Cross Island Parkway
The Cross Island Parkway is a parkway in New York City, part of the Belt System of parkways running along the perimeter of the boroughs of Queens and Brooklyn. The Cross Island Parkway runs 10.6 miles (17.1 km) from the Whitestone Expressway (Interstate 678 or I-678) in Whitestone past the Throgs Neck Bridge, along and across the border of Queens and Nassau County to meet up with the Southern State Parkway, acting as a sort of separation point which designates the limits of New York City. The road is designated as New York State Route 907A (NY 907A), an unsigned reference route, and bears the honorary name 100th Infantry Division Parkway.
Cross Island Parkway | |
---|---|
Route information | |
Maintained by NYCDOT | |
Length | 10.57 mi[1] (17.01 km) |
Existed | June 29, 1940[2]–present |
Restrictions | No commercial vehicles |
Major junctions | |
South end | Belt Parkway / Southern State Parkway in Cambria Heights |
NY 24 in Queens Village NY 25 in Bellerose Terrace Grand Central Parkway in Glen Oaks I-495 in Alley Pond Park I-295 in Bayside | |
North end | I-678 in Whitestone |
Location | |
Country | United States |
State | New York |
Counties | Nassau, Queens |
Highway system | |
The exit numbering is a continuation of the Belt Parkway, with exit numbers increasing north. At exit 25A (Southern State Parkway), the Cross Island Parkway becomes the Belt Parkway (more specifically, the section once known as the Laurelton Parkway). Before its exits were renumbered to align with the Belt Parkway, they were numbered to co-align with the Southern State Parkway, which is why that parkway begins with exit 13 (the Cross Island Parkway was once exits 1 to 12).
Route description
The Cross Island Parkway begins at an interchange with the Belt Parkway and the Southern State Parkway in the Cambria Heights section of Queens. A short distance after exit 25B, which serves Linden Boulevard, forks off the Cross Island. The parkway runs northward along the Queens-Nassau county line upon leaving the interchange, running between Cambria Heights in Queens and Nassau's town of Hempstead (Elmont and Bellerose Terrace) as it enters Belmont Park. In Belmont Park, the Cross Island enters exit 26A, the first of two gated-entrance exit ramps for Belmont Park parking lots. After crossing under Belmont Park Road, the parkway enters exit 26B, a partial cloverleaf interchange which serves NY 24 (Hempstead Avenue in Queens Village and Hempstead Turnpike in Elmont). Paralleling the race track, the Cross Island Parkway continues north, passing west of Belmont Park's Long Island Rail Road station, where southbound exit 26C forks to NY 24.[3] Exit 26D is the final entrance ramp to Belmont Park and also provides access to UBS Arena and the Elmont Long Island Rail Road station.
After exit 26D, the Cross Island Parkway crosses under the Long Island Rail Road main line then Superior Road before crossing into the Nassau County hamlet of Bellerose Terrace. After the crossing, the parkway enters exit 27, a cloverleaf interchange with NY 25 (Braddock Avenue and Jericho Turnpike) and Jamaica Avenue before crossing back into Queens. A short distance later, the parkway enters exit 28A, serving NY 25B (Hillside Avenue) via a diamond interchange and exit 28B for Union Turnpike via a collector-distributor road. Now proceeding northwest, the Cross Island crosses under Union Turnpike and enters exit 29, a trumpet interchange with the Grand Central Parkway.[3]
After crossing under the multitude of lanes that make up the interchange and the Grand Central Parkway, the Cross Island Parkway crosses under Douglaston Parkway and enter Alley Pond Park. The Cross Island parallels the Douglaston Parkway northwest for a stretch, entering exit 30, a trumpet interchange with the Long Island Expressway (I-495) in Alley Pond Park. The parkway parallels Alley Creek as it bends further to the northwest, entering exit 31, a partial cloverleaf interchange with NY 25A (Northern Boulevard) and the Alley Pond Environmental Center. Past the junction, the highway continues on a northwestward track as it passes under the Port Washington Branch of the Long Island Rail Road and begins to run along the western edge of Little Neck Bay.[3]
