Line 4 (Chennai Metro)

The Orange Line or Line 4 is one of the three lines of Chennai Metro, Phase 2 Project . The under construction line stretches from Light House to Poonamallee Bypass . The line will consist of 27 stations, out of which 9 are underground and 18 are elevated.

Line 4 (Orange Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
Stations27
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length26.1 km (16.2 mi)
Number of tracks2
Character10.1 km Underground and 16.0 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)

Phase II

E. Sreedharan, in 2013, stressed on the need of a greater expansion of Chennai metro network by undertaking subsequent phases. In July 2016, the then Chief Minister J. Jayalalithaa announced that Chennai Metro Phase 2 would be 104 km long and have 104 stations.[1] In July 2017, in a suo motu statement in the State Legislative Assembly, an extension in Phase II, involving an extension of Line 4 from Lighthouse up to Poonamallee, with the MadhavaramSholinganallur and Lighthouse–Poonamallee lines intersecting at Alwarthirunagar was announced, making Phase 2 116.1 km long.[2] The key focus for Phase 2 is to connect the northern (Madhavaram, Redhills) and southern parts (Siruseri, Sholinganallur) and the east parts of Chennai (Light house, Mylapore) to the western parts of Chennai (Porur, Poonamallee).

Line Terminal Length
(km)
Number of stations Rolling stock
Line 3 Madhavaram Milk Colony Siruseri Sipcot 2 45.4 kilometres (28.2 mi) 47 56 trains of 3 cars each
Line 4 Poonamallee Depot Lighthouse 26.1 kilometres (16.2 mi) 27 [3] 26 trains of 3 cars each
Line 5 Madhavaram Depot Sholinganallur 44.6 kilometres (27.7 mi) 45 56 trains of 3 cars each
Total 116.1 km (72.1 mi) 119 138 trains of 3 cars each.
The present estimate for the phase 2 stands at Rs. 63,000 crore and approval received from the state government. Foundation stone for phase 2 was laid on 20 November 2020 by Union Home Minister Amit Shah and construction for the phase from Poonamallee to Power House of Line 4 commenced on 1 June 2021.[4][5]  Addressing an event in Chennai, Prime Minister Narendra Modi on Sunday 14 February 2021 said the Centre has set aside Rs 63,000 crore in this year’s Budget for the second phase of Chennai Metro totaling 116.1 km, which is one of the largest projects sanctioned for any city in one-go.[6] The map and list of stations for all 3 lines of Phase 2 has been published by CMRL.

Feasibility study to extend the Phase 2 by 93 km undergoing. DPR for 15.3 km Blue line 1 extension pending approval from the state government. [7] [8] Phase 2 is expected to be completed by 2028.[9] Phase 2 will have 138 trains with three coaches, making a total of 414 coaches.[10]

The stations in phase II will be smaller at 300 m (980 ft) compared with 220 m (720 ft) in phase I. Phase II will have three depots, namely, Madhavaram (30 hectares), SIPCOT (10 ha [25 acres]), and Poonamallee (20 ha [49 acres]).[11]

