Times Square–42nd Street/Port Authority Bus Terminal station
The Times Square–42nd Street/Port Authority Bus Terminal station is a major New York City Subway station complex located under Times Square and the Port Authority Bus Terminal, at the intersection of 42nd Street, Seventh and Eighth Avenues, and Broadway in Midtown Manhattan. The complex allows free transfers between the IRT 42nd Street Shuttle, the BMT Broadway Line, the IRT Broadway–Seventh Avenue Line and the IRT Flushing Line, with a long transfer to the IND Eighth Avenue Line one block west at 42nd Street–Port Authority Bus Terminal. The complex is served by the 1, 2, 3, 7, A, E, N, and Q trains at all times, the W train during weekdays, the C, R, and 42nd Street Shuttle (S) trains at all times except late nights, and by <7> trains during rush hours in the peak direction. A free passageway from the shuttle platform to the 42nd Street–Bryant Park/Fifth Avenue station, served by the 7, <7>, B, D, F, <F>, and M trains, is open during the day from 6 a.m. to 12 a.m.[5]
Times Square–42 Street/ Port Authority Bus Terminal | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station complex | |||||||||||
Station statistics | |||||||||||
Address | West 42nd Street, Broadway, Seventh, & Eighth Avenues New York, New York 10036 | ||||||||||
Borough | Manhattan | ||||||||||
Locale | Times Square, Midtown Manhattan | ||||||||||
Coordinates | 40°45′21.6″N 73°59′13.2″W | ||||||||||
Division | A (IRT), B (BMT, IND)[1] | ||||||||||
Line | IRT 42nd Street Shuttle BMT Broadway Line IRT Broadway–Seventh Avenue Line IND Eighth Avenue Line IRT Flushing Line | ||||||||||
Services | 1 (all times) 2 (all times) 3 (all times) 7 (all times) <7> (rush hours until 9:30 p.m., peak direction) A (all times) C (all except late nights) E (all times) N (all times) Q (all times) R (all except late nights) W (weekdays only) S (all except late nights) | ||||||||||
System transfers | At 42nd Street–Bryant Park/Fifth Avenue, daytime (6 a.m. to 12 a.m.) only: 7 (all times) <7> (rush hours until 9:30 p.m., peak direction) B (weekdays until 11:00 p.m.) D (all times) F (all times) <F> (two rush hour trains, peak direction) M (weekdays until 9:00 p.m.) | ||||||||||
Transit | NYCT Bus: M7, M20, M34A SBS, M42, M104, SIM8, SIM8X, SIM22, SIM25, SIM26, SIM30 MTA Bus: BxM2 Port Authority Bus Terminal New Jersey Transit Bus: 107, 108, 111, 112, 113, 114, 115, 116, 117, 119, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 135, 136, 137, 138, 139, 144, 145, 148, 151, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 177, 190, 191, 192, 193, 194, 195, 196, 197, 198, 199, 308, 319, 320, 321, 324, 355 | ||||||||||
Structure | Underground | ||||||||||
Levels | 5 | ||||||||||
Other information | |||||||||||
Opened | June 3, 1917[2] | ||||||||||
Accessible | Partially ADA-accessible (passageway between IND platforms and rest of complex is not accessible) | ||||||||||
Traffic | |||||||||||
2019 | 65,020,294[3] 0.1% | ||||||||||
Rank | 1 out of 424[3] | ||||||||||
| |||||||||||
| |||||||||||
| |||||||||||
Times Square–42nd Street Subway Station | |||||||||||
MPS | New York City Subway System MPS | ||||||||||
NRHP reference No. | 04001016[4] | ||||||||||
Added to NRHP | September 17, 2004 |
The present shuttle platforms were built for the Interborough Rapid Transit Company (IRT) as a local station on the city's first subway line, which was approved in 1900. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. As part of the Dual Contracts between the IRT and the Brooklyn–Manhattan Transit Corporation (BMT), the Broadway–Seventh Avenue Line platforms opened in 1917, followed by the Broadway Line platforms in 1918 and the Flushing Line platforms in 1928. The original platforms were also reconfigured to serve the shuttle. The Eighth Avenue Line platforms opened in 1932 as part of the Independent Subway System (IND). The complex has been reconstructed numerous times over the years. The free transfer between the IRT and BMT opened in 1948 while the transfer to the IND opened in 1988. The complex, excluding the IND station, was placed on the National Register of Historic Places in 2004. In the early 21st century, the shuttle station was reconfigured.
