Empresa de Ferrocarriles Ecuatorianos

The Ferrocarriles del Ecuador Empresa Pública (Ecuadorian Railways Company) is the national railway of Ecuador. The railway system was devised to connect the Pacific coast with the Andean highlands. After many decades of service the railway was severely damaged by heavy rainfall during the El Niño in 1997 and 1998[1][2] and from general neglect as the Pan-American Highway siphoned off passengers.[3]

Railways in Ecuador:
  Routes with passenger traffic
  Routes in usable state
  Unusable or dismantled routes

In 2008 the president Rafael Correa named the railroad a "national cultural patrimony" and indicated that it would be restored.[2] The government of Ecuador started to rehabilitate the railway and service was restored between Guayaquil and Quito by 2013.[3][4]

An extensive range of services, primarily for leisure travellers, were operated by steam and diesel-electric locomotive hauled trains and by autoferros (bus bodies mounted on rail chassis).

All railway services ceased in 2020 and by presidential decree the liquidation of the railway company commenced.[5]

Construction

Baldwin 2-8-0 of the G&Q Line
1908, during the construction

The project of an Ecuadorian railway was started by President Gabriel García Moreno in 1861. The first section was opened between Yaguachi and Milagro in 1873, and Bucay was reached by 1888.[6]

The push into the Andes was made under President Eloy Alfaro who planned to link Quito in the highlands to Guayaquil on the coast of Ecuador. For advice, Alfaro turned to Col. William Findlay Shunk, a well-known North American engineer who designed the New York El, and who had mapped a route of the InterContinental Railway (which was to connect North and South America) through Ecuador, Colombia, and Panama in 1892. The InterContinental Railway was never built. However, in 1897, Eloy Alfaro commissioned a contract with Archer Harman and a team of investors for the newly created New Jersey corporation, the Guayaquil and Quito Railway Company," or the G&Q, to rehabilitate and complete the railroad from Guayaquil to Quito. Archer Harman and his brother, Major John A. Harman (Col. Shunk's son-in-law) were from Staunton, Virginia. Together, Archer (G&Q financier) and John (G&Q Chief Engineer) helped Alfaro to (1) realize his dream of connecting disparate parts of Ecuador, (2) break the hold of the Catholic Church, and (3) usher the 20th Century and modernity into Ecuador.

The G&Q line was built between 1897 and 1908,[2] when the line reached Quito amidst celebration that lasted for days, and shortened the often lengthy trip from Quito to Guayaquil to two days.

The G&Q Railway evolved into the Southern Division (Division Sur) of Empresa de Ferrocarriles Ecuatorianos.

The northern line, continuing from Quito to San Lorenzo was completed in 1957.[6]

A branch from the G&Q at Sibambe to Cuenca was completed in 1965.[6]

Other public former railways

Ferrocarril Ambato - Cururay. Commenced from Ambato (on the G&Q Southern Division), reached Pelileo (35km) and was intended to continue to Baños de Agua Santa, located on the banks of the Pastaza River then intended to extend until it crossed the Arajuno River and reached a navigable point on the Curaray, a total length of 117km. Construction commenced in 1912 and the company ceased operating in February 1936.[7]

Ferrocarril de Bahia a Chone. Commenced at Bahia de Caraquez and ran to Chone (79km). Construction commenced in 1909 and was completed in 1912. The line ceased 'in the mid 1960's'.[8][9]

Ferrocarril Central de Ecuador. Commenced at Manta and ran to Santa Ana. Construction commenced in 1911 and was completed in 1913. Services ceased in 1946.[10]

Ferrocarril de Guayacil a Salinas. Commenced at Guyaquil and ran to Salinas (152km). Construction was completed in 1936. Services ceased in 1954.[11]

Ferrocarril de el Oro. Commenced at Puerto Bolivar and ran to Piedras (75km) with Loja as the intended terminus. The line had two branches from Machala (6km from Puerto Bolivar), one to Pasaje with Cuenca as the intended terminus, and one to La Iberia with Duran as the intended terminus. Construction commenced around 1893. Services ceased for certain by 1971, probably earlier in reality.[12]

