Kanti Thermal Power Station

NTPC Kanti also known as George Fernandes Thermal Power Plant Station[1] is located in Kanti, Muzaffarpur, Bihar.[2] George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC.[3] The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.[4]

Kanti Thermal Power Station (NTPC Kanti)
Official nameMuzaffarpur Thermal Power Station, MTPS/KBUNL/GFTPS
CountryIndia
LocationKanti, Bihar
Coordinates26.07°N 85.24°E / 26.07; 85.24
StatusOperational
Commission date1985
Owner(s)NTPC and BSPHCL or BSEB
Operator(s)Kanti Bijlee Utpadan Nigam Ltd. (KBUNL)
Thermal power station
Primary fuelCoal
Power generation
Units operational2 X 110 MW + 2 X 195 MW
Make and modelBHEL
Nameplate capacity610 MW

7 MW ( approx)

In November 2013, Chief Minister Nitish Kumar said that another new 500 MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2×195 MW plant in March 2015.[5][6]

The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned. East Central Railway will provide uninterrupted supply of coal to the thermal power station.[7] The electrification work between Kaparpura and Kanti stations will be completed.

History

First started in 1985, Kanti Power Plant had an initial installed capacity of 110×2 MW. An additional capacity of 195×2 MW was erected in 2015-16. Kanti thermal Power Plant came into existence with the efforts of then MP of Muzaffarpur, George Fernandes.[8][9][10] The construction of the plant began during George's first tenure as MP of Muzaffarpur in 1978.[11] In November 2014, Kanti plant was renamed as George Fernandes Thermal Power Plant to acknowledge his contribution.[12][13] To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named Vaishali Power Generating Company Limited with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008.[14][15] Present equity holding is 100% by ntpc and now it's not a joint venture but is a wholly owned subsidiary company of ntpc. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 crores.

In March 2013, the renovation work of two old units was completed. MTPS started commercial production from November 1, 2013 by supplying 94 MW. This is first generation in 11 years since 2002.[16] On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Kanti Thermal Power Station to National Thermal Power Corporation.[17] On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease.[18][19][20]

In May 2023, NTPC Kanti secured the first position in Bihar and tenth position in India among power generation corporations, in terms of better plant load factor in the rankings released by Central Electricity Authority (India). Its plant load factor stood at 87.58%.

Capacity

StageUnit NumberInstalled Capacity (MW)Date of CommissioningStatusNotes
Stage-11110March 1985, recommissioned November 2013OperationalThis unit went down in 2003 and then its renovation started by Bharat Heavy Electricals in April 2008 and is now running at full capacity since November 2013 [21]
Stage-12110March 1986, recommissioned November 2014OperationalThis unit too is non functional since 2003 and was also renovated by Bharat Heavy Electricals.[22] But, since 14 November 2014 this unit has been functional after the renovation and modernisation work.[23][24]
Stage-231955 May 2015OperationalThe original planned capacity of the unit was 250 MW but was reduced to 195 MW Scheduled after Airport Authority of India raised concern over its chimney height.[25]

Bhel commissioned the first 195MW unit at Muzaffarpur Thermal Power Station in India on 5 May 2015. The commissioning is the first of the two units at 390MW Muzaffarpur Thermal Power Station (TPS).[26]

Stage-2419513 June 2016OperationalOriginal planned capacity was 250 MW but reduced to 195 MW.[27] Total installed capacity becomes 610 MW.
Total610

See also

References

  1. "Nitish vocal tonic to counter BJP claims". Archived from the original on March 28, 2015.
  2. Pranava K Chaudhary (2014-01-30). "Bihar to get 5k MW by 2015". Times of India. Retrieved 2016-08-07.
  3. Mishra, Satyavrat (2013-03-31). "Kanit, Barauni power plants to be ready by December". Business Standard India. Business Standard. Retrieved 2013-11-05.
  4. "Trial Run Successful at renovated Kanti Thermal Power Station". Retrieved 22 August 2013.
  5. "BHEL commissions 195-MW thermal power unit in Bihar". Business Standard India. 4 May 2015.
  6. "BHEL gains 2.5%, commissions 195 MW thermal unit in Bihar". StocksMarket.in. Retrieved 2016-08-07.
  7. "Railways assures NTPC of uninterrupted coal supply". The Times of India.
  8. "Barh, Karanpura projects leave questions unanswered". The Times of India. Archived from the original on 2013-10-21. Retrieved 2013-11-05.
  9. TNN Apr 25, 2004, 03.30am IST (2004-04-25). "George hopes for a smooth comeback". The Times of India. Archived from the original on 2013-10-21. Retrieved 2013-11-05.{{cite web}}: CS1 maint: multiple names: authors list (link)
  10. "The Telegraph - Calcutta : Nation". Telegraphindia.com. 2004-04-26. Archived from the original on June 24, 2004. Retrieved 2013-11-05.
  11. "Leading by example". Archived from the original on May 10, 2014.
  12. "Kanti's 110MW second unit starts power generation". The Times of India.
  13. "Key Contests: George Fernandes vs Bhagwan L Sahni | Business Standard News". Business Standard India. Business-standard.com. 23 April 2004. Retrieved 2016-08-07.
  14. "NTPC to take over Kanti, Nabinagar JV plants for Rs3,000 crore". 11 March 2018.
  15. "NTPC to take over Kanti, Nabinagar JV plants". The Economic Times.
  16. Anand Raj (1999-03-01). "Power trickle boost to energy". Telegraphindia.com. Archived from the original on November 5, 2013. Retrieved 2013-11-05.
  17. "Patna to hand over 3 power plants to NTPC". The Times of India.
  18. "State happy with power deal". Archived from the original on May 18, 2018.
  19. "Bihar transfers 3 power plants to NTPC on lease for 30 years". The Times of India.
  20. "NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar".
  21. "500MW power plant at Kanti soon: Nitish". Times of India. 2013-11-18. Retrieved 2016-08-07.
  22. Anand Raj (2013-11-05). "Power trickle boost to energy". Telegraphindia.com. Archived from the original on November 5, 2013. Retrieved 2016-08-07.
  23. Anand Raj (2014-11-09). "Baby steps to power target". Telegraphindia.com. Archived from the original on November 29, 2014. Retrieved 2016-08-07.
  24. "Kanti's 110MW second unit starts power generation". Times of India. 2014-11-15. Retrieved 2016-08-07.
  25. "New Projects". Archived from the original on 2013-10-15. Retrieved 2014-08-21.
  26. "Bhel commissions 195MW unit at Muzaffarpur Thermal Power Station in India". 4 May 2015.
  27. "BHEL commissions 195 MW unit at Muzaffarpur plant". Moneycontrol.com. 2016-06-14. Retrieved 2016-08-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.