Excluding closed platforms, the Flushing Line and shuttle stations have one island platform and two tracks, while the Broadway Line, Broadway–Seventh Avenue Line, and Eighth Avenue Line stations have two island platforms and four tracks. All platforms and most of the station complex is compliant with the Americans with Disabilities Act of 1990, except for the IND passageway. The Times Square–42nd Street complex is the busiest station complex in the system, serving 65,020,294 passengers in 2019.[3]
History
The IRT platforms have been connected to each other as a transfer station as the lines opened: first between the 42nd Street Shuttle and the Broadway–Seventh Avenue Line in 1917, then the transfer was incorporated with the Flushing Line in 1927.[6] On December 24, 1932, a 600-foot-long (180 m) passageway was opened, connecting the IND Eighth Avenue Line station and the IRT platforms, with a new entrance at West 41st Street between Seventh Avenue and Eighth Avenue.[6][7] The passageway was not located within a fare control, and passengers had to pay an extra fare to transfer between the IND and the IRT station.[7] The free transfer between the IRT and BMT was added on July 1, 1948.[8] The block-long passageway that runs west to the 42nd Street–Port Authority Bus Terminal station on the IND Eighth Avenue Line was reopened within fare control on December 11, 1988.[9]
First subway
Planning for a subway line in New York City dates to 1864.[10]: 21 However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature authorized the Rapid Transit Act.[10]: 139–140 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, chief engineer of the Rapid Transit Commission. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[11]: 3 A plan was formally adopted in 1897, which called for the subway to run under several streets in lower Manhattan before running under Fourth Avenue, 42nd Street, and Broadway. A previous proposal had called for the entire length of the subway to use Broadway, but the "awkward alignment...along Forty-Second Street", as the commission put it, was necessitated by objections to using the southernmost section of Broadway. Legal challenges were resolved near the end of 1899.[10]: 148 The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[12] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[10]: 165 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[11]: 4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[10]: 182
The present shuttle station at Times Square–42nd Street was constructed as part of the route segment underneath 42nd Street and Times Square, which extended from Park Avenue and 41st Street to Broadway and 47th Street. Construction on this section of the line began on February 25, 1901. Work for that section had been awarded to Degnon-McLean.[12] By late 1903, the subway was nearly complete, but the IRT Powerhouse and the system's electrical substations were still under construction, delaying the system's opening.[10]: 186 [13] The Times Square–42nd Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the West Side Branch.[10]: 186 [14] Times Square itself had recently been renamed (from Long Acre Square) in order to give the new subway station a distinctive name.[15]
After the first subway line was completed in 1908,[16] the station was served by local trains along both the West Side (now the Broadway–Seventh Avenue Line to Van Cortlandt Park–242nd Street) and East Side (now the Lenox Avenue Line). West Side local trains had their southern terminus at City Hall during rush hours and South Ferry at other times, and had their northern terminus at 242nd Street. East Side local trains ran from City Hall to Lenox Avenue (145th Street).[17]
Expansion
To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening platforms at stations along the original IRT subway.[18]: 168 As part of a modification to the IRT's construction contracts, made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $43.6 million in 2021) spent on platform lengthening, $500,000 (equivalent to $14,541,000 in 2021) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[19]: 15 Platforms at local stations, such as the Times Square station, were lengthened by between 20 to 30 feet (6.1 to 9.1 m). The northbound platform was extended to the north and south, while the southbound platform was lengthened to the south, necessitating a reconfiguration of the Knickerbocker Hotel entrance.[19]: 109–110
Dual Contracts
The Dual Contracts were formalized in March 1913, specifying new lines or expansions to be built by the IRT and the Brooklyn Rapid Transit Company (BRT).[20] As part of the Dual Contracts, the New York City Public Service Commission planned to split the original IRT system into three segments: two north–south lines, carrying through trains over the Lexington Avenue and Broadway–Seventh Avenue Lines, and a west–east shuttle under 42nd Street. This would form a roughly "H"-shaped system. The original alignment under 42nd Street would become a shuttle service, and a new set of platforms would be built for the Broadway–Seventh Avenue Line.[21] The Broadway–Seventh Avenue Line station opened on June 3, 1917, as part of an extension of the IRT to South Ferry.[2] It was served by a shuttle train to 34th Street–Penn Station until the rest of the extension opened a year later on July 1, 1918. This meant that the subway would be expanded down the West Side of Manhattan to neighborhoods such as Greenwich Village and the western portion of the Financial District.[22] On August 1, the Dual Contracts' "H system" was put into service, and the former main line platform became part of the 42nd Street Shuttle.[23]
