Project 23131 replenishment oiler

Project 23131 is a series of replenishment oilers, developed by the Spetssudoproect JSC and being constructed by the Zaliv shipyard for the Russian Navy since December 2014. It is a heavier version and further development of Project 23130 replenishment oiler Academic Pashin.

Class overview
NameProject 23131
BuildersZaliv shipyard
Operators Russian Navy
Built2014–present
Building2
General characteristics
TypeReplenishment oiler
Tonnage12,000 DWT
Length145 m (476 ft)
Beam24 m (79 ft)
Draught7 m (23 ft)
Propulsion2 × diesels, 2 × fixed pitch propellers, 2 × bow thrusters
Speed16 kn (30 km/h; 18 mph)
Range8,000 nmi (15,000 km; 9,200 mi)
Endurance60 days
Complement24

History

The first two Project 23131 ships, serial numbers "301" and "302", were laid down during a keel laying ceremony at the Zaliv shipyard, Kerch on 26 December 2014.[1] They were originally planned to enter service in 2018.[2] In November 2018, Zaliv shipyard reported that formation of the ships' hulls and superstructures was complete and that work was currently underway to prepare the two hulls for electrical installations.[3] As of 2022, neither ship is complete.

Ships

Name Builder Laid down Launched Commissioned Status
Zaliv Shipyard 26 December 2014[1] Under construction
Zaliv Shipyard 26 December 2014[1] Under construction

See also

References

  1. "В Керчи заложены два танкера для ВМФ России" [Two tankers for the Russian Navy laid down in Kerch]. bmpd.livejournal.com (in Russian). 27 December 2014. Retrieved 31 March 2019.
  2. "На заводе "Залив" отчитались: танкеры для ВМФ строят, но в срок не сдадут".
  3. "Завод "Залив" завершил формирование корпусов двух морских танкеров" [Zaliv plant completed the hulls of two sea tankers]. sudostroenie.info (in Russian). 7 November 2018. Retrieved 31 March 2019.

Project 23131 at RussianShips

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.