Warwick railway station, Perth
Warwick railway station is a railway station on the Transperth network. It is located on the Joondalup line, 13 kilometres (8.1 mi) from Perth station serving the suburb of Warwick.
Warwick | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Mitchell Freeway, Warwick Australia | ||||||||||
Coordinates | 31°50′40″S 115°47′47″E | ||||||||||
Owned by | Public Transport Authority | ||||||||||
Operated by | Transperth | ||||||||||
Line(s) | Joondalup line | ||||||||||
Distance | 13.0 kilometres from Perth | ||||||||||
Platforms | 2 (1 island) | ||||||||||
Tracks | 2 | ||||||||||
Bus routes | 19 | ||||||||||
Bus stands | 8 | ||||||||||
Construction | |||||||||||
Structure type | Ground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | JWK 99831 (platform 1) 99832 (platform 2) | ||||||||||
Fare zone | 2 | ||||||||||
History | |||||||||||
Opened | 28 February 1993 | ||||||||||
Electrified | Yes | ||||||||||
Passengers | |||||||||||
March 2018 | 5,500 per day | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Location of Warwick railway station |
History
Prior to the commissioning of the site as a railway station, the location was originally a bus interchange known as the Warwick Bus Station. Opened in 1987,[1] it was similar in design and appearance to facilities constructed at Mirrabooka and Rockingham for the same purpose. It provided services connecting the Perth central business district to bus routes servicing the then rapidly expanding northern suburbs. The site also contains a privately operated day care centre which remains in operation as of September 2019.[2]
The original bus station was connected to the adjoining Mitchell Freeway by a two-lane on/off ramp in both the north and south directions, constructed in the middle of the Mitchell Freeway reserve. It was constructed to service freeway express buses from Perth, services which were subsequently phased out with the opening of the railway station.[3] The on/off ramp was connected to the bus station via a bridge spanning the southbound lanes of the Freeway. The bus station was positioned on land north of the connecting bridge between the Freeway East Embankment (controlled by the Main Roads Department), Hawker Avenue, land occupied by the Warwick chapel of the Church of Jesus Christ of Latter-day Saints, and adjoining residential housing.[2]
Design and construction
At the time of the station's design, it was recognised by The Urban Rail Electrification Committee that the placement of bus services in close proximity or direct connection to rail infrastructure was of significant importance. This was evidenced by the Kelmscott and Armadale stations, and the then recently completed Cannington station.[3]
Under the Northern Suburbs Transit System Project, construction on the station was scheduled to commence on 16 November 1991, with completion expected by the end of December 1992. Whitfords station being of a very similar design was scheduled for construction in synchronisation with Warwick station.[2]
The station was to include a number of facilities, including a bus concourse to connect with feeder bus services, information booths and offices for railway staff, amenities and services, as well as access services for mobility-impaired passengers in line with design requirements of the time.[2] Further to this, pieces of the Passenger Information Network installed at the station included previously unseen electronic displays on the upper bus decks designed to provide drivers with information so they could connect with appointed trains or communicate with bus depot control in the event of delays.[3] Passenger information systems across the network were upgraded as part of the improvements under the New MetroRail Project.[4]
Car parking spaces were also included as part of the construction project, which included a significant number of on-grade parking bays on the eastern side of the station for commuter use.[2]
The design of the station also allowed for the possible extension of the upper bus deck in a southward direction towards Beach Road. This extension would provide for five additional regular bus bays, as well as additional pedestrian access if required.[5]
