Rijeka Thermal Power Station

The Rijeka Thermal Power Station (Croatian: Termoelektrana Rijeka, TE Rijeka, also known as TE Urinj[1]) is an oil-fired power station east of Rijeka at Kostrena, Croatia. It was built between 1974 and 1978 and it has one generation unit with capacity of 320 MW.[2][3][4][5] The height of the boiler house including its rooftop flue gas stack is 250 metres (820 ft).[2]

TE Rijeka
Official nameTermoelektrana Rijeka
CountryCroatia
LocationKostrena
Coordinates45°17′10″N 14°31′14″E
StatusMothballed
Construction began1974
Commission date1978
Owner(s)Hrvatska elektroprivreda
Thermal power station
Primary fuelFuel oil
Power generation
Units operational1 × 320 MW
Make and modelAnsaldo Energia
Nameplate capacity320 MW
External links
CommonsRelated media on Commons

Turbine for the power station was supplied by Ansaldo Energia. Ansaldo Energia was also awarded engineering, procurement and construction contract. Boilers were supplied by Waagner-Biro.[2][4]

The power station is owned and operated by Hrvatska elektroprivreda.[2][4] Its annual production varies, averaging 917 GWh, but only 141 GWh in 2011.[6] It is expected to undergo decommissioning in 2020, but it is doubtful that it will remain operational until then because of its pollution problem.[1] As of 2015, Rijeka Thermal Power Station is offline, ready to resume generation within 160 hours of notice.[7] On 18 October 2022, it was unofficially reported that HEP plans to restart the operation of the power plant in order to cover the losses incurred during the energy crisis.[8]

References

  1. Reščec, Fedor (February 2011). "Oil products demand to decline in Croatia". Nafta Scientific Journal. Croatian Academy of Sciences and Arts - Scientific Council for Petroleum. 62 (1–2): 54. ISSN 0027-755X.
  2. Izvješće o sigurnosti za Pogon TE Rijeka [Safety Report for the TE Rijeka] (PDF) (Report) (in Croatian). Ministry of Environmental and Nature Protection. 1998-04-27. Archived from the original (PDF) on 2013-12-31. Retrieved 2014-01-12.
  3. "Kraj zagađenju i uvozu: Termoelektrana Rijeka u roku četiri godine prelazi na plin" [End to pollution and import: within four years TE Rijeka transfers to gas]. Novi list (in Croatian). 2013-01-24. Retrieved 2014-01-12.
  4. "Gas- and Oil-Fired Plants in Croatia". industcards.com. Archived from the original on 2009-07-18. Retrieved 2013-08-25.
  5. "Hidraulička analiza rashladnog sustava TE Rijeka" [Hydraulic analysis of the cooling system of TE Rijeka]. Department of Fluid Mechanics and Computational Engineering (in Croatian). Retrieved 2014-01-12.
  6. "TE Rijeka (Rijeka Thermal Power Plant)". Official website HEP Proizvodnja. Hrvatska elektroprivreda. Retrieved 2013-08-25.
  7. "Novi list".
  8. "Dnevnik Nove TV neslužbeno doznaje: HEP planira ponovno aktivirati termoelektranu kod Rijeke" [Dnevnik Nova TV unofficially finds out: HEP plans to reactivate the thermal power plant near Rijeka]. Dnevnik.hr (in Croatian). 18 October 2022. Retrieved 19 October 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.