After a pedestrian crossover, the parkway passes a parking lot for Bayside Marina, accessible only via the parkway's northbound lanes.[4] The Cross Island Parkway soon leaves the side of Little Neck Bay and passes south of Fort Totten Military Reservation. While south of Fort Totten, the parkway enters exit 32, a diamond interchange with Bell Boulevard. A short distance later, the parkway enters another diamond interchange, exit 33, this time for the Clearview Expressway (I-295) and the Throgs Neck Bridge. The northbound lanes also boast a ramp for Utopia Parkway (signed as exit 34). After crossing under Utopia Parkway, the Cross Island enters the Whitestone section of Queens, where southbound, an exit 34 serves 160th Street and Utopia Parkway.[3]
Continuing west, the Cross Island Parkway crosses through Whitestone, crossing under Clintonville Street, 150th-149th Streets and 14th Avenue before entering exit 35 southbound, serving 14th Avenue and Francis Lewis Boulevard. After crossing under 147th Street, the parkway enters exit 36, a partial diamond interchange with the Whitestone Expressway (I-678), which proceeds north to the Bronx–Whitestone Bridge and southbound towards John F. Kennedy International Airport. This interchange also serves as the northern terminus of the Cross Island Parkway.[3]
History
Design
The Cross Island Parkway was first proposed in 1930 by Robert Moses, President of the New York State Council of Parks, as part of a $20 million (1930 USD) plan to construct several parks and parkways throughout New York City. This proposal also included proposals for the Richmond Parkway and the corridor of the Grand Central Parkway. The proposal was held at the Hotel Commodore in Manhattan during the Park Association of New York City annual dinner, which had an attendance of 500 civic leaders. While the group accepted the idea, there were certain complaints about costs of the new projects, which were centered between Queens and Staten Island. The city had about $400 million in borrowing capacity, and that most of these projects should wait and be dealt with one at a time for funding by their importance.[5]
The project for the Cross Island soon became the northernmost part of the 33-mile (53 km) "Circumferential Parkway", a new roadway that would start at Owl's Head Park and run along the southern shores of Brooklyn and Queens.[6][7] The Cross Island Parkway piece would begin at the Bronx-Whitestone Bridge (then under construction), cross through the neighborhoods of Whitestone, Bayside and Alley Park and run along the Nassau County border until reaching the Laurelton Parkway, which would connect the Cross Island and the Southern Parkway. In December 1937, Moses, now commissioner of the New York City Parks Department, recommended the Cross Island, along with the other parkways proposed in Brooklyn, Queens, Manhattan and The Bronx would cost about $8,026,182 (1937 USD) to acquire land for and that it would erase numerous bottlenecks throughout the city.[6]
In June 1938, the Regional Plan Association proposed 27 new parks throughout the city, including three that would serve the purpose of helping construct the Cross Island Parkway. The first, an approach to the Whitestone Bridge, the city had recently gotten control of, the second; a park along Little Bay, a section of the Long Island Sound that would also connect to the Clearview golf course. The final piece was a section near Willets Point that also included Little Bay, Little Neck Bay and connecting to Alley Park. The Regional Plan Association, in coordination with Moses, requested these new park ideas as urgent, and would help improve the parkway system through New York City.[8]