Operation

Tourist train, in Alausí, to the "Nariz del Diablo", 2008

The railway represents the largest infrastructure of the country a total length of 965.5 kilometres (600 mi). Its single track uses a gauge of 3 ft 6 in (1,067 mm). The 446.7 kilometres (277.6 mi) Southern Division (Division Sur) starts at the harbour of Guayaquil with a ferry to Duran and then heads east into the Andean mountains where a more than 2.5 kilometres (8,200 ft) difference in altitude has to be overcome to reach Riobamba at 2,754 metres (9,035 ft). A major gain in altitude is made at the Devil's Nose (Nariz del Diablo) where the train shunts back and forth along the rocky promontory. From Riobamba the train heads north passing its highest point at Urbina an altitude of 3,609 metres (11,841 ft) to reach Quito at an altitude of 2,850 metres (9,350 ft).

The 373.4 kilometres (232.0 mi) Northern Division (Division Norte) was completed in 1957.[6] It connects Quito to the northern sea port of San Lorenzo over Ibarra, Primer Paso and Cachavi.

The Cuenca line branches off near Sibambe and represents the 145.4 kilometres (90.3 mi) Subdivision Sur. It was constructed between 1915 and 1965.[6]

A converted bus serving as a self-propelled passenger car

The railway used to be of general economic significance for many decades. Initially steam engines were obtained from the Baldwin Locomotive Works. The last set of 2-8-0 steam engines were obtained in 1953.[6] In 1957 five Alstom diesel-electric locomotives were delivered for the San Lorenzo line,[6] Ten Alco diesel-electric locomotives were delivered in 1968[6] and nine GEC-Alstom locomotives were delivered in 1992.[6] Few steam and diesel locomotives were in an operational mode, the exact numbers subject to conflicting information.[1][6] There were also a number of railbuses (autoferros) in operation.

At the point of liquidation the railway had 12 diesel-electric locomotives, 7 steam locomotives and 11 autoferro, not all operational.[13]

Demise

Since the 1997/98 disruptions no continuous service has been conducted and further degradation had made the railway almost useless. Road services have taken over passenger and freight transportation in Ecuador. At the 2008 centennial only 10 percent of the railway was open [2] only tourist trains remain active.[3]

Restoration

In 2008 the president Rafael Correa named the railroad a "national cultural patrimony"[2] and indicated that it would be restored. The EFE was transformed in a public corporation: Ferrocarriles del Ecuador Empresa Publica (FEEP). FEEP publicised details of the restoration work in a series of publications 'Guardavia', commencing with issue 1 in May 2010 and concluding with issue 11 in December 2014.

The first section of line to be inaugurated was that between Quito (Chimbacalle) and Latacunga on 30 December 2008.[14] [15]

Following this a short section (3.5km) of the former Sibambe to Cuenca line, that between El Tambo and Coyoctor / Baños del Inca was inaugurated on 24 April 2009.[14][16]

The line from the coast at Duran (near Guayaquil) to Yaguachi was inaugurated on 29 June 2010.[14][17]

Two sections of line were inaugurated in 2011. The section between Alausí and Sibambe which includes the switchback at the Devil's Nose was inaugurated on 16 February and that between Ibarra and Salinas on 13 December.[14]

The section from Colta via Riobamba to Urbina was inaugurated on 3 October 2012.[14]

The first phase of the rehabilitation project, the 271km between Quito and Guamote, was inaugurated on December 27 and 28, 2012.[14]

The second phase of the rehabilitation project, the 181km between Guamote and Duran, was inaugurated on January 28 and 29, 2013.[14] Thus by 2013 the entire Guayaquil/Duran - Quito railway was restored and open to the public.[18]

The section of line between Ibarra and Otavalo was inaugurated in 2014.[14]

