USS Sebago

USS Sebago was a large (832 long tons (845 t)) steamer with very powerful guns and four howitzers, purchased by the Union Navy during the beginning of the American Civil War.

USS Sebago, 1862
History
Union Navy Jack United States
NameUSS Sebago
Laid downdate unknown
Launched
Commissioned26 March 1862
Decommissioned
Stricken1867 (est.)
FateSold, 19 January 1867
General characteristics
TypeDouble-ended gunboat
Displacement832 long tons (845 t)
Length228 ft 2 in (69.55 m)
Beam33 ft 10 in (10.31 m)
Draft9 ft 3 in (2.82 m)
Depth of hold11 ft 8 in (3.56 m)
Propulsion1 × 590 IHP, 44-inch bore by 7 ft stroke inclined direct-acting steam engine; sidewheels
SpeedUnknown
Complement156
Armament1 × 100-pounder Parrott rifle, 1 × 9 in (230 mm) Dahlgren gun smoothbore, 4 × 24-pounder howitzers

With her large crew of 156 sailors, she served the Union Navy during the blockade of ports and waterways of the Confederate States of America as a gunboat.

Built by the Portsmouth Navy Yard in 1861

Sebago — a double-ended, sidewheel gunboat built by the Portsmouth Navy Yard, Kittery, Maine — was launched on 30 November 1861; and commissioned on 26 March 1862, Lieutenant Edmund W. Henry in command.

Civil war service

Assigned to the North Atlantic blockade

Sebago departed Portsmouth, New Hampshire on 6 April 1862 and headed for Hampton Roads, Virginia, to join the North Atlantic Blockading Squadron and reached Newport News, Virginia on the 11th.

She was ordered to the York River to support General George B. McClellan's push up the peninsula toward Richmond, Virginia, and operated in that river and its tributaries supporting Union Army operations.

Then, on 30 June, after General Robert E. Lee had defeated McClellan in the Seven Days campaign and had driven the Army of the Potomac from the York to the James River, Sebago steamed downstream, rounded Old Point Comfort, and ascended the James escorting Army transports.

Reassigned to the South Atlantic blockade

Transferred to the South Atlantic Blockading Squadron later that month, Sebago departed Hampton Roads on 25 July and arrived off Charleston, South Carolina, on the 29th to begin a year of blockade duty off the approaches to that important and historic Southern port.

USS Sebago, 1862

On 18 June 1863, the double ender ran aground in Wassaw Sound and suffered some damage. As she was due for an overhaul, she sailed north on 29 July and was decommissioned at the New York Navy Yard on 9 July.

Reassigned to the Gulf of Mexico

Repairs and overhaul completed, Sebago was recommissioned on 2 December and sailed for the Gulf of Mexico for duty in the West Gulf Blockading Squadron in which she served through the end of the Civil War.

The highlight of her operations in the gulf came on 5 August 1864, when she participated in the Battle of Mobile Bay.

Post-war deactivation

After peace returned, Sebago sailed north and was decommissioned at the New York Navy Yard on 29 July 1865. She was sold at New York City on 19 January 1867.

References

  • This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.
  • "USS Sebago (1862-1867)". Online Image Library. Naval Historical Center. 13 May 2001. Retrieved 2008-01-30.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.