Windy Point/Windy Flats
The Windy Point/Windy Flats project, located in Goldendale, Washington, is the largest wind farm in Washington State. The 90 square miles (230 km2) wind farm spans 26 miles (42 km) along the Columbia River ridgeline and has a capacity of 500 megawatts (MW).
Windy Point/Windy Flats | |
---|---|
Country | United States |
Location | Goldendale, Washington |
Coordinates | 45°44′31″N 120°43′32″W |
Status | Operational |
Owner(s) | Tuolumne Wind Project Authority (Phase I); CRG Partners - a Cannon Power Group affiliate (Phase II and III) |
Power generation | |
Units operational | 130 x 2.3 MW 20 x 2.0 MW |
Make and model | Siemens Wind Power Repower |
Nameplate capacity | 398.8 MW |
Capacity factor | 29.4% (average 2010-2017) |
Annual net output | 1,028 GW·h |
Construction of 400 of the 500 MW was completed by the end of 2009. Cannon Power Group, the project developer, constructed the 400 MW in two phases within 18 months—Phase I (137 MW) and Phase II (262 MW).
Location
The Windy Point/Windy Flats project is located in Goldendale, Washington, along the Columbia River some 100 miles (160 km) east of Portland, Oregon, 70 miles (100 km) south of Yakima, Washington, and 100 miles (160 km) west of the Tri-Cities. The terrain is generally rolling with an elevation of 1,620 feet (494 m) at the airport.
Partners
The Maryhill Museum of Art has entered into an agreement with Cannon Power Group to site 15 wind turbines on the eastern end of the museum's 5,300 acres (21 km2) in SW Washington State. According to the American Wind Energy Association, this is believed to be the first wind energy project in the United States to generate revenues for a nonprofit museum. The relationship is now positioned to generate more than $100,000 in revenue for the museum each year.