Bogra–Sirajganj line
Bogra–Sirajganj line is a proposed 84km-long broad gauge railway. It will be constructed under the Ministry of Railways, Government of Bangladesh. The line will directly connect Bogra District to Sirajganj District.
Bogra–Sirajganj line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | বগুড়া–সিরাজগঞ্জ রেলপথ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Proposed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Ministry of Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Bangladesh | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 10 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Railway line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Bangladesh Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 84 km | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Dual gauge 1,676 mm (5 ft 6 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 130 km/h | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
History
If anyone want to go to Dhaka by train from Bogra, they have to go through Natore and Pabna District, which takes a lot of time. In 2005, the government took up a plan to build a railway line between Jamtoil, Sirajganj District[1] and Bogra to save time and money for passengers. After the World Bank agreed to finance the railway line project, a survey on land acquisition was carried out, but the project was stopped due to political and business opposition. In 2011, the construction of Bogra–Sirajganj line was promised by Sheikh Hasina, but for unknown reasons, the construction was not started within four years. In the next year, she promised to build the railway for a second time as a result of public backlash against the lack of progress in the construction, but the project stalled as the government could not secure its financing. Then in 2017, the project officially started as the Government of India announced to provide a loan to finance the project.[2] On 27 September 2021, the government of Bangladesh appointed a joint venture led by RITES Limited as the consultant for the project.[3] Executive Committee of the National Economic Council approved the project on 30 October 2018. SMEC International submitted their pre-survey in 2010 after getting pre-survey responsibility for the railway project. In that pre-survey they proposed two routes. But within twelve years the routes were abandoned even as settlements developed on them. In 2022, the new consulting firm proposed four routes. Md. Nurul Islam Sujon, the railway minister, chose the third route out of the four which, if implemented, would end the railway at a distance of 3 km from the city rather than directly connecting Sirajganj to Bogra.[1] In 14 November of the same year, a project related meeting in Bogra revealed that an allocation of ৳190 crore has been made in the financial year 2022-2023 for 944 acres land acquisition for the proposed railway line next year.[4] 3 junctions and 7 stations are proposed on the planned route. This includes the conversion of existing Bogra and Kahalu railway stations into railway junctions, with the construction of a third junction at Ranirhat. From Ranirhat, the railway will pass through Ariyabazar, Sherpur, Chandaikona, Raiganj, Krishandia and Sadanandpur railway stations and end at Shaheed Mansur Ali station.[5] In 2023, it is known that the government has paid a total of ৳1,921 crores for ongoing land acquisition. The project is scheduled to be completed by 2026.[6]
References
- Islam, Tawhidul (6 April 2022). "বিফলে ১২ বছর আগের সমীক্ষা". Amader Shomoy (in Bengali). Retrieved 31 May 2023.
- Nasim, Md Nazmul Huda (23 November 2019). "বগুড়া-সিরাজগঞ্জ রেলপথ নির্মাণে অগ্রগতি নেই". Jugantor (in Bengali). Retrieved 31 May 2023.
- "বাংলাদেশ সিরাজগঞ্জ-বগুড়া রেলপথ নির্মাণে পরামর্শক নিয়োগ". The Daily Star (in Bengali). 27 September 2021. Retrieved 31 May 2023.
- "বগুড়া-সিরাজগঞ্জ রেলপথ প্রকল্পে আশার আলো". Jugantor (in Bengali). 17 November 2022. Retrieved 31 May 2023.
- Alim, H (11 December 2022). "বগুড়া-সিরাজগঞ্জ রেলপথে থাকছে ৩ জংশন, ৭ স্টেশন". Bonikbarta.net (in Bengali). Retrieved 31 May 2023.
- "বগুড়া-সিরাজগঞ্জ নতুন রেললাইন স্থাপনের কাজ শুরু হচ্ছে". Bangladesh Sangbad Sangstha (in Bengali). 18 March 2023. Retrieved 31 May 2023.