As part of the construction of the new railway station the on/off ramps used for buses were demolished; however the original bridge over the southbound lanes was retained to provide upper-level bus station access. A pedestrian pathway was added to the bridge to enable pedestrian movements across to the easy side of the station from a new footbridge linking to Methuen Way, Duncraig.[2]
The most interesting part of the station was the upper bus deck. The deck was constructed of precast concrete that was formed off site, which was then transported to the site before being placed atop columns constructed as part of the stations foundations. Precast concrete flooring was then put in place, held in specially formed ridges running the length of the beams. This upper deck was the most expensive structural element of the station, and was the cause of significant attention and consideration as part of the design and construction process.[2]
Demolition and associated works
Once the new railway station including the bus concourse had opened, the old transfer station was demolished.[2] The costs of demolition for the existing station were not included as part of the construction budget for the new railway station.[9] The land resulting from the demolition of the transfer station was then converted into additional commuter car parking space, bringing the available number of bays up to 830.[2]
After construction
In 2003, the contract for extending the platforms on seven Joondalup line stations, including Warwick station, was awarded to Lakis Constructions. The platforms on these stations had to be extended by 50 metres (160 ft) to accommodate 150-metre (490 ft) long six car trains, which were planned to enter service. Along with the extensions, the platform edges were upgraded to bring them into line with tactile paving standards.[10] Work on this station began in early 2004,[11] and was complete by July 2004.[12]
Services
Warwick station is served by Transperth Joondalup line services.[13]
In March 2018, Warwick station had approximately 5,500 boardings per weekday, making it the busiest station on the Joondalup line.[14]
Platforms
Platforms currently in use are as follows:
Stop | Platform | Line | Stopping pattern | Destination | Notes |
---|---|---|---|---|---|
99831 | 1 | Joondalup | All station, A, K, W | Perth Underground | |
99832 | 2 | Joondalup | All stations | Butler | |
K | Clarkson | ||||
W | Whitfords | W-pattern shuttle peak time weekdays only |
Bus routes
Stop | Route | Destination / description | Notes |
---|---|---|---|
Stand 1 | 904 | Rail replacement service to Perth station | |
Stand 2 | 344 | to Morley bus station via Alexander Heights & Ballajura[15] | |
371 | to Morley bus station via Mirrabooka bus station[16] | ||
447 | to Whitfords station via Moolanda Boulevard[17] | ||
Stand 3 | 441 | to Whitfords station via Seacrest Drive[18] | |
442 | to Whitfords station via Waterford Drive[19] | ||
Stand 4 | 443 | to Whitfords station via Giles Avenue[20] | |
444 | to Whitfords station via Gibson Avenue[21] | ||
904 | Rail replacement service to Butler station | ||
Stand 5 | 445 | to Whitfords station via Coolibah Drive[22] | |
446 | to Whitfords station via Allenswood Road[23] | ||
Stand 6 | 423 | to Stirling station via Hillarys Boat Harbour & Karrinyup bus station[24] | |
450 | to Landsdale via Kingsway City Shopping Centre[25] | ||
Stand 7 | 387 | to Perth Busport via Eglington Crescent, Balcatta Road & Wanneroo Road[26] | |
388 | to Perth Busport via Beach Road & Wanneroo Road[27] | ||
448 | to Kingsway City Shopping Centre via Blackmore Avenue and Giralt Road[28] | ||
449 | to Malaga via Beach Road[29] | ||
Stand 8 | 425 | to Stirling station via Carine & Karrinyup bus station[30] | |
427 | to Stirling station via Erindale Road & North Beach Road[31] | ||
428 | to Stirling station via Balcatta[32] |
References
- Transperth (13 September 1987). Timetable - K8. Accessed at Battye Library, Perth.
