USS Daffodil

USS Daffodil was a side-wheel steamer in the United States Navy.

History
Union Navy Jack United States
NameUSS Daffodil
NamesakeThe well-known single-flowered plant.[1]
OwnerB. C. Terry
Acquired17 November 1862
FateSold on 13 March 1867
General characteristics
Class and typeSidewheel Tug
Displacement173 tons
Length110 ft 6 in (33.68 m)
Beam22 ft 6 in (6.86 m)
Draught5 ft 6 in (1.68 m)
PropulsionSteam
Speed8 kts.
Complement35 officers and enlisted[1][2]
Armament2 20-pdr. rifle

Daffodil was built as Jonas Smith by B. C. Terry at Keyport, New Jersey, in 1862. She was purchased at New York 17 November 1862 and fitted out at New York Navy Yard.

Service record

Assigned to duty with the South Atlantic Blockading Squadron, Daffodil sailed 24 November 1862, Acting Master L. G. Crane in command. From her arrival at Port Royal, South Carolina on 10 December 1862 until the end of the war she served as tug in the coastal waters of South Carolina and Georgia. Her services were characterized by Admiral Samuel Francis Du Pont as invaluable. On 8 September 1863 she towed 25 of the boats in the assault on Fort Sumter. From 27 November to 29 December 1864 she took part in the successful Army-Navy expedition up Broad River to destroy the Charleston and Savannah Railroad Bridge near Pocotaligo, South Carolina. On 27 January 1865 she made a reconnaissance up the Ashepoo River and on 9 February joined in a successful engagement with enemy batteries in the Togodo River.

Prizes

Date[2]Prize Name[2]Gross ProceedsCosts and ExpensesAmount for DistributionWhere AdjudicatedSent to 4th Auditor for DistributionVessels Entitled to Share
13 May 1863Wonder$3,627.85[3]$966.01[3]$2,661.84[3]Philadelphia[3]2 Feb 1865[3]Daffodil, Detachment from Wabash[3]
12 Mar 1864General Sumter
14 Mar 1864Hattie Brock

Officers assigned

Tug DaffodilJanuary 1863[4]
RankName
Acting MasterE. M. Baldwin
Acting Master's MateFrancis Such
Acting Master's MateS. C. Bishop
Acting Second Assistant EngineerJ. P. Rossman
Acting Third Assistant EngineerGeo. Cunningham
Steamer DaffodilJanuary 1864[5]
RankName
Acting EnsignF. W. Sanborn
Acting Master's MateJ. C. Wentworth
Acting Master's MateC. L. Weedon
Acting Master's MateT. E. Harvey
Acting Master's MateD. Lester
Acting Second Assistant EngineerT. W. Dee
Acting Third Assistant EngineerWm. Fisher
Acting Third Assistant EngineerW. F. Henderson
Fourth-Rate DaffodilJanuary 1865[6]
RankName
Acting MasterWm. H. Mallard
Acting EnsignJohn McGlathery
Acting Master's MateN. B. Walker
Acting Third Assistant EngineerWm. H. Capen
Acting Third Assistant EngineerThomas Forrest
Acting Third Assistant EngineerJohn Tucker

Post war

After the American Civil War Daffodil joined the newly organized North Atlantic Squadron and was stationed at Port Royal, South Carolina, until sold at Savannah, Georgia on 13 March 1867.

Notes

  1. "Daffodil". Dictionary of American Naval Fighting Ships. Navy Department, Naval History and Heritage Command. Retrieved 2020-03-07.
  2. Silverstone, Warships, p. 122.
  3. Porter, Naval History, p. 843.
  4. Porter, Naval History, p. 391.
  5. Porter, Naval History, p. 675.
  6. Porter, Naval History, p. 773.

References

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

  • Porter, David D. The Naval History of the Civil War Castle, Secaucus, NJ, 1984, ISBN 0-89009-575-2.
  • Silverstone, Paul H. Warships of the Civil War Navies Naval Institute Press,Annapolis, MD, 1989, ISBN 0-87021-783-6.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.