Also planned under the Dual Contracts was the Broadway Line of the Brooklyn Rapid Transit Company (BRT), subsequently the Brooklyn–Manhattan Transit Corporation (BMT). The Broadway Line station was planned as a local station, with the express station to be located at 47th Street. In 1914, the Public Service Commission ordered BRT Chief Engineer Craven to make the Broadway Line station an express station, at the insistence of Brooklynites who wanted an express station in the Theater District of Manhattan.[24] The Broadway Line station opened on January 5, 1918.[25]
The Dual Contracts also included completing and opening the Steinway Tunnel as part of the new Flushing subway line.[26][27]: 168 The tunnel, running under the East River with trolley loops on both the Manhattan and Queens sides, had sat unused since 1907, when test runs had been performed in the then-nearly-complete tunnel.[28] The route, traveling under 41st and 42nd Streets in Manhattan, was to go from Times Square through the tunnel over to Long Island City and from there continue toward Flushing.[29][30] The section of the tunnel between Grand Central–42nd Street and Queens had opened on June 22, 1915.[31]
In July 1920, the New York State Public Service Commission announced it would extend the Flushing Line two stops west to Times Square, with an intermediate station under Bryant Park.[32][33] On November 9, 1921, the New York State Transit Commission opened up the contract for the extension for bidding. The extension would take a slightly different route than the one specified in the Dual Contracts. The original proposal had the line constructed under 42nd Street to a point just to the east of Broadway, which would have forced riders transferring to the IRT Broadway–Seventh Avenue Line to walk a long distance.[34]
The Times Square station would be designed at a lower level than the two existing stations at Times Square. It would have two upper mezzanines connected by passageways: a mezzanine east of Seventh Avenue extending to Broadway, and one west of Seventh Avenue. Escalators would connect these upper mezzanines with the lower mezzanine, and a provision would be made to permit the installation of an escalator to the east of Seventh Avenue. There would be two entrances at street level at each of the western corners of 41st Street and Broadway, and two entrances at the northeastern corner of 41st Street and Seventh Avenue.[34]
On November 22, 1921, the Powers-Kennedy Contracting Corporation was awarded a contract to construct the extension on a low bid of $3,867,138, below the estimated cost of over $4 million.[34] This low bid was the narrowest margin ever recorded for any large city contract, beating out the next highest bidder by 0.7 percent. While the contractor was provided four years to complete work, engineers expected to reduce the time needed to do so to as little as three years. Since work on the project had to be completed underneath the foundations of several large buildings, such as theatres, and the north end of the New York Public Library, the contractor had to provide a $1 million bond.[35]
The project was expected to reduce crowding on the 42nd Street Shuttle by enabling riders to use the Queensboro Subway to directly access Times Square. 24,000 of the estimated 100,000 daily shuttle riders transferred to and from the Queensboro Subway. The line was to extend as far as Eighth Avenue to connect with the proposed IND Eighth Avenue Line.[36][37]
Powers-Kennedy started excavating the line westward from Grand Central in May 1922. The Flushing Line extension was to run beneath the original line from Vanderbilt to Fifth Avenue.[38] The contractors had completed the tunnels to Fifth Avenue by May 1923.[39] Local civic groups advocated for the Fifth Avenue station to be used as a temporary terminal while the permanent terminus at Times Square was being completed.[40][41] By the end of 1923, the Transit Commission had allocated $50,000 for the construction of a temporary crossover east of the Fifth Avenue station.[42] The temporary terminal at Fifth Avenue was nearly complete by February 1926.[43][44]
The Fifth Avenue station opened on March 22, 1926, extending the IRT Flushing Line one stop to the west from the line's previous terminus at Grand Central.[45][46][47] In fall 1926, it was announced that the line would be completed by January 1, 1927.[48]
On February 8, 1927, the New York City Board of Transportation informed the New York State Transit Commission that work on the Times Square station was sufficiently completed to enable the start of train service beginning on February 19, 1927 with the completion of work to a point between Eighth Avenue and Seventh Avenue. Plans for the construction of an extension of the line to between Eighth Avenue and Ninth Avenue to provide a physical connection with the IND Eighth Avenue Line were underway.[49]
On March 1, 1927, the opening of the line was set for March 15, the third time an opening date was set for the line. Work had been postponed given the amount of work that remained to be completed. The opening of the line was about a year behind the April 29, 1926 date specified in the contract. The delay was the result of surprisingly difficult construction. The Board of Transportation had withheld retained percentages, as allowed in the contract, penalizing the contractor, and trying to incentivize it to speed up work. No retained percentages were provided to the contractor until February 1927.[48] The Flushing Line was extended to Times Square on March 14, 1927.[50][51]
Independent Subway System
