Île-de-France tramway Line 11 Express

Île-de-France tramway Line T11 Express (known as the Tangentielle Nord and Tram Express Nord during the planning phase) is a suburban tram-train line in France.

Tramway T11 Express
Tramways in Île-de-France Île-de-France tramway Line 11
A Citadis Dualis at Épinay-sur-Seine station.
Overview
LocaleParis, France
Termini
Stations7
Service
TypeTramway
SystemÎle-de-France tramway
Operator(s)Transkeo
Rolling stockAlstom Citadis Dualis
History
Opened1 July 2017 (2017-07-01)
Technical
Line length11 km (6.8 mi)
Tramway T11 Express
Sartrouville
RERRER A TransilienTransilien Line L (Paris-Saint-Lazare)
Sartrouville Val Notre-Dame
Val d'Argenteuil
TransilienTransilien Line J (Paris-Saint-Lazare)
Argenteuil
TransilienTransilien Line J (Paris-Saint-Lazare)
Up arrow planned extension
Épinay-sur-Seine
RERRER C Tramways in Île-de-FranceÎle-de-France tramway Line 8
Épinay-Villetaneuse
TransilienTransilien Line H (Paris-Nord)
Villetaneuse-Université
Tramways in Île-de-FranceÎle-de-France tramway Line 8
Pierrefitte-Stains
RERRER D
Stains-La Cerisaie
Dugny-La Courneuve
Le Bourget
RERRER B
Down arrow planned extension
Drancy-Bobigny
Tramways in Île-de-FranceÎle-de-France tramway Line 1
Bobigny-La Folie
Noisy-le-Sec
RERRER E Tramways in Île-de-FranceÎle-de-France tramway Line 1

Disabled access all stations are accessible

Front view of the tram vehicles set to roll on tram line 11.

Route

The line is planned to be 28 kilometres (17 miles) long, from Sartrouville to Noisy-le-Sec, from the northwestern to the northeastern suburbs of Paris. It will have interchanges with existing SNCF Transilien train lines, trams, metro, and Réseau Express Régional (RER) lines A, B, C, D and E.[1] There will be six new stations and eight interchange stations.

Project

The project, which was granted approval in May 2008,[2] was planned by Syndicat des transports d'Île-de-France (STIF) but also jointly managed by SNCF and Réseau Ferré de France (RFF).[3]

The parisian tramway line 11 will be built in two phases. First phase, from Epinay-sur-Seine to Le Bourget train/RER stations, opened on June 30, 2017,[4] for a total travel time of 15 minutes, an average speed of around 50 km/h (31 mph) and sections allowing maximum speed of 100 km/h (62 mph).The remaining sections of the route (from Sartrouville train/RER station to Epinay-sur-Seine, and from Le Bourget to Noisy-le-Sec train/RER station) will open by 2033.

The total line's overall cost is estimated to be around €1.5 billion.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.