Matabeleland Zambezi Water Project

The Matabeleland Zambezi Water Project (MZWP) is an ambitious project being undertaken in the arid Matabeleland North province of Zimbabwe.The project seeks to end the perennial water shortages bedevilling Zimbabwe's second city of Bulawayo by bringing water from the mighty Zambezi river to the city.

Gwayi-Shangani
Gwayi-Shangani
Gwayi-Shangani is located in Zimbabwe
Gwayi-Shangani
Gwayi-Shangani
Gwayi-Shangani is located in Africa
Gwayi-Shangani
Gwayi-Shangani
Coordinates18°30′26″S 27°11′22″E
Type(project) reservoir
Catchment area39,076 km2 (15,087 sq mi)
Basin countriesZimbabwe
Max. depth70 m (230 ft)
Water volume634 million cubic metres (514,000 acre⋅ft)
Surface elevation817 m (2,680 ft)

The Project

The project can be classified as a Major Project. It is expected to cost US$600 million which is a huge investment by African standards. The project will consist of three phases as follows:

  • Phase One: Gwayi-Shangani Dam
  • Phase Two: Gwayi-Shangani Dam to Bulawayo Pipeline
  • Phase Three: Gwayi-Shangani Dam to Zambezi River Pipelne

Phase One: Gwayi-Shangani Dam

The Gwayi-Shangani dam is the first phase of the MZWP and is the core of the project. Commenced in September 2004 it is expected to provide a reservoir for this project. The dam will be located about 6 km downstream of the confluence of the Gwayi River and Shangani River.

Dam Type and Description

  • Type: It is a Roller Compacted Concrete gravity dam, which means it is a dam relying on its weight for stability.
  • Dimensions
    • Length: 305 metres from one mountain to the other.
    • Width: 60 metres at the base.
    • Height: 70 metres maximum.
    • Bridge: Dam will have a bridge at the top of width 8 m.
  • Depth and Capacity
    • Maximum water depth: 59 metres, 11 metres freeboard.
    • Capacity: 634 million m³
    • 10% Yield: 210 million m³
  • Materials Used And Quantities

Phase Two: Gwayi-Shangani Dam to Bulawayo Pipeline

The envisaged pipeline will be 260km. Construction of the pipeline is scheduled to be completed in 2022. In April 2021, the Government of Zimbabwe floated a tender for the construction of the pipeline.

References

    Further reading

    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.