Yangcheng Power Station (Chinese: 阳城电厂) is a coal-fired power station in Beiliu, Shanxi, China. It has an installed capacity of 3,300 MW. The plant was first commissioned in 1996.[2] Construction on phase one of the plant began in 2001 and ended in 2007.[1] The plant is the site of the world's two largest dry cooling towers.[3]

Yangcheng Power Station
阳城电厂
CountryChina
LocationShanxi
Coordinates35°28′01″N 112°34′21″E
StatusOperational
Construction began2002
Commission date1996
Owner(s)Datang International Power Generation Company[1]
Thermal power station
Primary fuelCoal
Power generation
Units operational6 x 350 MW,
2 x 600 MW
Nameplate capacity3,300 MW