As early as March 1918, soon after the BMT Broadway Line opened to Times Square–42nd Street, plans were being considered for an extension of that line beyond the stubs at 57th Street–Seventh Avenue to the Upper West Side and Washington Heights via Central Park West (Eighth Avenue).[52] On August 3, 1923, the New York City Board of Estimate approved the Washington Heights Line, an extension of the Broadway Line to Washington Heights. The line was to have four tracks from Central Park West at 64th Street under Central Park West, Eighth Avenue, Saint Nicholas Avenue, and private property to 173rd Street, and two tracks under Fort Washington Avenue to 193rd Street. South of 64th Street, one two-track line would connect to the Broadway Line stubs at 57th Street, and another would continue under Eighth Avenue to 30th Street at Penn Station, with provisions to continue downtown.[53][54]
Mayor John Hylan instead wanted to build an independent subway system, operated by the city. The New York City Board of Transportation (NYCBOT) gave preliminary approval to several lines in Manhattan, including one on Eighth Avenue, on December 9, 1924. The main portion of the already-approved Washington Heights Line—the mostly-four track line north of 64th Street—was included, but was to continue north from 193rd Street to 207th Street. South of 64th Street, the plan called for four tracks in Eighth Avenue, Greenwich Avenue, the planned extension of Sixth Avenue, and Church Street. Two tracks would turn east under Fulton Street or Wall Street and under the East River to Downtown Brooklyn.[55][56]
A groundbreaking ceremony was held at St. Nicholas Avenue and 123rd Street on March 14, 1925.[57] Most of the Eighth Avenue Line was dug using a cheap cut-and-cover method, where the street above was excavated. Still, the construction of the line was difficult, as it had to go under or over several subway lines. 42nd Street, the longest station along the line at 1,115 feet (340 m), was expected to be a major express station with large platforms, so the platforms were staggered away from each other in order to avoid going under property lines. Additionally, several workers died in cave-ins during construction.[58]
The stations on the line were built with 600 feet (180 m) long platforms, but they had provisions to lengthen them to 660 feet (200 m) to accommodate eleven-car trains.[59]: 70 Four of the express stations (at Fulton, 14th, 42nd, and 59th Streets) were built with long mezzanines so that passengers could walk the entire length of the mezzanines without having to pay a fare. It was proposed to develop the mezzanines of these four stations with shops, so that they would become retail corridors, similar to the underground mall of the under-construction Rockefeller Center.[58]
The Eighth Avenue Line station opened on September 10, 1932, as part of the city-operated Independent Subway System (IND)'s initial segment, between Chambers Street and 207th Street.[60][61] The IND's lower level was built together with the upper-level platforms in the late 1920s/early 1930s, but existed as an unfinished shell until it was completed[62]: 484 The lower level opened on August 25, 1952,[63] to serve rush hour E trains.[63][64] For most of its existence, the lower-level platform was only used for occasional service specials, including summer "Rockaway Special" trains to Beach 98th Street at the Rockaways' Playland beginning in 1958, the Aqueduct Racetrack special fare trains from 1959 to 1981, and rush hour E trains in the 1970s, beginning on March 23, 1970.[65][66][67][68]
Mid-20th century
The Broadway–Seventh Avenue Line station was the site of a 1928 wreck that killed 16 people, the second worst in New York City history (the worst being the Malbone Street Wreck in Brooklyn, which killed at least 93).[69][70]
In Fiscal Year 1937, the express-track side of the southbound Broadway–Seventh Avenue platform was extended 6.5 feet (2.0 m) to the south to provide ample space at the center door of ten-car trains. In addition, the IRT opened a new entrance to the northwestern corner of Seventh Avenue and 42nd Street through the Rialto Building,[71] on the site of the Rialto Theatre.[72]
The city government took over the BMT's operations on June 1, 1940. At midnight, a ceremony commemorating the transfer, with five hundred people in attendance, was held at the Times Square station. The last BMT train had left the 57th Street station five minutes earlier. When the train arrived at Times Square, BMT president William S. Menden handed over his company's properties to Mayor Fiorello H. LaGuardia, who then gave them to New York City Board of Transportation chairman John H. Delaney.[73][74] The city government then took over the IRT's operations on June 12, 1940.[75][76] The Board of Transportation operated the New York City Transit System until the creation of the New York City Transit Authority in 1953.[77]
The Flushing Line platforms at Times Square, as well as platforms at all other stations on the Flushing Line with the exception of Queensboro Plaza, were extended in 1955–1956 to accommodate 11-car trains.[78] One of the complex's entrances on 43rd Street was closed in 1957 to make way for a Times Square visitor center.[79] This entrance was rebuilt next to the information center after numerous protests,[80] and it reopened in July 1958.[81]
A new entrance at the southwest corner of Seventh Avenue and 42nd Street opened in 1964, and a shopping arcade within the basement of the Rialto Building was closed in July 1967.[82] The BMT station received a minor overhaul in the late 1970s when the MTA fixed the station's structure and the overall appearance, and it repaired staircases and platform edges, removed pedestrian ramps, and replaced lighting.