Route information

Southern Division (Division Sur)

Guayaquil <> Quito; 1897-1908; 446.7 km (277.6 mi)

Location Date reached Date restored Notes Co-ordinates Other comments
Guayaquil n/a n/a Opposite bank of river to railway terminus
Durán a 1888[19] n/a Original terminus 2.169854°S 79.852652°W / -2.169854; -79.852652
Durán b 1887 2010[14][17] Workshops[6] and terminus in recent years 2.165862°S 79.847311°W / -2.165862; -79.847311
Yaguachi 1873-1875[19] 2010[14][17]
Milagro 1873-1875 2013[14]
Bucay 1888 2013[14] Workshops[6] 2.201622°S 79.136402°W / -2.201622; -79.136402
Sibambe 1902[19] 2011[14] Devil's Nose 'zig-zag', junction for Cuenca 2.243087°S 78.877978°W / -2.243087; -78.877978
Alausí 1902[19] 2011[14][20]
Riobamba 1905[19] 2012[14] Workshops[6] 1.667083°S 78.665759°W / -1.667083; -78.665759 (workshops)

1.669850°S 78.653688°W / -1.669850; -78.653688 (station)

Urbina 1906[19] 2012[14] highest point ( 1°30′01″S 78°43′59″W )
Ambato 1907[19] 2012[14][21] Original station (1905) built in what is now Av. 12 de Octubre, where the Central Market now occupies the old station grounds.

Current station (2012) located in Ingahurco next to the interprovincial bus terminal.

Latacunga 1907[19] 2008[14]
Machachi 1907[19] 2008[14]
Quito 1908[2][19] 2008[14] Workshops[6] 0.247188°S 78.516645°W / -0.247188; -78.516645 (workshops)

0.238321°S 78.515425°W / -0.238321; -78.515425 (station)

The line was officially opened on President Alfaro's birthday, June 25, 1908[2]

Northern Division (Division Norte)

Quito <> San Lorenzo; > 1957; 373.4 km (232.0 mi)

Location Date reached Date restored Notes Co-ordinates Other comments
Quito n/a construction commenced 1916 0.238321°S 78.515425°W / -0.238321; -78.515425 (station)
Cayambe 1928[19] n/a
Otavalo 1928[19] 2014[14] 0.224431°N 78.260975°W / 0.224431; -78.260975 Service suspended between Otavalo and San Roque before FEEP liquidation.
San Roque 1928[19] 2014[14] 0.300173°N 78.231108°W / 0.300173; -78.231108
Ibarra 1929[19] 2011[14] Workshops[6] and museum 0.345756°N 78.124222°W / 0.345756; -78.124222 (workshops)

0.347767°N 78.121563°W / 0.347767; -78.121563 (station)

Salinas 1945 2011[14] 0.493915°N 78.132427°W / 0.493915; -78.132427 Tourist service between Ibarra and Salinas until FEEP liquidation.
Primera Paso n/a 0.573630°N 78.126641°W / 0.573630; -78.126641 Tourist service between Ibarra and Primera Paso until early 2000s (at least 2005). Thomas Cook International Timetable for 2003 shows a service.
Lita n/a 0.875224°N 78.453689°W / 0.875224; -78.453689
Alto Tambo n/a 0.912155°N 78.547216°W / 0.912155; -78.547216 An unofficial 'jeep-train' operates north from here (towards San Lorenzo) to Venturas (location km318).
El Progresso n/a A service operated between El Progresso and San Lorenzo until around 2014. Thomas Cook International Timetable for 2010 shows a service.
Cachavi n/a San Javier de Cachavi 1.043018°N 78.767034°W / 1.043018; -78.767034
San Lorenzo 1957[19] n/a Workshops[6] 1.286165°N 78.834634°W / 1.286165; -78.834634 (station)

1.288495°N 78.839797°W / 1.288495; -78.839797 (workshops)

