Syncrude Tailings Dam

The Syncrude Tailings Dam, impounding the Mildred Lake Settling Basin (MLSB), is an embankment dam that is, by volume of construction material, the largest earth structure in the world in 2001.[1] It is located 40 km (25 mi) north of Fort McMurray, Alberta, Canada, at the northern end of the Mildred Lake lease area owned by Syncrude Canada Ltd. The dam and the tailings artificial lake within it are constructed and maintained as part of ongoing operations by Syncrude in extracting oil from the Athabasca oil sands. Other tailings dams constructed and operated in the same area by Syncrude include the Southwest Sand Storage (SWSS),[2] which is the third largest dam in the world by volume of construction material after the Tarbela Dam.

Syncrude Tailings Dam
Syncrude Tailings Dam – Mildred Lake Settling Basin, enclosing tailings pond
Official nameSyncrude Tailings Dam
LocationFort McMurray, Alberta, Canada
Coordinates57.057°N 111.600°W / 57.057; -111.600
Construction began1978
Operator(s)Syncrude Canada Ltd.
Dam and spillways
Height133 to 288 ft (41 to 88 m) (2001)[1]
Length11.3 miles (18.2 km) (2001)[1]

Oil sands tailings pond water

According to Canada’s Oil Sands Innovation Alliance (COSIA), an alliance of oil sands producers formed in 2012, who share research on Environmental Priority Areas (EPAs) such as tailing pond water and greenhouse gases, "Tailings are the sand, silt, clay, soil and water found naturally in oil sands that remain following the mining and bitumen extraction process."[3] The Clark Hot Water Extraction (CHWE) process used by Suncor and Syncrude in their open-pit mining operations, to extract bitumen from the Athabasca Oil Sands (AOS) produces large quantities of tailings pond sludge which remains stable for decades. By 1990 it was considered to be the "imminent environmental constraint to future use of the hot water process."[4] Oil sands tailings pond water contains toxic chemicals such as "naphthenic acids (NAs) and process chemicals (e.g., alkyl sulphates, quaternary ammonium compounds, and alkylphenol ethoxylates)."[5]

Other Syncrude tailings dams

By 2012 Syncrude Canada Ltd had oilsands mining operations on three lease areas (Mildred Lake, Aurora North and Aurora South), all about 40 km north of Fort McMurray.[6] There are many tailings dams on those leases. The lease that has the greatest number of tailings dams, and the largest tailings dams, is the Mildred Lake lease. According to Syncrude's 2010 Baseline Report submitted to the Energy Resources Conservation Board (since replaced by the Alberta Energy Regulator (AER), the Mildred Lake and Aurora North leases together contain: the Mildred Lake Settling Basin (MLSB), Southwest Sand Storage (SWSS), West In-Pit (WIP), East In-Pit (EIP), Southwest In-Pit (SWIP), Aurora Settling Basin (ASB) and Aurora East Pit Northeast (AEPN-E). Those referred to as "in pit" have only small containing embankments.[7] In Aurora South lease the main tailings dam will be the External Tailings Area (ETA).[8]

By 2016, Syncrude four tailings areas at Aurora North consisted of the out-of-pit Aurora Settling Basin (ASB), in operation since 2000, and three in-pit basins: Aurora East Pit North East (AEPN-E) since 2010, Aurora East Pit North West (AEPN-W) since 2011 (in-pit), and Aurora East Pit South (AEPS) since 2014.[9]

Syncrude's oil sands mine works, Mildred Lake site, with MLSB to the left of the bright yellow sulfur stockpiles
Fluid deposit summary, 30 June 2010[7]
SiteFacilityFluid fine tails (106 m3)Water (106 m3)Total fluid (106 m3)
Mildred LakeMLSB196.513.4209.9
Mildred LakeSWSS46.310.156.4
Mildred LakeWIP168.622.9191.5
Mildred LakeEIP0.12.52.6
Mildred LakeSWIP Jr.1.20.31.5
Mildred LakeSWIP Major13.228.641.8
Aurora NorthASB76.748.3125.0
Aurora NorthAEPN-E0.210.811.01

Mildred Lake Settling Basin (MLSB)

The Mildred Lake Settling Basin is located on the north side of the Mildred Lake lease area. It is a tailings pond that serves three purposes. Firstly, the embankment was planned[10] as storage for a substantial volume of sand. Secondly, the basin acts as a storage basin for process water, which is recycled, with a planned ultimate storage capacity[10] of 350×106 m3. Thirdly, the fines that are not captured elsewhere settle and compact in the basin, and are later pumped out for long term storage. This means that the MLSB is a true dam in the sense that it is filled with water in the long term, rather than being quickly filled by solids as in many other tailings dams. The embankment has a circumference of about 18 km, an average height of about 40 m and a maximum height of about 88 m.[10]

Two starter dams were constructed during 1976 to 1978[10] and were required until sufficient sand was available for building the embankments. The north starter dam had a crest elevation of 312 m. The original ground surface varied from 294 m to 305 m while up to 1.5 m of original ground was stripped for a trench above which was a compacted clay core. The crest width was 30 metres.