Stations

Orange Line
S.No Station Name Connections Layout Opened
EnglishTamil
1Lighthouseகலங்கரை விளக்கம்NoneUndergroundUC
2Kutchery Roadகச்சேரி சாலைNoneUndergroundUC
3ThirumayilaiதிருமயிலைMainline rail interchange Thirumayilai railway station,   Purple LineUndergroundUC
4Alwarpetஆழ்வார்பேட்டைNoneUndergroundUC
5Bharathidasan Roadபாரதிதாசன் சாலைNoneUndergroundUC
6Boat Clubபடகு குழாம்NoneUndergroundUC
7Nandanamநந்தனம்  Blue LineUnderground25 May 2018
8Panagal Parkபனகல் பூங்காNoneUndergroundUC
9Kodambakkamகோடம்பாக்கம்Mainline rail interchange Kodambakkam railway stationUndergroundUC
10Kodambakkam Power Houseகோடம்பாக்கம் பவர் ஹவுஸ்NoneElevatedUC
11Vadapalaniவடபழனி  Green LineElevated29 June 2015
12Saligramamசாலிகிராமம்NoneElevatedUC
13Saligramam Ware Houseசாலிகிராமம் கிடங்குNoneElevatedUC
14Alwarthiru Nagarஆழ்வார்திருநகர்  Red LineElevatedUC
15Valasaravakkamவளசரவாக்கம்  Red LineElevatedUC
16Karambakkamகாரம்பாக்கம்  Red LineElevatedUC
17Alapakkamஆலப்பாக்கம்  Red LineElevatedUC
18Porur Junctionபோரூர் சந்திப்புNoneElevatedUC
19Porur Bypassபோரூர் புறவழிச்சாலைNoneElevatedUC
20Thelliyaragaramதெள்ளியார் அகரம்NoneElevatedUC
21Iyyapanthangalஐயப்பன்தாங்கல்Bus interchange Bus DepotElevatedUC
22Kattupakkamகாட்டுப்பாக்கம்NoneElevatedUC
23Kumananchavadiகுமணன்சாவடிNoneElevatedUC
24Karayanchavadiகரையான்சாவடிNoneElevatedUC
25Mullaithottamமுல்லைத்தோட்டம்NoneElevatedUC
26Poonamalleeபூவிருந்தவல்லிBus interchange Bus TerminusElevatedUC
27Poonamallee Bypassபூவிருந்தவல்லி புறவழிச்சாலைNoneElevatedUC
NAThirumazhisaiதிருமழிசைNoneTBAProposed Phase 3
NAKuthambakkamகுத்தம்பாக்கம்Bus interchange Bus TerminusTBAProposed Phase 3
NASriperumbudurதிருபெரும்புதூர்NoneTBAProposed Phase 3
NAParandurபரந்தூர்Airbase Chennai Greenfield AirportTBAProposed Phase 3

Removed and Renamed Stations

Orange Line
S.No Old Station Name Connections Layout New Station Name
EnglishTamil EnglishTamil
1Foreshore Estateபட்டினப்பாக்கம் சாலைNoneN/AN/AN/A
2Natesan Parkநடேசன் பூங்காNoneN/AN/AN/A
3Meenakshi Collegeமீனாட்சி கல்லூரிNoneN/AN/AN/A
4Adyar Gate Junctionஅடையார் கேட் சந்திப்புN/AUndergroundBoat Clubபடகு குழாம்
5Avichi Schoolஅவிசி பள்ளிN/AElevatedSaligramam Ware Houseசாலிகிராமம் கிடங்கு
6Chennai Bypassசென்னை புறவழிச்சாலைN/AElevatedPorur Bypassபோரூர் புறவழிச்சாலை
7Sri Ramachandra Hospitalஶ்ரீ இராமசந்திரா மருத்துவமனைN/AElevatedThelliyaragaramதெள்ளியார் அகரம்

References

  1. Sekar, Sunitha. "104 km, 104 stations: Unveiling Phase II of Metro". The Hindu. Retrieved 24 January 2017.
  2. "Metro's second phase to go up to Poonamallee". The Hindu. Chennai: Kasturi & Sons. 20 July 2017. Retrieved 1 October 2017.
  3. U, Tejonmayam. "Metro to link route planned under monorail network". The Times of India. Retrieved 17 February 2019.
  4. Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Retrieved 24 January 2017.
  5. U, Tejonmayam. "Chennai: Metro rail to trim stations under phase 2". The Times of India. Retrieved 24 January 2017.
  6. Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Retrieved 19 February 2021.
  7. Sekar, Sunitha (26 December 2018). "CMRL mulls extending line to Tirumazhisai". The Hindu. Retrieved 1 January 2019.
  8. "Chennai Metro: Corridor-4 extension plans on cards". The New Indian Express. Retrieved 23 January 2021.
  9. "Metro Rail second phase likely to be completed in six years". The New Indian Express. Retrieved 26 April 2019.
  10. Sekar, Sunitha (11 March 2019). "Chennai Metro phase II to have three-coach and six-coach trains". The Hindu. Chennai: Kasturi & Sons. p. 2. Retrieved 1 May 2019.
  11. Sekar, Sunitha (25 April 2019). "For phase II, Chennai Metro will need less private land". The Hindu. Chennai: Kasturi & Sons. p. 3. Retrieved 2 May 2019.