As part of a pilot program to reduce high crime in the New York City Subway system, in May 1981, the MTA spent $500,000 to install CCTV screens at the Columbus Circle subway station. The MTA expanded the experiment to the Times Square–42nd Street station in 1983.[83] The cameras were deactivated in 1985 after further tests showed that their presence did not help reduce crime.[84] The MTA considered transferring 220 CCTV cameras from these stations to token booths at the stations with the most crime.[85] On August 1, 1988, the passageway between the IND Eighth Avenue Line station and the IRT/BMT complex was finally placed within fare control.[86]
Late 20th and early 21st centuries
The Empire State Development Corporation (ESDC), an agency of the New York state government, had proposed redeveloping the area around a portion of West 42nd Street in 1981.[87] As part of the redevelopment, in 1988, the state and NYCTA announced that they would spend $125 million on renovating the Times Square subway complex.[88] The project was postponed in 1992 after Prudential Insurance and Park Tower Realty, which had committed to developing four buildings in the redevelopment, was given permission to postpone the construction of these buildings.[89][90] The station underwent total reconstruction in stages starting in 1994.[6] Phase 1 rebuilt the Broadway–Seventh Avenue Line platforms with a new mezzanine, stairs, and elevators, and was completed in 2002. Phase 2, finished in 2006, rebuilt the Broadway Line, Flushing Line, and Eighth Avenue Line portions of the station.[6]
Phase 1 and 2 renovation
In 1995, the MTA announced it would build a main entrance on the south side of 42nd Street between Seventh Avenue and Broadway. The site of the new entrance was occupied at the time by an "interim" retail space.[91] Originally, the MTA had proposed consolidating 11 separate entrances to the complex into one full-time main entrance and four part-time entrances.[92] The new main entrance opened in July 1997. It features a bright neon and colored glass flashing sign with train route symbols and the word "Subway", as well as an elevator and escalators.[93]
In July 1998, the MTA started accepting bids for the renovation of the Times Square station. The first phase would include renovating the Broadway–Seventh Avenue Line platforms, part of the Broadway Line platforms, and the mezzanine, while the second phase would cover the rest of the station. The goal was to reduce congestion and improve rider access, comfort and safety by improving visual lines and increasing pedestrian capacity. The main corridor would be widened 15 feet (4.6 m) and the number of sharp corners would be reduced. In addition, there would be new elevators to make the station compliant with the for Americans with Disabilities Act of 1990, new escalators, and wider corridors and stairs. William Nicholas Bodouva & Associates designed the materials for the renovation.[94] A $44 million renovation of the complex began in 1999.[6]
The mezzanine above the BMT Broadway Line, which formerly housed a record shop named Record Mart, was renovated with a large oval balcony looking over the trackway. In 2004, four unisex stall bathrooms were opened on the mezzanine between the IRT and BMT lines; they are staffed and maintained by employees of the Times Square Alliance, the local Business Improvement District. Record Mart reopened in 2007 on the south side of the IRT/BMT corridor,[95] and when it closed permanently in 2020, it had been Manhattan's oldest operating record store.[96] New entrances were added on the northwest and southwest corners of Seventh Avenue and 42nd Street. The southwest-corner entrance at 5 Times Square has both escalators and stairs. The northwest-corner entrance in 3 Times Square only has stairs because the MTA allowed the building's developer Rudin Management to pay $1.3 million instead of adding two escalators.[97]
In the late 2000s, the MTA began construction on an extension of the IRT Flushing Line to 34th Street, which would require demolishing the IND Eighth Avenue lower level platform.[66] As of January 2010, the lower level platform was being demolished as part of the Flushing Line extension.[98] The tunnels slope down through where the old lower level platform was.[99] On September 13, 2015, the Flushing Line was extended one stop west from Times Square to 34th Street–Hudson Yards.[100][101] In February 2022, the MTA announced that the IRT Flushing Line platforms would receive platform screen doors as part of a pilot program.[102][103] The announcement came after several people had been shoved onto tracks, including one incident that led to the death of Michelle Go on the BMT platform.[103] The MTA started soliciting bids from platform-door manufacturers in mid-2022;[104] the doors are planned to be installed starting in April 2023 at a cost of $6 million.[105]
