New Pamban Bridge

The New Pamban Bridge (pronounced: /pɑːmbən/ romanised: pāmban) is a railway bridge under construction that will connect the town of Mandapam in mainland India with Rameswaram on Pamban Island.[1] The new bridge is constructed parallel to the iconic Pamban bridge opened in 1914 and will replace it. The new Pamban bridge with a length of 2.07 km is India's first ever vertical lift sea bridge. It is expected to be opened in 2023.[2]

New Pamban Bridge
Coordinates9°16′57.25″N 79°12′5.91″E
CarriesRail
LocaleRameswaram, Tamil Nadu, India
OwnerIndian Railways
Characteristics
Total length2.07 kilometres (1.29 mi)
No. of spans100
Rail characteristics
No. of tracks1
History
Construction startFebruary 2020
Construction end2023 (expected)
Location

Overview

The Indian Railways decided to construct a new bridge parallel to the old Pamban bridge with a length of 2.065 km when after considering its age and difficulty in maintenance. Prime Minister Narendra Modi laid the foundation stone for the new bridge in November 2019. The construction is being executed by Rail Vikas Nigam Limited at an estimated cost of ₹540 crore.[3] In February 2020, the bridge construction got under way. It will have 100 spans across the sea and is 12.5 metres above sea level. The new bridge will be 3 metres higher than the old one. The vertical lift span of the bridge is around 72 metres. The span can be lifted because of this lift span. Automatic lifting technology is used to raise the center of the bridge to allow ships to easily pass through. The new technology will allow the bridge to have a navigational air clearance of 22 meters above sea level.[4]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.