Circular line (New Taipei)

The Circular or Yellow line (code Y) (Chinese: 環狀線) is a metro line in New Taipei City. The first phase of the project consists of the section from Dapinglin to New Taipei Industrial Park and is approximately 15.4 km (9.6 mi) long with 14 stations.[5] This initial section was opened on 31 January 2020.[3] Hitachi Rail Italy supplied 17 sets of 4-car driverless medium-capacity trains for the line.[6][1]

Circular line
A Circular line train (Driverless Metro) at Dapinglin
Overview
LocaleTaipei and New Taipei, Taiwan
Termini
Stations14 (Western Section)
Service
TypeRapid transit
Operator(s)New Taipei Rapid Transit Corporation
Depot(s)
  • North
  • South
Rolling stock
History
Opened31 January 2020 (2020-01-31)[3]
Technical
Line length15.4 km (9.6 mi)[4]
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed80 km/h (50 mph)
Route map

Y01
Taipei Zoo
(Left arrow )
Y02
National Chengchi University
Y03
Wenshan District Office
Y04
Mamingtan
Y05
Gouzikou
Y06
Baodoucuo
(Left arrow  Right arrow)
Y07
Dapinglin
Y08
Shisizhang
Y09
Xiulang Bridge
Y10
Jingping
Y11
Jingan
(Left arrow  Right arrow)
Y12
Zhonghe
(Left arrow future  Right arrow)
Y13
Qiaohe
Y14
Zhongyuan
Y15
Banxin
Y16
Banqiao
(Left arrow  Right arrow)
(Left arrow Taiwan High Speed Rail Right arrow)
Y17
Xinpu Minsheng
Y18
Touqianzhuang
(Left arrow  Right arrow)
Y19
Xingfu
Y20
New Taipei Industrial Park
(Left arrow   Right arrow)
Y21
New Taipei City Exhibition Hall
Y22
Gengliao
Y23
Zhonglu
Y24
St Ignatius High School
(Left arrow  Right arrow)
Y25
Fenziwei
Y26
Chongyang Bridge
Y27
Shezi
Keelung River
Y28
Fudeyang
Y29
Shilin
(Left arrow  Right arrow)
Y30
Linzikou
Y31
National Palace Museum
Y32
Jiannan Road
(Up arrow  Right arrow)
Y33
Xiatayou
Y34
Zhouzi
Y35
Neihu Technology Park
Y36
Ruiguang Park
Y37
Fenliao
Y38
Jiulizu
Y39
Songshan
(Left arrow )
(Left arrow Taiwan High Speed Rail Right arrow)
(Up arrow  Right arrow)
Y40
Yongchun
(Up arrow  Right arrow)
Y41
Xiangshan
Y42
Sanzhangli
Note: Names in italics are only possible names and may change.
Circular line
Traditional Chinese環狀線
Simplified Chinese环状线
Yellow line
Traditional Chinese黃線
Simplified Chinese黄线

Construction

Hitachi Rail STS supplied electromechanical equipment for the line, including driverless technology and CBTC signaling.[6][1] Dapinglin, currently the only underground station on the line, was constructed by RSEA Engineering Corporation and employed the cut-and-cover method.[7]

Construction for the first phase officially broke ground on 11 July 2011 on a 6.3 km (3.9 mi) elevated section between Zhonghe and Banqiao.[8] The section is estimated to cost NT$13.7 billion, with the entire first-stage 15.4 km (9.6 mi) route estimated to cost NT$54.7 billion to construct.

The line includes the first elevated split platforms in the system at Zhonghe, Qiaohe, and Zhongyuan due to the narrowness of the available station area.[9][10]

Stations in operation

The western section of the line officially opened on 31 January 2020.[3][11]

Code Station Name Transfer District City
English Chinese
Y07 Dapinglin 大坪林 Xindian New Taipei
Y08 Shisizhang 十四張
Y09 Xiulang Bridge 秀朗橋 Zhonghe
Y10 Jingping 景平
Y11 Jingan 景安
Y12 Zhonghe 中和 (constructing)
Y13 Qiaohe 橋和
Y14 Zhongyuan 中原
Y15 Banxin 板新 Banqiao
Y16 Banqiao 板橋 (out of station) Taiwan Railways Administration Taiwan High Speed Rail
Y17 Xinpu Minsheng 新埔民生 (Xinpu)
Y18 Touqianzhuang 頭前庄 Xinzhuang
Y19 Xingfu 幸福
Y20 New Taipei Industrial Park 新北產業園區

Stations under construction

The north and south sections are approved for construction. [lower-alpha 1] Currently under construction, with estimated completion in 2029.