The Circumferential Parkway, which would cost $28,5 million (1938 USD), was accepted on October 13, 1938; the State of New York and the city provided $16,5 million, while the other $12 million came from the Public Works Administration.[9][10] The city could not take on any more debt to fund the project, leading the New York City controller to recommend that the parkway be delayed.[11] To provide funding for the new parkway, money for a new courthouse for the Appellate Division had to be eliminated, along with subway improvements and additional funding from the 1939 capital budget. The borough of Manhattan paid 66% of the cost, while Queens and Brooklyn each paid 17%. The new parkway would help connect other transportation facilities throughout Brooklyn and Queens, and as a result, plans for a connection to South Brooklyn and the West Side and East Side Highways. The city also appropriated $3.327 million for the land acquisition for the new alignment, plus the engineering work. Moses notified the board that he had $5 million worth of contracts to let so that work could start as soon as possible. The board also accepted the $12 million federal contribution for the new project.[10]
The name of the parkway system was changed in December 1938 from the "Circumferential Parkway" to the Belt Parkway, on request by Mayor of New York City Fiorello LaGuardia, who settled an argument of different names, one of which included using the last three letters of Brooklyn and the first three of Queens to make the Lynque Parkway. However, people felt that name was a bit too absurd and Moses and the city agreed to the new Belt name, and removed the former name due to many people who could not pronounce the former name.[12] Another proposed name for the new roadway, among others, was suggested by LaGuardia, calling the road the Ringstrasse Parkway.[13] The Queens section of the Belt Parkway was ultimately named Cross Island Parkway, usurping that name from the parallel Francis Lewis Boulevard.[14]
Construction
Almost immediately after the parkway was approved by the city, bids were flowing in for new project contracts to construct the new parkways. The Belt system would be constructed via numerous contracts, which involved grading the new parkway, constructing bridges, and paving the new highway. 66 spans of bridges were going to be constructed for the entire system,[15] with the section of the Cross Island Parkway between Fort Totten and the Whitestone Bridge approach being bid on by December 23, 1938. By this point, already seven contracts totaled at over $5 million (1938 USD). S.J. Grover and Sons, a firm based out of Ridgefield, New Jersey, got the contract for the 3 miles (4.8 km) section.[16] Just three days prior, the city got bids for grading the new parkway through Springfield, Queens, between Arthur Street and Brookville Boulevard, as well as a vehicular bridge over the Cross Island Parkway at Springfield Boulevard and 225th Street. The project went to Petracca and Banco of St. Albans.[17]
In January 1939, the state government received bids for the construction of the interchange between the Whitestone and Cross Island parkways.[18] On February 4, 1939, Governor of New York Herbert Lehman gave permission to let the city construct the Cross Island Parkway piece that crossed into Nassau County. Known as the Bennett-Numan Bill, the bill also required the city to maintain and enforce laws on the Nassau County portion of the new roadway.[19][20] By February 1939, the project was already 26% along, with parts of the $6.1 million (1939 USD) section of the Belt Parkway system being completed, and eleven contracts had been awarded. On February 24, 1939, the city let a contract to National Excavation Corporation for construction of the Cross Island Parkway between Hillside Avenue and 91st Avenue in Queens.[21]
The thirteenth contract of the project, let on March 10, would pave the Cross Island Parkway from Hempstead Turnpike to Linden Boulevard, a 1 mile (1.6 km) long stretch in Queens, a new separation between 115th Avenue and one at Linden Boulevard. Good Roads Engineering and Contracting Company of Wantagh won the contract with a bid of $597,794.[22] On March 21, 1939, bids were opened to construct three new bridges along the Cross Island Parkway in Whitestone; the Elmhurst Contracting Company of Corona received the contract.[23][24] On March 22, the city offered a contract of the grade separation of the Cross Island Parkway over the Long Island Rail Road's Main Line and its spur to Belmont Park, along with separation for nearby Superior Road. The project also included paving of the Cross Island between Jamaica Avenue and Hempstead Avenue. The contract went to the National Excavation Corporation.[25] The state also received bids for paving the Cross Island between 46th Avenue and the Grand Central Parkway; the low bidder for that contract was Andrew Weston Inc.[26] By March 31, 1939, the twentieth contract for the system was let, constructing a new bridge for the Grand Central Parkway to cross over Winchester Boulevard and westbound Grand Central traffic over the Cross Island Parkway.[27]