- Design Development; Northern Suburbs Transit System; Warwick Transfer Station for Perth Electric - Perth Urban Rail Development. Perth: Anthony Brand, Brand Dekyn and Hay - Architects. 1991.Accessed at Battye Library, Perth
- Northern Suburbs Transit System; Perth to Joondalup Railway; Progress Summary - June 1991. Perth: The Urban Rail Electrification Committee, Government of Western Australia. 1991. pages 2, 20 Accessed at J S Battye Library, Perth
- "Issue 14, September 2006" (PDF). OnTrack Magazine. Public Transport Authority, Government of Western Australia. Archived from the original (PDF) on 28 August 2007. Retrieved 13 April 2007. Pg. 8
- Design Development; Northern Suburbs Transit System; Warwick Transfer Station for Perth Electric - Perth Urban Rail Development. Perth: Anthony Brand, Brand Dekyn and Hay - Architects. 1991.Section 3.2, Accessed at J S Battye Library, Perth
- Bus/train interchanges on northern subs railway to open February Archived 10 January 2016 at the Wayback Machine Minister for Transport 28 January 1993
- History of Stations on the Clarkson Train Line Right Track
- Transperth (21 March 1993). Bus Timetable - J11. Accessed at J S Battye Library, Perth
- Design Development; Northern Suburbs Transit System; Warwick Transfer Station for Perth Electric - Perth Urban Rail Development. Perth: Anthony Brand, Brand Dekyn and Hay - Architects. 1991. Section 1.4, Accessed at J S Battye Library, Perth
- "OnTrack: October 2003" (PDF). New MetroRail. October 2003. Archived from the original (PDF) on 29 August 2007. Retrieved 24 October 2021.
- "OnTrack: April 2004" (PDF). New MetroRail. April 2004. Archived from the original (PDF) on 29 August 2007. Retrieved 24 October 2021.
- "OnTrack: July 2004" (PDF). New MetroRail. July 2004. Archived from the original (PDF) on 29 August 2007. Retrieved 24 October 2021.
- Joondalup Line Timetable Archived 19 February 2017 at the Wayback Machine Transperth 31 January 2016
- "Yanchep Rail Extension Project Definition Plan" (PDF). Metronet. June 2018. p. 18. Retrieved 14 May 2023.
- "Route 344". Bus Timetable 105 (PDF). Transperth. 17 November 2022 [effective from 18 December 2022].
- "Route 371". Bus Timetable 70 (PDF). Transperth. 15 November 2022 [effective from 18 December 2022].
- "Route 447". Bus Timetable 64 (PDF). Transperth. 7 December 2022 [effective from 29 January 2023].
- "Route 441". Bus Timetable 63 (PDF). Transperth. 19 June 2023 [effective from 16 July 2023].
- "Route 442". Bus Timetable 63 (PDF). Transperth. 19 June 2023 [effective from 16 July 2023].
- "Route 443". Bus Timetable 84 (PDF). Transperth. 15 February 2023 [effective from 19 February 2023].
- "Route 444". Bus Timetable 84 (PDF). Transperth. 15 February 2023 [effective from 19 February 2023].
- "Route 445". Bus Timetable 64 (PDF). Transperth. 7 December 2022 [effective from 29 January 2023].
- "Route 446". Bus Timetable 64 (PDF). Transperth. 7 December 2022 [effective from 29 January 2023].
- "Route 423". Bus Timetable 62 (PDF). Transperth. 20 June 2023 [effective from 16 July 2023].
- "Route 450". Bus Timetable 80 (PDF). Transperth. 12 October 2022 [effective from 13 November 2022].
- "Route 387". Bus Timetable 81 (PDF). Transperth. 21 June 2023 [effective from 16 July 2023].
- "Route 388". Bus Timetable 81 (PDF). Transperth. 21 June 2023 [effective from 16 July 2023].
- "Route 448". Bus Timetable 80 (PDF). Transperth. 12 October 2022 [effective from 13 November 2022].
- "Route 449". Bus Timetable 80 (PDF). Transperth. 12 October 2022 [effective from 13 November 2022].
- "Route 425". Bus Timetable 62 (PDF). Transperth. 20 June 2023 [effective from 16 July 2023].
- "Route 427". Bus Timetable 61 (PDF). Transperth. 16 June 2022 [effective from 17 July 2022].
- "Route 428". Bus Timetable 61 (PDF). Transperth. 16 June 2022 [effective from 17 July 2022].
External links
Media related to Warwick railway station, Perth at Wikimedia Commons