Manton Dam
Manton Dam is a small concrete arch dam on the Manton River, approximately 70 km (43 mi) south of Darwin, Northern Territory in Australia. The dam was originally constructed by the Department of Defence during the Second World War to provide a reliable supply of fresh water to Darwin, completed in 1942.[4] The reservoir itself is now mostly used for recreation, such as fishing, boating and water skiing, surrounded by a conservation area for native flora and fauna.
Manton Dam | |
---|---|
Location | Coomalie Shire, Northern Territory, Australia |
Coordinates | 12.84037°S 131.12717°E[1] |
Purpose | Water supply |
Status | Decommissioned |
Opening date | 1942 |
Dam and spillways | |
Type of dam | Arch dam |
Impounds | Manton River |
Height | 24 m (79 ft) |
Dam volume | 13.3 GL (2.9×10 9 imp gal; 3.5×10 9 US gal) |
Reservoir | |
Catchment area | 83.9 km2 (32.4 sq mi) |
Power Station | |
Operator(s) | PowerWater |
Commission date | 12 February 2014 |
Turbines | 1 |
Installed capacity | 4kW |
Sources[2][3] |
Current status
The much larger Darwin River Dam was commissioned in 1972, with Manton Dam retained for emergency supply. Since then, the Power and Water Corporation has maintained the dam and infrastructure in an inactive state.[4] Since 1989, the Manton Dam Recreation Area has been open to the public within the portfolio of Northern Territory Parks and Wildlife.[5] Although camping and swimming are not permitted, it is a popular venue for recreational water sports. The reservoir is divided into three distinct zones, allowing separation between high speed watercraft like jet skis, an area for towing skiers and an area for kayaks, canoes, and sailing. The lake is also stocked with various fish species, with fishing permitted in all zones.[5] The environment around the dam is an excellent habitat for crocodiles, which Parks and Wildlife regularly patrol and survey to trap and remove many of these animals, especially during the wet season.[6]
In February 2014, an experimental hydroelectric generator was installed by the Power and Water Corporation in partnership with Charles Darwin University's Centre for Renewable Energy. Outputting roughly 4kW, the small generator is connected to the mains power grid to take advantage of seasonal releases and spillages during the wet season, and is the first of its kind in the Territory.[3]
Future re-use
Power and Water Corporation's 2013 Darwin Region Water Supply Strategy outlines plans to reactivate Manton Dam to supply water in order to mitigate shortages before 2025, extracting up to 7,400 ML (1.6×10 9 imp gal; 2.0×10 9 US gal) per year to meet growing demand.[4] In 2019, it was estimated that associated works would cost $122 million.[7] A 2018 report prepared by the CSIRO included a detailed investigation of potential dam sites to meet the future needs of the region. This report found that while Manton Dam could provide a short-term solution until a much larger storage can be created, there are some concerns over water quality.[2]
References
- "Place Names Register Extract for "Manton Dam" (Reservoir)". NT Place Names Register. Northern Territory Government. Retrieved 8 January 2022.
- "Assessment of surface water storage options in the Fitzroy, Darwin and Mitchell catchments". CSIRO. 2018. Retrieved 8 January 2022.
- Utility Magazine (21 March 2014). "Hydro-electric power comes to the Northern Territory".
- "Darwin Region Water Supply Strategy" (PDF). Power and Water Corporation. 2013. Retrieved 8 January 2022.
- "Manton Dam Recreation Area - Fact Sheet" (PDF). Parks and Wildlife Commission of the Northern Territory. Retrieved 8 January 2022.
- Isabella Hood (18 January 2018). "Crocodile removed from Manton Dam". Northern Territory News.
- Ruth Cooper (17 June 2019). "Future-proofing the Top End's water supply". Australian Water Association.