T. F. Green Airport station
T. F. Green Airport station (signed as T. F. Green Airport/Warwick) is a train station and intermodal facility in Warwick, Rhode Island, on the Northeast Corridor, adjacent to T. F. Green Airport. It extends the MBTA Commuter Rail Providence/Stoughton Line from Boston, which previously only went as far as the Providence train station. The station was completed in October 2010 and MBTA service began on December 6, 2010.[1] On November 14, 2011, service expanded to 10 weekday trains in each direction.[3] Trips to and from Boston's South Station take 75 to 90 minutes.
T. F. Green Airport/Warwick | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||
Location | 700 Jefferson Boulevard Warwick, Rhode Island | ||||||||||||||||||||||
Coordinates | 41°43′39″N 71°26′30″W | ||||||||||||||||||||||
Owned by | State of Rhode Island | ||||||||||||||||||||||
Line(s) | Amtrak Northeast Corridor | ||||||||||||||||||||||
Platforms | 1 side platform | ||||||||||||||||||||||
Tracks | 3 | ||||||||||||||||||||||
Connections | RIPTA: | ||||||||||||||||||||||
Construction | |||||||||||||||||||||||
Parking | 650 spaces ($6.75 daily fee) | ||||||||||||||||||||||
Bicycle facilities | racks available | ||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||
Other information | |||||||||||||||||||||||
Fare zone | 9 | ||||||||||||||||||||||
History | |||||||||||||||||||||||
Opened | December 6, 2010[1] | ||||||||||||||||||||||
Passengers | |||||||||||||||||||||||
2018 | 227 (weekday average boardings)[2] | ||||||||||||||||||||||
Services | |||||||||||||||||||||||
| |||||||||||||||||||||||
|
The station's primary purpose is to serve local commuters to Providence and Boston, but it will also bring passengers and employees to and from the airport. The station also makes it possible to move between T.F. Green and Logan International Airport in about two hours via subway and commuter rail. Amtrak trains cannot and do not serve the station because the track that serves the single platform is not electrified. Funding was not provided for the necessary track and electrical work, although long-range plans call for this infrastructure to be provided.[4]
History
A state study of rail corridors was completed in 1994 and the Northeast Corridor was designated as the highest-priority line for commuter service to Providence.[5] An addendum in 1995 projected daily ridership from a Warwick station to be 454 in 2000 and 529 in 2020.[6] An operations plan was released in 2001, and environmental assessment was completed in 2003.[7]
The station's ceremonial groundbreaking took place on July 17, 2006, but construction was delayed by negotiations with Amtrak over the agreement to allow the MBTA to run commuter trains on Amtrak-owned tracks.[4] Site preparation began in September 2007 and construction began in late 2008 or early 2009.[8][9] The station was originally scheduled to open in late 2010, and construction was completed on schedule, with the opening ceremony taking place on October 27, 2010.[4]
On October 13, 2010, the MBTA and the Rhode Island Department of Transportation signed an agreement enabling MBTA operations to the station to begin on December 6, 2010, initially with 6 inbound and 5 outbound trains each weekday. This service consisted of three peak-hour trains in each direction between T.F. Green and South Station, plus several off-peak shuttles to/from Providence.[10] This was despite earlier concerns that service could be delayed pending completion of the Wickford Junction station and the siding there used to allow trains to reverse directions. However, the siding at T.F. Green was deemed sufficient for operations. In November 2011, service was increased significantly, with mid-day service and more rush hour trains.[3] The line was extended 10 miles past T.F. Green with the opening of Wickford Junction station in April 2012.[1]
Normal service to T.F. Green Airport is weekday-only, with no regular weekend trains. Beginning on September 16, 2012, special Sunday trains serving New England Patriots games were extended from Providence to T.F. Green Airport. These trains run on game days only to Foxboro, which was not served by regular daily MBTA service.[11] Game-day service was cut back to Providence in the 2019 season.[12]
Ridership
Daily boardings were projected to reach 529 in 2020 by the 1995 analysis; this was halved to 245 in the 2003 Environmental Assessment.[6][7]
In the first quarter of 2012, inbound ridership from the station averaged 149 riders per day, lower than state officials hoped.[13] By July 2012, the count increased to more than 200 daily, even as passenger traffic at the airport decreased.[14]
By early 2017, total ridership (boardings plus alightings) was 414. For the second half of 2017, the state offered free intrastate rides, primarily in an attempt to promote the under-utilized Wickford Junction station. The six-month promotion was expected to cost about $102,000.[15] However, a 2018 count had just 227 daily boardings - barely increased from 2012.[2]
Funding, facilities and cost
The station includes a four-level, 3,500-space garage with facilities for airport car rental companies and park and ride commuters. The station is connected to the airport via an elevated 1,250-foot (380-meter) skywalk with moving sidewalks, known as the Interlink.[16] Costs included:[17]
- $28.1M — commuter parking garage
- $46.9M — rental car garage
- $40.2M — rental car desk and service areas
- $22.9M — commuter rail platform
- $43.5M — skywalk
- $14.1M — connection from airport terminal to skywalk
The total cost of the T.F. Green amenities, plus an additional station at Wickford Junction was $336 million.[18] The project sponsor was the Rhode Island Department of Transportation,[19] which assembled funding consisting of:[17]
- $29M already collected from a $4.25 car rental fee
- $22.2M grant from Rhode Island
- $88.9M grant from federal highway funds
- $42M loan from the federal government under the Transportation Finance and Infrastructure Act
