Mulhouse tramway

The Mulhouse tramway (French: Tramway de Mulhouse; Alsatian: D'Strossabàhn Milhüsa) is a tram network in the French city of Mulhouse in Alsace, France. It commenced service in 2006, and now comprises three purely tram lines, plus one hybrid tram-train line.[2]

Mulhouse tramway
Overview
Native nameTramway de Mulhouse
LocaleMulhouse, Grand Est, France
Transit typeTram and Tram-train
Number of lines4
Annual ridership15.00 million (2018)[1]
Operation
Began operation12 June 2006[1]
Operator(s)Soléa and SNCF
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC & 25 kV 50 Hz AC from overhead catenary
System map
Map of Mulhouse tramway
Mulhouse Alstom Citadis 302 tram
Map of the network

Tram services

The three pure tram lines intersect at Porte Jeune stop in central Mulhouse, and comprise:[2]

Lines 1 and 2 were put into service in 2006, whilst line 3 is a short working of the tram-train line and opened in December 2010 with that line. Extensions are planned for line 1, from Châtaignier to Bosquets du Roy, and for line 2, from Nouveau Bassin to Jonquilles.[2]

The network is electrified at 750 V DC using overhead power collection. Services are provided by a fleet of twenty-two 32 m (105 ft) long Alstom Citadis 302 trams. Both the network and the trams are operated by Soléa, who also operate the city's bus network, on behalf of the Mulhouse Alsace Agglomération (MAA).[2][3]

Tram-train services

The tram-train line runs from Gare Central to Thann, with a proposed extension to Kruth. The line follows the existing tracks of lines 1 from Gare Central to Porte Jeune, and line 2 from there to Daguerre. Here it diverges onto a 4.2 kilometres (2.6 mi) section of new tram track built parallel to the Paris–Mulhouse main line railway as far as Lutterbach. This line, which is a mixture of single and double track, and electrified at 750 V DC, is used by both the tram-train service and the purely tram line 3.[2]

At Lutterbach, a connection is made to the existing railway line to Thann and Kruth. This line is electrified at 25 kV 50 Hz AC between Lutterbach and Thann St Jacques (the former Thann Nord), and is single track with passing loops. It carries both the tram-train service and an SNCF diesel railcar service to Kruth, which uses the main railway line between Lutterbach and Gare Central. Freight trains also run at night.[2]

A second phase of the line will involve extending the electrification as far as Kruth, allowing tram-trains to run through to there, and also allowing the SNCF to replace the diesel railcar service with an electric unit. However no timescales are in place for this.[2]

The tram-train service uses 12 36.68 m (120 ft 4 in) long Siemens Avanto tram-trains. These units were financed, and are owned, jointly by the Alsace region and the MAA. The drivers come from SNCF (75%) and Soléa (25%). The line as far as Lutterbach is Soléa's responsibility, with the SNCF taking responsibility from there to Thann and Kruth.[2][3]

See also

References

  1. "Rapport annuel 2018 sur le parc, le trafic et les événements d'exploitation des tramways" (PDF) (in French). STRMTG - Service Technique des Remontées Mécaniques et des Transports Guidés. 20 December 2019. p. 11. Retrieved 2020-09-02.
  2. Haydock, David (April 2011). "France's first real tram train". Today's Railways. Platform 5 Publishing Ltd: 37–40.
  3. "Soléa en chiffres 2010" [Soléa in figures 2010] (in French). Soléa. Archived from the original on 2011-07-19. Retrieved 2011-04-10.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.