Phase 3 renovation
The shuttle platform was the last station in the station complex that lacked ADA-accessibility. Although planning had been completed in 2006, the project was delayed due to a lack of funding.[106] However, as part of the 2015–2019 Capital Program, the MTA scheduled some improvements to make it accessible under the guidelines of the Americans with Disabilities Act of 1990. As part of the program, the 42nd Street Shuttle became ADA-accessible, the shuttle was reconfigured from three tracks to two tracks, and the trains became six cars long. A new platform, 28 feet (8.5 m) wide and located between tracks 1 and 4, was built along the section of the shuttle that runs under 42nd Street, which is located within a straight tunnel. The whole project was expected to cost $235.41 million. The Times Square shuttle platform was extended 360 feet (110 m) east to allow for a second point of entry at Sixth Avenue, with a connection to the IND Sixth Avenue Line, as well a second connection to the IRT Flushing Line via its Fifth Avenue station.[107][108][109]
The entire Times Square station was rehabilitated with congestion mitigation measures. A wider stairway was installed from the shuttle mezzanine to street level, and a new control area was installed at the bottom of the stairway. The cost of this part of the project is $30 million.[107][108] In conjunction, a second project added access to the Times Square complex. As part of the project, the eastern platform was closed to public access, and the exit to 43rd Street was closed, covered over, and turned into an emergency exit, starting on October 19, 2019. This entrance would be replaced by a new entrance with a 15 foot (4.6 m) wide stairway covered by a canopy.[110] The staircase would lead from the shuttle mezzanine to street level, blocking portions of the station's original finishes. A new control area would be installed at the bottom of the stairway. To further increase capacity, 21 columns were eliminated; other columns at the station were thinned, requiring the underpinning of roof beams; and 142 columns in the concourse area were relocated away from the car doors. The cost of this project was estimated to be $28.93 million.[107]
The new control area provided an additional 5,000 square feet in mezzanine space, while the new entrance provided an additional 450 square feet of space. The entrance's canopy has 238 triangular glass frames that replicate the crystals part of the New Year's Eve Crystal Ball. Eighteen new CCTV cameras, ten new turnstiles, two emergency exit gates, and four new digital information screens were installed in the new control area. Two new mosaics by Nick Cave, titled "Equal All" and "Each One", were installed as part of the project.[111]
The northern section of the original west platform wall dating from 1904 was removed, and One Times Square's owner Jamestown Properties built elevators connecting the station to the street. The wall was broken into sections and moved to the New York Transit Museum to mitigate the adverse effects of the station renovation. To further mitigate damage done to portions of the original station, certain features were repaired and restored, including the original southwest platform and control area wall finishes, the original cast iron columns, the ceiling plaster ornamentation, and the cast iron guard rails. In addition, the east platform walls that were located within back-of-house space were protected. The damaged Knickerbocker marble lintel located at the west platform control area were replicated. To reference portions of the original tracks located at tracks 2 and 3, the granite paving for the shuttle platform was modified with a veneer steel rail. These 60 foot (18 m) long sections are located on the new platform between tracks 1 and 4. Finally, a plaque describing the history of the station was installed underneath the replicated Knickerbocker lintel.[108][112]