On June 13, 1939, bids for construction of the new interchange between the Laurelton Parkway, Southern State Parkway and construction of the new parkway between Linden Boulevard and 129th Avenue.[28] Landscaping of the new parkway began around September, when topsoiling and gardening began between the Creedmore State Hospital and Laurelton Parkway.[29][30] By December, 92% of the landscaping contracts had been announced, with the recent section between the Grand Central Parkway and Fort Totten.[31]
Opening
While construction continued on the Belt Parkway system, including the Cross Island Parkway, construction was wrapping up on construction of the Bronx-Whitestone Bridge, which opened with a ceremony on April 29, 1939. LaGuardia and Moses both praised the construction of the Cross Island Parkway as the important part of the Whitestone side of the new bridge.[32] By 1940, final bids on the new project were still coming in for the Belt Parkway projects, which included a contract let on April 17, 1940 for new fencing along the three parkways. Ross Galvanizing Works in Brooklyn won the contract for fencing between North Conduit Avenue and the Bronx-Whitestone Bridge along the Southern, Laurelton and Cross Island.[33] On May 22, 1940, a contract was let to Frank Mascali and Sons, which paved, drained, filled and graded sections of the Cross Island Parkway between the Grand Central and the Bronx-Whitestone Bridge.[34]
Two hundred construction workers formally toured the parkway on June 8, 1940.[35] It was announced that the entire Belt Parkway system, 34.9 miles (56.2 km) long, would open to traffic on June 29, 1940, with a ceremonial trip along the entire roadway. With a final total of nearly $30 million (1940 USD), the road was complete except for a portion between Plumb Island and Ocean Parkway near Coney Island. The due date on the Public Works Administration funding, set for June 30, 1940, was met, and the new parkway would have Moses, LaGuardia and the administrator of the PWA, John Carmody. The new parkway was groomed overnight by 1,700 workers to prepare for the opening. The general public was allowed to use the new parkway after the special dignitaries car had passed.[2][36] The project also included the addition or renovation of several playgrounds and public parks, such as Crocheron Park.[37]
Later years
In 1952, the Triborough Bridge and Tunnel Authority awarded a $920,000 contract to widen about 11 miles (18 km) of the Cross Island Parkway from four to six lanes. As a result of this project, nearly all of the Belt Parkway system was six lanes wide, except for a four-lane section in Laurelton.[38][39] The TBTA also installed overhead navigational signs at several interchanges in 1953.[40]
The state announced a plan to renovate the Long Island Expressway (I-495) in the vicinity of Alley Pond Park and the Cross Island Parkway in 1995.[41] In 2000, Pataki and New York City mayor Rudy Giuliani announced that the segment of I-495 near Alley Pond Park and the Cross Island Parkway, would be rebuilt at a cost of $112 million.[42][43][44] Work started in August 2000 and was substantially completed by 2005.[45] The project included the restoration of 12 acres (4.9 ha) within the park, as well as the construction of new ramps between I-495 and the Cross Island Parkway at exit 30.[46] As part of the reconstruction, two cloverleaf ramps were replaced with flyovers; the shoulders in each direction were converted into travel lanes; and new collector-distributor ramps were installed on I-495 east of the Cross Island Parkway interchange.[45][44]
Exit list
Exit numbers continue from with those of the Belt Parkway.
