Nadym River Bridge

The Nadym River Bridge is a combined single-level bridge that was opened on September 11, 2015. It is located simultaneously on the SurgutSalekhard highway and on the SalekhardNadym – Korotchaevo railway line. It is an element of the Northern Latitudinal Railway project, designed to link the Arctic region with the central areas of Russia and the Urals.

Nadym River Bridge

Мост через Надым
Coordinates65°33′11″N 72°43′13″E
Carriescombined(Trains, Motor vehicles)
CrossesNadym
LocaleNadym, Yamalo-Nenets Autonomous Okrug, Tyumen Oblast
Characteristics
Total length1334 m
Longest span110 m
History
Opened2015
Location

The total length of the passage is 3.1 km, including the bridge (1334 m) and access areas (1770 m). The length of the superstructure is 110 m. The construction started in 2011, and the road crossing was opened in 2015. The construction of the railway part of the bridge was postponed.[1]

The construction companies that participated in the erection of the bridge are OJSC Mostostroy-11 , CJSC Kurganstalmost , and Llc Urengoydorstroy.[2]

Notes

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.