STH BNK by Beulah

STH BNK by Beulah is a dual skyscraper development proposed for Melbourne developed by Beulah and designed by architectural firms UNStudio and Cox Architecture.[3] The site currently hosts a BMW dealership.[4]

STH BNK by Beulah
STH BNK by Beulah towers, as proposed in 2018
General information
StatusApproved
Location60 Southbank Boulevard, Southbank VIC 3006
Construction started2023
Completed~2028
Cost~AUD$2 billion
Height
Architectural
  • Tower 1: 366 m (1,200.8 ft)[1]
  • Tower 2: 251 m (823.5 ft)[2]
Technical details
Floor count
  • Tower 1: 102
  • Tower 2: 59
Design and construction
Architect(s)UNStudio · Cox Architecture
DeveloperBeulah
Website
sthbnk.com

History

Site

The site for the development is 60 Southbank Boulevard, located in Southbank, an inner-city suburb of Melbourne, and is an amalgamation of two adjacent properties – 102-156 City Road and 158 City Road.[5][6] The former property, with a land area of 6,191 m2 (66,639 sq ft), hosts a purpose-built multi-level car showroom which was luxury vehicle manufacturer BMW’s flagship sales store in Melbourne.[5] In December 2017, Beulah International purchased the site from BMW for approximately $AUD101 million.[7] In April 2021, Beulah acquired 158 City Road, with the intention of expanding the development.[6][8] The 1,515 m2 (16,307 sq ft) site is currently home to Hanover House, a seven storey commercial building, the tallest in Southbank between 1973 and 1990.[6] The purchase brought the total land area of the development to 7,706 m2 (82,947 sq ft), and the property is now an 'island' with four frontages: Power Street, City Road, Southbank Boulevard, and Waterfall Lane.[6][9] The development will be situated in an area of Melbourne that has some of the tallest buildings in the city; for instance, the city's current tallest building, Australia 108, sits opposite the property at 70 Southbank Boulevard, whilst the previous tallest, Eureka Tower, is also in the vicinity.[5][9]

Southbank competition

Beulah conducted a contest to determine the architect for the project, and dubbed the competition "STH BNK by Beulah". All six solicited bids involved two architectural firms, and partnerships included BIG Architects and Fender Katsalidis, MAD Studio and Elenberg Fraser, and Woods Bagot and MVRDV.[10] The collaborative bid by UNStudio and Cox Architecture ultimately secured the commission. The winning design was announced in August 2018.[11]

Project

The structure is part of the larger development on Melbourne's Southbank, estimated to cost AUD$2 billion. The development is planned to begin breaking ground in 2020. Green Spine is composed of two skyscrapers; Tower 1 will comprise 102 storeys and reach a height of 366 metres, surpassing the height of the current tallest building in Australia, Q1, which stands at 322 metres.[1] The second tower will comprise 59 storeys and reach a height of 251 metres; as with Tower 1, the second building will include hotel rooms, residential apartments, and offices.[2][12] Both skyscrapers will seem to curve in a twist and will have foliage and trees growing on balconies along their exteriors.[11]

Approval

In March 2020, the plan received approval by the City of Melbourne.[13] Planning Minister Richard Wynne approved the project on 23 April 2020; like other developments, STH BNK by Beulah was identified by the Victorian Government as a project needing to be "fast-tracked", amid the impact of the COVID-19 pandemic to the Victorian economy.[14][15]

See also

References

  1. Southbank by Beulah Tower 1 – The Skyscraper Center. Council on Tall Buildings and Urban Habitat. Retrieved 15 September 2020.
  2. Southbank by Beulah Tower 2 – The Skyscraper Center. Council on Tall Buildings and Urban Habitat. Retrieved 24 April 2020.
  3. Block, India (15 August 2018). "UNStudio to design Australia's tallest building". DeZeen. Retrieved 11 September 2018.
  4. Farquhar, Peter (15 August 2018). "The stunning 'Green Spine' will be Melbourne's newest skyscraper -- and the Southern Hemisphere's tallest". Business Insider. Retrieved 11 September 2018.
  5. Birmingham, Jane (3 March 2020). "Ministerial Planning Referral: TPMR-2019-24 - 102-156 City Road, Southbank" (PDF). Future Melbourne (Planning) Committee. Retrieved 12 January 2023.
  6. Pallisco, Marc (12 April 2021). "Beulah buys Southbank's first 'high-rise' for sky-rise". Realestate Source. Retrieved 12 January 2023.
  7. Lenaghan, Nick (20 December 2017). "Developer Beulah parks up at BMW in Melbourne's Southbank". Australian Financial Review. Retrieved 12 January 2023.
  8. "Beulah Acquires Iconic Site with Plans to Extend Melbourne Southbank Project". UNStudio. 16 April 2021. Retrieved 12 January 2023.
  9. McKeon, Renee (13 April 2021). "Beulah Adds Hanover House to Melbourne's Tallest Tower Site". The Urban Developer. Retrieved 12 January 2023.
  10. Block, India (27 July 2018). "BIG, MAD, MVRDV and OMA on shortlist to design Australia's tallest building". DeZeen. Retrieved 11 September 2018.
  11. Holland, Oscar (15 August 2018). "Twisting 'garden' skyscraper to become Australia's tallest building". CNN Style. Retrieved 27 December 2018.
  12. Lenaghan, Nick. (6 August 2019). "Beulah aims high for BMW site in Southbank". Australian Financial Review. Retrieved 10 August 2019.
  13. "UN Studio, Cox Architecture's Southbank towers inch closer to approval". ArchitectureAU. 4 March 2020. Retrieved 24 April 2020.
  14. Neilsen, Inga (24 April 2020). "Australia's tallest building fast-tracked at Melbourne's Southbank". 9 News. Retrieved 24 April 2020.
  15. "Green Spine, Australia's tallest building, approved for site in Melbourne's Southbank". ABC News. 24 April 2020. Retrieved 24 April 2020.

37.822597°S 144.963361°E / -37.822597; 144.963361

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.