County | Location | mi[1][47][48] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|
Queens | Cambria Heights | 0.00 | 0.00 | – | Belt Parkway west – Kennedy Airport, Brooklyn | Continuation west |
25A | Southern State Parkway east – Eastern Long Island | West end of Southern State Parkway | ||||
25B | Elmont Road / Linden Boulevard | |||||
Queens Village | 0.90 | 1.45 | 26A | Belmont Racetrack | Exit open on Belmont Racetrack race days only | |
1.30– 1.70 | 2.09– 2.74 | 26B | NY 24 (Hempstead Avenue) – Belmont Racetrack | Signed as exits 26B (east) and 26C (west) southbound | ||
Nassau | Bellerose Terrace | 1.93 | 3.11 | 26D | Belmont Racetrack / UBS Arena | Access to Elmont Long Island Rail Road station |
2.52 | 4.06 | 27 | NY 25 (Braddock Avenue / Jamaica Avenue / Jericho Turnpike) | Signed as exits 27E (east) and 27W (west) southbound | ||
Queens | Bellerose | 3.23 | 5.20 | 28A | NY 25B (Hillside Avenue) | |
Glen Oaks | 3.76 | 6.05 | 28B | Union Turnpike | ||
4.13 | 6.65 | 29 | Grand Central Parkway – RFK Bridge, Eastern Long Island, Hauppauge | Signed as exits 29E (east) and 29W (west); exit 23 on Grand Central Parkway | ||
Alley Pond Park | 5.05 | 8.13 | 30 | I-495 (Long Island Expressway) – Eastern Long Island, Midtown Tunnel | Signed as exits 30E (east) and 30W (west); no southbound access to I-495 west; exit 31N-S on I-495 | |
5.95 | 9.58 | 31 | NY 25A (Northern Boulevard) | Signed as exits 31E (east) and 31W (west) | ||
Bayside | 8.10– 8.90 | 13.04– 14.32 | 32 (NB) 33 (SB) | I-295 south (Clearview Expressway) / Bell Boulevard | No northbound access to I-295 | |
8.25 | 13.28 | 33 | I-295 north (Throgs Neck Bridge) – Bronx, New England | Northbound exit and southbound entrance; exit 8 on I-295 | ||
Whitestone | 9.06 | 14.58 | 34 | 160th Street / Utopia Parkway | ||
10.30 | 16.58 | 35 | 14th Avenue / Francis Lewis Boulevard | No northbound exit | ||
10.30– 10.57 | 16.58– 17.01 | 36 | I-678 (Whitestone Bridge / Whitestone Expressway) – Bronx, Kennedy Airport, LaGuardia Airport | Signed as exits 36N (north) and 36S (south); exit 16 on I-678 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
- "2007 Traffic Data Report for New York State" (PDF). New York State Department of Transportation. July 25, 2008. Archived from the original (PDF) on June 12, 2012. Retrieved July 17, 2009.
- "Belt Road to Open to Traffic Today; in the $30,000,000 Belt Parkway System Built 'Around the Town'". The New York Times. June 29, 1940. p. 12. ISSN 0362-4331. Retrieved December 21, 2022.
- Microsoft; Nokia (June 24, 2012). "overview map of the Cross Island Parkway" (Map). Bing Maps. Microsoft. Retrieved June 24, 2012.
- "Bayside Marina". Bayside Marina. 2012. Archived from the original on June 24, 2012. Retrieved June 24, 2012.
- "Asks New City Parks to Cost $20,000,000; Metropolitan Conference Urges Prompt Purchases, Chiefly in Queens and Richmond". The New York Times. February 26, 1930. p. 1. ISSN 0362-4331. Retrieved December 21, 2022.
- "Moses Maps Plan for City Parkways; Urges Buying of Land Needed for Four-Borough System of Arterial Links". The New York Times. December 8, 1937. p. 28. ISSN 0362-4331. Retrieved December 21, 2022.
- "Moses Outlines 1938 Parkway Building Plans: Explains Projects Covered in $3,575,000 Pending Appropriation Increases Arterial Roads Get Bulk Southern, Hutchinson, Marine Parkways Included New Parkivay Construction Projected for This Year". New York Herald Tribune. February 19, 1938. p. 13. ISSN 1941-0646. ProQuest 1243101547.
- "27 Parks Proposed For Regional Plan; New Areas Suggested by Group for Improvement Include Jamaica Bay Islands". The New York Times. June 16, 1938. p. 3. ISSN 0362-4331. Retrieved December 21, 2022.
- "Planning Body Okays $28,500,000 Highway". New York Daily News. October 12, 1938. p. 783. ProQuest 2284529622.
