeiro
Jardim Paulista  16 
Parque Ibirapuera
Itaim Bibi
Hélio Peregrino  20 
Alvorada
Jesuíno Maciel
Campo Belo

References

  1. Meier, Ricardo (14 April 2021). "Cinco consórcios participam da licitação de projeto básico da Linha 19-Celeste do Metrô". Metrô CPTM (in Portuguese). Retrieved 14 April 2021.
  2. "São Paulo Metro begins studies to build Line 19". 6 August 2019. Retrieved 6 August 2019.
  3. Meier, Ricardo (13 July 2022). "Metrô projeta abrir Linha 19-Celeste em 2030". MetrôCPTM (in Portuguese). Retrieved 14 July 2022.
  4. "PDUI-STM-RedeAltaMediaCapacidade-11-05-2016.pdf" (PDF). Retrieved 16 January 2019.
  5. http://www.domboscoitaquera.org.br/downloads/secretaria_estadual_de_transportes.pdf Seminário sobre infraestrutura e sistema viário para a copa 2014 e o desenvolvimento da zona leste, Jurandir Fernandes, Secretário dos Transportes Metropolitanos, 25/08/2011
  6. "Metrô contrata estudos para três linhas an zona norte de SP".
  7. "Contractual wrangles delay São Paulo metro schemes". Railway Gazette International. 1 April 2020. Retrieved 20 June 2020.
  8. "Licitação do projeto básico da Linha 19-Celeste do Metrô é anulada pelo TCE". Metrô CPTM (in Brazilian Portuguese). 2020-09-10. Retrieved 2020-09-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.