The construction contract for the project was originally scheduled to be awarded in June 2018. However, this was delayed by several months because of changes to the project schedule and cost. The construction duration was expected to be extended by three months, and the cost would increase by $25 million, because of additions to the original construction plan.[113] A construction contract was awarded in March 2019, with an estimated completion date of March 2022.[114] The shuttle was temporarily closed in mid-2020 for this work.[115] The new platform opened on September 7, 2021, along with the passageway to the 42nd Street–Bryant Park station.[116][117] This made the shuttle station ADA-accessible; though the passageway was not yet accessible, elevators were planned to be installed at the Bryant Park end of the passageway.[117] The new $40 million station entrance, including the new elevator, formally opened on May 16, 2022.[111][118][119] The MTA spent $30 million to construct the new staircase entrance and Jamestown paid $10 million for the elevator.[118]
Failed terrorist plots
The Times Square station has been targeted by two failed terrorist plots. In September 2009, Najibullah Zazi and alleged co-conspirators planned suicide bombings on subway trains near this station and the Grand Central–42nd Street station, but the plot was discovered before they could carry it out.[120] There was also a bombing on December 11, 2017, during the morning rush hour, when a pipe bomb device partially detonated in the passageway connecting the IND Eighth Avenue Line station with the rest of the complex.[121]
Station layout
G | Street level | Exits/entrances |
B1 | Upper mezzanine | Fare control, station agents, MetroCard machines, passageway to Port Authority Bus Terminal Elevators located:
|
Side platform, not in service | ||
Track 4 | toward Grand Central (Terminus) → | |
Island platform | ||
Track 1 | toward Grand Central (Terminus) → | |
Mezzanine, entrance to 42nd Street and Broadway | ||
B2 Broadway platforms |
Northbound local | ← toward Astoria–Ditmars Boulevard (49th Street) ← toward Forest Hills–71st Avenue (49th Street) ← toward Astoria–Ditmars Boulevard weekdays (49th Street) ← toward 96th Street late nights (49th Street) |
Island platform | ||
Northbound express | ← toward 96th Street (57th Street–Seventh Avenue) | |
Southbound express | Coney Island–Stillwell Avenue via Brighton (34th Street–Herald Square) → toward Coney Island–Stillwell Avenue via Sea Beach (limited rush hour trips) (34th Street–Herald Square) → | toward |
Island platform | ||
Southbound local | Coney Island–Stillwell Avenue via Sea Beach (34th Street–Herald Square) → toward Bay Ridge–95th Street (34th Street–Herald Square) → toward Whitehall Street–South Ferry weekdays (34th Street–Herald Square) → toward Coney Island–Stillwell Avenue via Brighton late nights (34th Street–Herald Square) → | toward |
B2 Broadway–Seventh Avenue platforms |
Northbound local | ← toward Van Cortlandt Park–242nd Street (50th Street) ← toward Wakefield–241st Street late nights (50th Street) |
Island platform | ||
Northbound express | ← toward Wakefield–241st Street (72nd Street) ← toward Harlem–148th Street (72nd Street) | |
Southbound express | toward New Lots Avenue (34th Street–Penn Station) → late night termination track → | toward Flatbush Avenue–Brooklyn College (34th Street–Penn Station)|
Island platform | ||
Southbound local | South Ferry (34th Street–Penn Station) → toward Flatbush Avenue–Brooklyn College late nights (34th Street–Penn Station) → | toward |
B2 Eighth Avenue platforms |
Northbound local | ← toward 168th Street (50th Street) ← toward Jamaica Center–Parsons/Archer (50th Street) ← toward Inwood–207th Street late nights (50th Street) |
Island platform | ||
Northbound express | ← toward Inwood–207th Street (59th Street–Columbus Circle) | |
Southbound express | toward Far Rockaway–Mott Avenue, Ozone Park–Lefferts Boulevard or Rockaway Park–Beach 116th Street (34th Street–Penn Station) → | |
Island platform | ||
Southbound local | toward Euclid Avenue (34th Street–Penn Station) → toward World Trade Center (34th Street–Penn Station) → toward Far Rockaway–Mott Avenue late nights (34th Street–Penn Station) → | |
B3 | Passageway | To Eighth Avenue, Port Authority, trains |
B4 Flushing platform |
Southbound | ← toward 34th Street–Hudson Yards (Terminus) |
Island platform | ||
Northbound | toward Flushing–Main Street (Fifth Avenue) → |
Times Square was named for The New York Times. The Times headquarters, built by Times owner Adolph S. Ochs, housed the original subway station (now the shuttle platforms) in its basement.[122][123][15]