- "City Votes $16,000,000 to Build Brooklyn - Queens Belt Parkway; Funds for 33-Mile Artery to Come From Other Items in Capital Budget, With PWA Adding $12,000,000--Work to Start at Once". The New York Times. October 14, 1938. p. 1. ISSN 0362-4331. Retrieved December 21, 2022.
- "City Acts to Cut Capital Outlays on New Warning; Mayor Calls Estimate Board Parley After McGoldrick Pleads for Less Spending". The New York Times. October 12, 1938. ISSN 0362-4331. Retrieved December 21, 2022.
- "'Circumferential' Loses To 'Belt' as Highway Name". The New York Times. December 18, 1938. p. 94. ISSN 0362-4331. Retrieved December 21, 2022.
- "Alas, Circumferential Highway! It's Belt Parkway From Now On". The Brooklyn Daily Eagle. Brooklyn, New York. December 20, 1938. p. 2. Retrieved August 20, 2014 – via Newspapers.com .
- Bennett, Charles G. (December 22, 1940). "A Link for Vital Roads; Plan to Build Short Stretch of Francis Lewis Boulevard Aimed at Bottleneck". The New York Times. ISSN 0362-4331. Retrieved December 21, 2022.
- "Bridge Bids Received; 44 Contracts Let for 66 Spans on Brooklyn-Queens Parkway". The New York Times. August 5, 1939. p. 10. ISSN 0362-4331. Retrieved December 21, 2022.
- "More Bids on Belt Road Offers Received for Grading Seventh Section of Parkway". The New York Times. December 24, 1938. p. 3. ISSN 0362-4331. Retrieved December 21, 2022.
- "Bids Offered for Work On Belt Parkway Link". The New York Times. December 21, 1938. p. 1. ISSN 0362-4331. Retrieved December 21, 2022.
- "13 Enter Bids to Build 3 Belt Parkway Bridges: Lowest Opened by Department of Parks Is $330.651 Three-Level Bridge Designed for Cross Island Parkway". New York Herald Tribune. January 14, 1939. p. 10. ISSN 1941-0646. ProQuest 1331193083.
- "Lehman Signs Bill Authorizing the City To Build Cross-Island Section of Parkway". The New York Times. February 5, 1939. p. 24. ISSN 0362-4331. Retrieved December 21, 2022.
- "City Gets Right To Build Road Link in Nassau: Legislature Passes Bill Designed to Speed Up Circumferential Parkway". New York Herald Tribune. February 2, 1939. p. 2. ISSN 1941-0646. ProQuest 1244702970.
- "Belt Road Bids Opened; Contract Calls for Construction of Cross Island Parkway". The New York Times. February 25, 1939. p. 17. ISSN 0362-4331. Retrieved December 21, 2022.
- "More Parkway Bids In; 13th Contract for Long Island Belt Highway to Be Let". The New York Times. March 11, 1939. p. 23. ISSN 0362-4331. Retrieved December 21, 2022.
- "Bids on 3 Spans Opened; Figures Submitted for Parkway Projects in Queens". The New York Times. March 22, 1939. p. 21. ISSN 0362-4331. Retrieved December 21, 2022.
- "Open Bridge Bids". New York Daily News. March 22, 1939. p. 745. ProQuest 2285138139.
- "Parkway Bids Received; City Acts on Contract for Belt Highway Bridges". The New York Times. March 23, 1939. p. 22. ISSN 0362-4331. Retrieved December 21, 2022.
- "Bids Opened for Parkway". New York Herald Tribune. March 29, 1939. p. 13. ISSN 1941-0646. ProQuest 1247468444.
- "Belt Parkway Bids Let". The New York Times. April 1, 1939. p. 23. ISSN 0362-4331. Retrieved December 21, 2022.
- "New Belt Parkway Bids Opened". The New York Times. June 14, 1939. p. 31. ISSN 0362-4331. Retrieved December 21, 2022.