South section

Stations Y01–06 are approved for construction. (Unopened stations' names are to be confirmed)

Code Station Name Transfer District City
English Chinese
Y01 Taipei Zoo 臺北動物園 Maokong Gondola Wenshan Taipei
Y02 National Chengchi University 政大
Y03 Wenshan District Office 文山區公所
Y04 Mamingtan 馬明潭
Y05 Gouzikou 溝子口
Y06 Baodoucuo 寶斗厝 To be connected to Dapinglin Xindian New Taipei

North section

Stations Y21–32 are approved for construction. (Unopened stations' names are to be confirmed)

Code Station Name Transfer District City
English Chinese
Y21 New Taipei City Exhibition Hall 工商展覽中心 To be connected to New Taipei Industrial Park Wugu New Taipei
Y22 Gengliao 更寮
Y23 Zhonglu 中路 Luzhou
Y24 St Ignatius High School 徐匯中學
Y25 Fenziwei 分子尾
Y26 Chongyang Bridge 重陽橋 Sanchong
Y27 Shezi 社子 Shilin Taipei
Y28 Fudeyang 福德洋
Y29 Shilin 士林
Y30 Linzikou 林子口
Y31 National Palace Museum 故宮
Y32 Jiannan Road 劍南路 Zhongshan

Planned stations

The east section is still under planning and subject to change.[lower-alpha 1] After this section is complete, the Circular line will go in a circle.

East section

(Unopened stations' names are to be confirmed)

Code Station Name Transfer Districts City
English Chinese
Y33 Xiatayou 下塔悠 To be connected to Jiannan Road Zhongshan Taipei
Y34 Zhouzi 洲子 Neihu
Y35 Neihu Technology Park 內湖科技園區
Y36 Ruiguang Park 瑞光公園
Y37 Fenliao 粉寮
Y38 Jiulizhu 舊里族 (planned)
Y39 Songshan 松山 (out-of-station) Taiwan Railways Administration Songshan
Y40 Yongchun 永春 (out-of-station) Xinyi
Y41 Xiangshan 象山 (out-of-station)
Y42 Sanzhangli 三張犁 To be connected to Taipei Zoo

See also

Notes

  1. The listed station codes are those used for the construction project and may differ from those used by the operator.

References

  1. "Sale of AnsaldoBreda and Ansaldo STS from Finmeccanica to Hitachi Completed" (Press release). Tokyo and Rome: Hitachi Rail. 2 November 2015. Archived from the original on 1 December 2020. Retrieved 26 January 2020.
  2. Collet, Coralie; Chan, Jane (30 September 2021). "Alstom-led consortium to deliver innovative integrated system for Taipei's fully automated metro line" (Press release). Alstom. Retrieved 15 January 2022.
  3. 陳怡璇 (21 January 2020). "Jié yùn huán zhuàng xiàn 1 yuè 31 rì tōngchē" 捷運環狀線 1月31日通車 [MRT Circular Line Opens to Traffic on January 31]. CNA.
  4. "Xīnběi huán zhuàng xiàn qiāodìng 1/31 tōngchē!3 Yuè kāishǐ zhèngshì shōufèi" 新北環狀線敲定1/31通車!3月開始正式收費 [New Taipei Circular Line Is Finalized 1/31 to Open to Traffic! Official Fees Will Start in March]. newtalk.tw (in Chinese). 21 January 2020.
  5. "Second Stage of Taipei MRT (Approved MRT line)". Comprehensive Planning Division. 4 July 2009. Archived from the original on 7 February 2010. Retrieved 14 August 2009.
  6. Pearce, Jane (17 March 2009). "Taipei Circular Line Kicks off". Railway Gazette. Retrieved 16 March 2021.
  7. "Part of Circular Line Phase One Construction Successfully Awarded and Main Construction to be Launched". Department of Rapid Transit Systems. 23 December 2009. Archived from the original on 15 August 2011. Retrieved 22 February 2010.
  8. Liu, Philip (12 July 2011). "Construction on 1st-Stage Ring Section of Taipei MRT Breaks Ground". China Economic News Service. Retrieved 14 July 2011.
  9. "Construction of the Circular Line Launched". Department of Rapid Transit Systems. 1 June 2011. Archived from the original on 14 July 2011. Retrieved 22 July 2011.
  10. "Huán zhuàng xiàn CF650 biāogāo jià duàn kāigōngle" 環狀線CF650標高架段開工了 [Construction of the Cf650 Elevated Section of the Circular Line Started] (PDF) (in Chinese). Department of Rapid Transit Systems. 1 May 2011. Archived from the original (PDF) on 8 October 2011. Retrieved 25 July 2011.
  11. "Taipei MRT Circular Line to Face Inspection Jan. 5". Global News for New Immigrants. Ministry of Interior, National Immigration Agency. 28 December 2019. Archived from the original on 11 January 2020. Retrieved 11 January 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.