- $39.6M bond from Rhode Island Economic Development Corporation (of which the Airport Corporation is a subsidiary)[20]
$20M of federal funding was earmarked by former Rhode Island senator Lincoln Chafee in the 2005 SAFETEA transportation bill.[21]
As part of the 1989 Pilgrim Partnership Agreement, Rhode Island provides capital funding (including some of its federal formula funds) for MBTA expansion in the state. (Rhode Island also gave the MBTA $11 million to cover capital costs for the T.F. Green project.) Massachusetts (through the MBTA) provides the operating subsidy for MBTA Commuter Rail service in return.[22] Rhode Island also pays Amtrak to allow the MBTA to use its tracks.[18]
The Rhode Island Airport Corporation, which runs T.F. Green Airport, will be responsible for repaying the bonds using revenues from car rental and commuter parking facilities.[17]
Amtrak
Although Amtrak owns the tracks through the station, T.F. Green Airport is not a stop on Amtrak's Northeast Regional or Acela Express trains.[19] The station is on a third track built west of the existing two-track Northeast Corridor line, however the new track was not electrified due to lack of funding. All Amtrak trains currently operating on the Northeast Corridor require overhead electric power. Amtrak had requested a separate track for its trains, which was not built, and has also cited a lack of sufficient ridership for the stop to be economically sustainable. This may change with time.[4] Long-term Amtrak plans released in 2010 called for a fourth track (as a second passing siding) with a second platform at the station for intrastate commuter service as well as possible future Amtrak use. The new siding and the current siding would need to have catenary wire extended over them in order for Amtrak trains to stop.[23]
A 2017 Amtrak/RIDOT study analyzed several potential scenarios for intercity service to the station: addition of Amtrak service with a new platform, extension of Shore Line East service to Providence, additional Westerly–Boston local service, and new intercity line between Boston and T.F. Green, Westerly, or New London.[24] In June 2019, a $2.8 million federal grant was awarded to fund preliminary engineering and environmental review work to allow Northeast Regional trains to stop at the station.[25]
References
- Belcher, Jonathan (March 25, 2017). "Changes to Transit Service in the MBTA district 1964-2016" (PDF). NETransit.
- Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
- "Increased Service to T.F. Green International Airport". Massachusetts Bay Transportation Authority. 1 November 2011. Retrieved 4 September 2012.
- Needham, Cynthia (22 August 2007). "Airport train station revived". Providence Journal. Archived from the original on 24 August 2007. Retrieved 22 March 2008.
- "Rail Corridor Feasibility Study" (PDF). Rhode Island Department of Transportation. November 1994. Archived from the original (PDF) on 24 April 2013. Retrieved 4 July 2017.
- Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Archived from the original (PDF) on 16 April 2009. Retrieved 4 July 2017.
- "South County Commuter Rail Environmental Assessment" (PDF). Rhode Island Department of Transportation. February 2003. Archived from the original (PDF) on 24 March 2012. Retrieved 14 April 2012.
- Downing, Neil (17 October 2007). "Train station construction to begin". Providence Journal. Retrieved 21 March 2008.
- Lord, Peter B. (2 August 2009). "Finally, work on a commuter rail station at T.F. Green advances and so does its cost". Providence Journal. Retrieved 18 April 2011.
- "Providence/Stoughton Line Schedule" (PDF). Massachusetts Bay Transportation Authority. 22 November 2010. Archived from the original (PDF) on 4 December 2010. Retrieved 4 September 2012.
- "Riding the T: Patriots". Massachusetts Bay Transportation Authority. Archived from the original on September 19, 2012.
- "Gillette Stadium". Massachusetts Bay Transportation Authority. Archived from the original on August 22, 2019.
- Klepper, David (6 April 2012). "RI rail passenger count up; still lower than hoped". Boston Globe. Retrieved 7 April 2012.
- Parker, Paul Edward (24 August 2012). "Reinvent RI: Passenger traffic down at T.F. Green Airport, up at train station". Providence Journal. Retrieved 4 September 2012.
- "You can ride Rhode Island's commuter rail for free starting Monday". Boston Globe. July 2, 2017.
- Intermodal Planning - Park & Ride Facilities Archived 2011-06-11 at the Wayback Machine. Rhode Island Department of Transportation. Accessed 18 April 2011.
- Howell, John. "Warwick station hinges on Amtrak deal". Warwick Online, 31 January 2008.
- Bierman, Noah (September 10, 2009). "Vote set on T link to R.I. airport". The Boston Globe.
- Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Archived from the original (PDF) on 16 April 2009. Retrieved 4 September 2012.
- "RI Airport Corporation". Rhode Island Airport Corporation. Retrieved 4 September 2012.
- Miller, Hannah (11 October 2005). "Warwick station will provide direct train access to T.F. Green airport". Brown Daily Herald. Retrieved 4 September 2012.
- South County Commuter Rail Archived 2011-09-27 at the Wayback Machine (Microsoft Word document). November 2007. Accessed 25 Feb 2011.
- The NEC Master Plan Working Group (May 2010). "Part II: Current and Future Service and Infrastructure by Sgement" (PDF). The Northeast Corridor Infrastructure Master Plan. Amtrak. p. 6. Retrieved 26 January 2016.
- "Feasibility Study for Intercity Rail Service to T.F. Green Airport" (PDF). Amtrak and the Rhode Island Department of Transportation. April 2017.
- "New $2.8 Million Grant Keeps Development of Amtrak Service to T.F. Green On Track" (Press release). Office of Jack Reed. June 10, 2019.
Further reading
- Amtrak; RIdot (April 2017). Feasibility Study for Intercity Rail Service to T.F. Green Airport (PDF) (Report).
External links
Media related to T. F. Green Airport station at Wikimedia Commons