- "Landscaping Bids Opened; Cover Contracts on Cross Island and Southern Parkways". The New York Times. September 19, 1939. p. 35. ISSN 0362-4331. Retrieved December 21, 2022.
- "$155,136 Cost Set in Parkway Bids". New York Daily News. September 19, 1939. p. 542. ProQuest 2285039420.
- "More Parkway Bids Opened". The New York Times. December 29, 1939. p. 17. ISSN 0362-4331. Retrieved December 21, 2022.
- "Whitestone Span Opened By Mayor; New Bronx-Long Island Link Hailed as Symbol of City's Never-Ending Progress". The New York Times. April 30, 1939. p. 1. ISSN 0362-4331. Retrieved December 21, 2022.
- "Belt Parkway Bids Ready; 4 Fencing Contracts Opened by Park Department". The New York Times. April 18, 1940. p. 23. ISSN 0362-4331. Retrieved December 21, 2022.
- "Belt Parkway Bids Opened". The New York Times. May 23, 1940. p. 24. ISSN 0362-4331. Retrieved December 21, 2022.
- "Park Way Workers See It First Time; 200 Workers, Working on the Belt Project for Several Years, Are Taken on Tour". The New York Times. June 9, 1940. ISSN 0362-4331. Retrieved December 21, 2022.
- "Belt Parkway To Open With Parade Today: Motor Cavalcade lo Leave Owl's Head Park at Noon, Go to Whitestone Bridge An Aerial Glimpse and Map of the Belt Parkway". New York Herald Tribune. June 29, 1940. p. 10. ISSN 1941-0646. ProQuest 1266809068.
- Bennett, Charles G. (June 1, 1941). "New Belt Made a Link For Recreation Centers And Playgrounds". The New York Times. ISSN 0362-4331. Retrieved December 21, 2022.
- "Parkway to Be Widened; 2 Lanes Will Be Added to 11 Miles of Belt System". The New York Times. April 3, 1952. ISSN 0362-4331. Retrieved December 21, 2022.
- "Two Lanes To Be Added To Cross Island Parkway". New York Herald Tribune. April 3, 1952. p. 27. ISSN 1941-0646. ProQuest 1322309735.
- "Overhead Signs to Sort Out Queens Parkway Traffic". The New York Times. March 17, 1953. ISSN 0362-4331. Retrieved December 21, 2022.
- Lii, Jane H. (December 10, 1995). "Neighborhood Report: Douglaston; More L.I.E., Fewer Trees?". The New York Times. ISSN 0362-4331. Retrieved April 12, 2020.
- Harney, James (February 16, 2000). "Major LIE upgrading agreed on". New York Daily News. p. 200. Retrieved April 12, 2020 – via newspapers.com.
- "Press Release Archives - Governor Pataki and Mayor Giuliani Announce Long Island Expressway Plan to Improve Alley Pond Park and Motorist Safety". Welcome to NYC.gov. February 7, 2000. Retrieved January 10, 2019.
- "LIE, Cross Island lanes to close for construction". TimesLedger. June 20, 2002. Retrieved January 10, 2019.
- "NYSDOT-LIE/CIP, Queens Reconstruction Project". New York State Department of Transportation. December 1, 2004. Retrieved January 10, 2019.
- Louis, Kathleen (August 23, 2001). "LIE Construction In Queens Will Last At Least Two More Years". Queens Chronicle. Retrieved January 10, 2019.
- Google (January 5, 2016). "Cross Island Parkway" (Map). Google Maps. Google. Retrieved January 5, 2016.
- "Queens County Inventory Listing" (CSV). New York State Department of Transportation. August 7, 2015. Archived from the original on June 28, 2018. Retrieved September 5, 2017.
External links
- Cross Island Parkway at Alps' Roads
- Cross Island Parkway @ NYCROADS.com
- Cross Island Parkway (Jeff's Parkway Site, Photo Gallery)