Sibambe - Cuenca

Sibambe <> Cuenca: > 1965: 145.4km

Location Date reached Date restored Notes Co-ordinates
Sibambe junction with Duran - Quito line 2.243087°S 78.877978°W / -2.243087; -78.877978
Chunchi 1921[19]
Tipococha 1927[19]
El Tambo 1930[19] 2009[14][16] 2.512517°S 78.924623°W / -2.512517; -78.924623
Coyoctor 2009[14][16] Baños del Inca 2.525936°S 78.914251°W / -2.525936; -78.914251
Biblian 1945[19]
Azogues 1948[19] 2.736838°S 78.852143°W / -2.736838; -78.852143
Cuenca 1965[19] 2.915928°S 78.994282°W / -2.915928; -78.994282

Comprehensive details of the lines, their stations and distances have been compiled and published by Jim Fergusson and have now been made available through The Branch Line Society in the United Kingdom.[22]

Services prior to closure

A number of leisure orientated services operated, including from Quito to Latacunga via Cotopaxi National Park, between Alausi and Sibambe (Devil's Nose / Nariz del Diablo), between El Tambo and Baños del Inca, between Duran and Yaguachi and between Ibarra and Salinas. A premium service 'Tren Crucero' operated the whole length of the Southern Division from Duran to Quito.

Closure and liquidation

Due to the impacts of the coronavirus pandemic upon the national economy, all trains were suspended in March 2020.

"All trains have been cancelled from March 17, 2020 on until further notice." Source: Volta o Trem 24-2 via Friends of Latin American Railways

Subsequent to this the company entered liquidation.

"Through Executive Decree No. 1057 of May 19, 2020, amended through executive decreess No. 1096 of July 17, 2020, No. 1123 of August 6, 2020, No. 1243 of February 2021 and No. 1288 of April 13, 2021, the Constitutional President of the Republic, ordered the extinction of Railways of Ecuador, Public Company-FEEP" [translated from original without amendment: extinction = liquidation].[5]

The official liquidators progress report provides information on the condition of the line (operational, non-operational, abandoned) at the time of liquidation.

Transfer and suggested reopening

On 5 January 2022 the railway assets were transferred to the Ecuadorian State.

Today Minister @MarceloHCabrera signed the transfer of the National Railway Infrastructure to @ObrasPublicasEc with which this patrimonial asset passes into the hands of the Ecuadorian State and marks a new stage.

@MarceloHCabrera highlighted that this system will contribute to tourism, passenger transport and sustainable mobility since there is the possibility of implementing electric trains.

After this signing, the legal and administrative processes will be carried out so that the railway system is concessioned through a Public-Private Alliance, which will allow repowering and rehabilitating the Ecuadorian train.

[translated from original without amendment]

Proposals

There are plans to expand the services further to Colombia and Venezuela.

Books

  • Elizabeth Harman Brainard and Katharine Robinson Brainard. Railroad in the Sky: the Guayaquil & Quito Railway in Ecuador 1897-1925. Publisher: Marion, MA: Atlantis Ltd. Partnership, 2003. ISBN 0-615-12411-9 ISBN 9780615124117
  • Marcelo Meneses-Jurado: Tren al Sol. Train to the Sun. Journey on Board the Most Difficult Train in the World.
  • Sandra Naranjo, Pabel Muñoz, Paola Carvajal, Richard Espinosa, Jorge Eduardo Carrera, Francisco Mosquera, Mayra Prado T. Construcción y Rehabilitación del Tren de Alfaro. Publisher: Directorio Ferrocarriles del Ecuador Empresa Pública, 2014. ISBN 978-9942-07-742-4

