STENTOR (satellite)

STENTOR (Satellite de Télécommunications pour Expérimenter les Nouvelles Technologies en Orbite) was a French communications satellite which was lost in a launch failure in 2002. Intended for operation by CNES, France Telecom, and Direction générale de l'armement (DGA). To validate, in flight, advanced technologies which would be integrated in the next generation of telecommunications spacecraft. It will also demonstrate new telecommunications services, including broadband and multimedia transmissions to small user terminals.[1]

STENTOR
NamesSatellite de Télécommunications pour Expérimenter les Nouvelles Technologies en Orbite
Mission typeTechnology demonstration,
Communications
OperatorCNES / France Telecom / DGA
Websitehttps://cnes.fr/fr
Mission duration9 years (planned)
Failed to orbit
Spacecraft properties
SpacecraftSTENTOR
Spacecraft typeSpacebus
BusSpacebus-3000B3
ManufacturerAlcatel Space (bus)
Astrium (avionics)
Launch mass2,210 kg (4,870 lb)
Dry mass1,186 kg (2,615 lb)
Dimensions4.5 x 3.2 x 2.6 m
Span: 15.6 m in orbit
Power2.1 kW
Start of mission
Launch date11 December 2002, 22:22 UTC
RocketAriane 5ECA (V157)
Launch siteCentre Spatial Guyanais, ELA-3
ContractorArianespace
Entered serviceFailed to orbit
Orbital parameters
Reference systemGeocentric orbit (planned)
RegimeGeostationary orbit
Longitude11° West
Transponders
Band7 transponders:
6 Ku-band
1 EHF transponder
Coverage areaEurope, France
 

Satellite description

STENTOR was constructed by Alcatel Space (bus), and Astrium (avionics) was based on the Spacebus-3000B3 satellite bus. It had a mass of 2,210 kg (4,870 lb) and was expected to have an operational lifespan of 9 years. The spacecraft was equipped with 6 Ku-band transponders, plus 1 Extremely high frequency (EHF) transponder.[2] It would have broadcast in Europe and France.

Launch

Arianespace was contracted to launch STENTOR on the maiden flight of the Ariane 5ECA launch vehicle, an upgraded version of the Ariane 5 intended to offer increased payload capacity to Geostationary transfer orbit (GTO). The STENTOR technology demonstration satellite, to have been operated by the French space agency CNES, was aboard the launch vehicle.[3] The launch took place from ELA-3 at Centre Spatial Guyanais, at Kourou, in French Guiana, at 22:22 UTC on 11 December 2002,[4] bound for Geostationary transfer orbit (GTO).

Around three minutes after liftoff, performance issues with the first stage's Vulcain 2 engine — which was making its first flight — began to be noted. By the time of fairing separation, 183 seconds into the flight, the rocket was tumbling out of control. It began to lose altitude and speed, before being destroyed by range safety officer 456 seconds after launch.[5] The failure was attributed to an engine cooling problem which developed around 96 seconds into the mission, causing the engine to destroy itself.[6] Due to the failure the next Ariane 5 launch, which had been scheduled to carry the European Space Agency's (ESA) Rosetta spacecraft in January 2003, was delayed - causing Rosetta to miss its launch window for a mission to comet 46P/Wirtanen. Rosetta was subsequently retargeted to 67P/Churyumov–Gerasimenko and launched successfully in 2004.[6]

References

  1. "Eutelsat Statement of Launch Failure of Hot Bird 7". SpaceRef. 11 December 2002. Retrieved 16 April 2021.
  2. "STENTOR". Gunter's Space Page. 3 August 2018. Retrieved 16 April 2021.
  3. "Launch Kit - HOT BIRD 7 and STENTOR" (PDF). Arianespace. Archived from the original (PDF) on 4 October 2013. Retrieved 16 April 2021.
  4. McDowell, Jonathan (14 March 2021). "Launch Log". Jonathan's Space Page. Retrieved 16 April 2021.
  5. "Mission Status Center". Spaceflight Now. 12 December 2002. Retrieved 4 October 2013.
  6. Harland, David M.; Lorenz, Ralph D. (2005). Space Systems Failures (2006 ed.). Chichester: Springer-Praxis. p. 149. ISBN 0-387-21519-0.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.