The main embankment was taken to a final elevation of 352 m for more than half of its length by 1994 and completed in 1995.[7] For construction purposes the embankment was considered to be in a collection of 30 "cells", each with a crest length of about 600 metres. Acceptable side slopes were determined on a cell-by-cell basis, based on the strength of available materials and foundation movement.[10] The slope of the outer part of the embankment is much smaller than that of the inner part, in a ratio of about 4:1. By 1997 Syncrude's large open-pit operations were producing up to 250,000 tons a day of tailings that were collected in this tailings pond built on the upstream construction method.[11]

As this dam frequently appears in lists as the largest dam structure in the world, it is necessary to estimate the accuracy of the quoted volume of construction material. The quoted length of the embankment of 18 km is reliable. The average height of the embankment is quoted to be 40 m,[10] and a check on this using four cross sections[7] yields 45 m, which is of the same order of magnitude. The average base width of the embankment is variously 1,800 m,[10] 800 m from Google Earth and 660 m.[7] So whereas one report[10] gives an embankment volume of 720×106 m3, calculations based on the width of the embankment base from these three sources give embankment volumes of 660, 290 and 240×106 m3 respectively. So there's some uncertainty as to the total volume of construction material.

South West Sand Storage (SWSS)

The SWSS facility[2] is located in the southwest corner of the Mildred Lake lease area. It was commissioned in 1993. The facility was designed to provide coarse tailings sand storage, returning water and thin fine tailings to other sites within the Mildred Lake Project area. The crest elevation is 400 m[2] or 390 m.[7] An upgrade to increase the water storage to a maximum water surface level of 397 m was constructed in 2009 to 2010.

The embankment length is 19.5 km. The maximum embankment height is at least 30 m and the average embankment height is about 18.5 m.[7] The average embankment base width is about 800 m from Google Earth. So the total embankment volume is about 145×106 m3.

Aurora Settling Basin (ASB)

This is located to the South East of the Aurora North lease, adjacent to the Muskeg River.[12]

The embankment length is 11.6 km and the average embankment base width is about 260 m from Google Earth. The surface elevation is 341.4 m.[12]

See also

References

  1. Safe dam constructions – Seminar on safe tailings dam constructions (PDF), Gallivare: Swedish Mining Association, Natur Vards Verket, European Commission, 19–20 September 2001, retrieved 25 February 2014
  2. South West Sand Storage Conversion (PDF), Public Disclosure Document, Syncrude Canada Ltd, July 2008, archived from the original (PDF) on 2014-02-26
  3. "Tailings". Canada's Oil Sands Innovation Alliance (COSIA).
  4. Majid, A.; Boyko, V.J.; Sparks, B.D.; Ripmeester, J.A.; Kodama, H (1 January 1990), Characteriratlon of Syncrude Sludge Pond Talllngs (PDF), Ottawa, Ontario: National Research Council of Canada, archived from the original (PDF) on 6 March 2013, retrieved 24 February 2014
  5. Wang, Xiaomeng; Robinson, Lisa; Wen, Qing; Kasperski, Kim L (22 May 2013). "Determination of thermodynamic and transport parameters of naphthenic acids and organic process chemicals in oil sand tailings pond water". Environmental Science: Processes & Impacts. 15 (7): 1411–1423. doi:10.1039/C3EM00089C. PMID 23736740.
  6. "Syncrude Lease Map". Syncrude. 2012.
  7. "Directive 074: Baseline Survey for Fluid Deposits Syncrude Mildred Lake and Aurora North" (PDF). Alberta Energy Regulator (AER). 30 September 2010. Retrieved 25 February 2014.
  8. 2010 Annual Tailings Plan Submission Syncrude Aurora South (PDF) (Report). Alberta Energy Regulator (AER). 30 September 2010. Retrieved 25 February 2014.
  9. "Tailings Management Plan Application Syncrude Aurora North Mine". Syncrude. October 2016. {{cite web}}: Missing or empty |url= (help)
  10. D. Nicol (1994) "The Syncrude Mildred Lake Tailings Dyke Redesign", 18th Int Cong. Large Dams, Vol. 1, pp. 145-184
  11. Klohn, Earle J. (1997), Tailings Dams in Canada (PDF), Geotechnical News, pp. 117–123, retrieved 22 February 2014
  12. "Facts About Canadian Oil - Import&Export, Reserves, Prices" (PDF). 30 January 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.