See also

  • Tren Crucero Ecuador

References

  1. "Plan para rehabilitar ferrocarril". El Universo. June 30, 2005. Retrieved March 23, 2009.
  2. Mark Holston. "Remnants of an intercontinental railway: considered one of the most difficult engineering tasks in the world, the Guayaquil-Quito Railroad continues to inspire awe and admiration 100 years after its completion". Retrieved March 23, 2009.
  3. Haines, Gavin, "Ecuador’s long-neglected railway system chugs back to life; its founder Eloy Alfaro would be proud," Cuenca High Life, 3 June 2013. Retrieved 8 May 2016.
  4. De Quito a Durán, en tren desde el 2012, promete EFE, El Universo, December 23rd 2009.
  5. "Ferrocarriles del Ecuador Empresa Pública, En Liquidación: Informe de Rendición de Cuentas". Official Liquidator's Progress Report. 31 December 2021. p. 4. Retrieved 16 December 2022.
  6. ferrolatino. "Aus der Geschichte der Eisenbahn in Ecuador". Retrieved March 23, 2009.
  7. CHRISTIAN ANDRÉS NIEVES CASTRO (2012). PLAN DE DESARROLLO TURÍSTICO – CULTURAL A TRAVÉS DE LA IMPLEMENTACIÓN DE ACTIVIDADES LÚDICAS EN LA RUTA DEL TREN CHIMBACALLE – EL BOLICHE (in Spanish). Quito, Ecuador: UNIVERSIDAD TECNOLÓGICA EQUINOCCIAL. p. 27.
  8. Vélez, Bernardo Avellán (19 May 2017). "Historia del ferrocarril en Manabí (I)". El Diario. Retrieved 16 December 2022.
  9. Vélez, Bernardo Avellán (8 June 2017). "Historia del ferrocarril en Manabí- (II)". El Diario. Retrieved 16 December 2022.
  10. Carrera, Jorge Eduardo (June 2012). "ELOY ALFARO INICIÓ LA CONSTRUCCIÓN DEL TREN EN MANABÍ". Guardavia (5): 8.
  11. Ramírez, Guido Patricio Yagual (2014). "Estrategias Comunicacionales de la Historia del Ferrocarril Guayaquil Salinas, y su incidencia en la recuperación de la memoria social y cultural de los habitantes de la provincia de Santa Elena, año 2014" (PDF). Universidad Estatal “Peninsula de Santa Elena”. Retrieved 16 December 2022.
  12. Machuca, Félix López (22 February 2017). "Pasado de Los Ferrocarriles de El Oro". Mashall Historica. Retrieved 16 December 2022.
  13. "Ferrocarriles del Ecuador Empresa Pública, En Liquidación: Informe de Rendición de Cuentas". Official Liquidator's progress report. 31 December 2021. p. 26. Retrieved 16 December 2022.
  14. Carrera, Jorge Eduardo (December 2013). "Hitos de la Rehabilitacion del Ferrocarril 2008-2013". Guardavia (8): 12.
  15. http://www.elcomerciodelecuador.es/component/content/article/71/834-el-tren-quito-latacunga-vuelve-por-la-avenida-de-los-volcanes.html Archived 2011-07-20 at the Wayback Machine El Comercio November 26th 2010
  16. http://www.eluniverso.com/2009/04/18/1/1447/7EDE4067B8F140409EDE18B4C55646F6.html El Universo, April 18th 2009.
  17. http://www4.elcomercio.com/2010-07-01/Noticias/Pais/Noticias-Secundarias/EC100701P15PAPA.aspx Archived 2010-07-05 at the Wayback Machine El Comercio, July 1st 2010.
  18. Ecuador by Train
  19. Ines del Pino Martinez (2013). Arquitectura Ferrovia en Los Andes del Ecuador (in Spanish). Ecuador: Consejo Nacional de Cultura. pp. 95-97 (Quito), 111-112 (San Lorenzo), 131 (Cuenca). ISBN 9789942074645.
  20. http://www.diariolosandes.com.ec/content/view/23926/36/%5B%5D Diaro Del Los Andes, December 23rd 2010
  21. "El tren llegó a Ambato — la Hora".
  22. "ECUADOR RAILWAYS — PASSENGER STATIONS AND STOPS" (PDF). The Branch Line Society.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.