Five separate stations comprise the Times Square complex. The shallowest station is the 42nd Street Shuttle platform, which runs in a northwest–southeast direction under 42nd Street east of Broadway, and is 20 feet (6.1 m) below street level. The IND Eighth Avenue Line station is 30 feet (9.1 m) below the street, running under Eighth Avenue in approximately a north–south direction, one block west of the other platforms. The IRT Broadway–Seventh Avenue Line station runs 40 feet (12 m) under Seventh Avenue and is parallel to the IND Eighth Avenue Line platforms. The BMT Broadway Line station runs in a true north–south alignment 50 feet (15 m) under Broadway. The deepest station, serving the IRT Flushing Line, is 60 feet (18 m) below street level and runs roughly west–east under 41st Street.[4]: 3 [124] The Times Square–42nd Street and 42nd Street–Port Authority Bus Terminal stations are both fully wheelchair-accessible. However, the ramp between the two parts of the complex is not ADA-compliant.[125]
Mezzanine
There are several mezzanines throughout the complex, connected by several ramps and stairs. The primary, upper mezzanine is near the level of the shuttle platforms and consists of four passageways in a trapezoidal layout, arranged under 42nd Street, Broadway, 41st Street, and Seventh Avenue. An oval-shaped cut is on the Broadway side of the main mezzanine, below which are the northern ends of the BMT platforms. A pair of escalators to the Flushing Line is at the southwestern corner of this mezzanine.[4]: 3–4, 18–19 Some parts of the mezzanine have glass-tiled walls, while other parts are clad with white ceramic tile topped by mosaic bands.[4]: 7 "Music Under New York" controls various spots within the mezzanine for performers.
Near the south end of the BMT platforms, there is a smaller mezzanine overhead, which leads to exits at 40th Street.[4]: 3, 19
Under the IRT Broadway–Seventh Avenue Line platforms, but above the Flushing Line platforms, is a lower mezzanine level extending from west to east. This mezzanine connects to a steep ramp that leads to the passageway to the IND Eighth Avenue Line platforms.[4]: 7, 18
Exits
From the Eighth Avenue portion of the complex, there is one street stair to each of the northwest, northeast, and southeast corners of Eighth Avenue and 40th Street. There are two underground passageways to Port Authority Bus Terminal: one between 40th and 41st Streets, and a wheelchair accessible passageway between 41st and 42nd Streets. At the intersection of Eighth Avenue and 42nd Street, there is one street stair to the northwest corner, one stair inside a building on the northeast corner, and one escalator bank inside a building on the southeast corner. One street stair leads to the southwest corner of Eighth Avenue and 43rd Street. Finally, there is one street stair to each of the northwest, southwest, and southeast corners of Eighth Avenue and 44th Street. The southwest-corner entrance also has a wheelchair lift that leads to an elevator. All of these exits are closest to the Eighth Avenue Line platforms and are signed as serving the A, C, E, and 7 trains.[126]
From the Times Square portion of the complex, several exits are signed as serving most or all of the services in the complex. There are two exits inside buildings on 42nd Street west of Seventh Avenue: the north side within 3 Times Square and the south side within 5 Times Square. On the south side of 42nd Street between Seventh Avenue and Broadway, there is an elevator and escalator bank inside the Times Square Tower. The street level fare control at this site features restored original "Times Square" mosaics from the Contract I station walls (now used by the shuttle). One street stair rises to the southeast corner of Broadway and 42nd Street. A block to the south, one stair goes into a building at the northeast corner of 41st Street and Seventh Avenue, and two street stairs go to the southeast corner. An exit-only stair rises to the southwest corner of 41st Street and Broadway.[126][4]: 19–20
Two sets of exits on 40th Street are separate from the main mezzanine areas and are signed as only serving certain services. At 40th Street and Seventh Avenue, one stair goes into a building at the southwest corner, and one street stair goes to the southeast corner. These serve a mezzanine above the Broadway–Seventh Avenue Line platforms and are signed as serving the 1, 2, 3, 7, and S trains. One street stair rises to each of the corners of 40th Street and Broadway, serving the southern mezzanine above the Broadway Line platforms. Those entrances are signed as serving the N, Q, R, W, and S trains.[126][4]: 19–20
There are several closed exits throughout the station complex. Until 1981, there was a stair to the southeastern corner of 41st Street and 8th Avenue.[127][128] Another stair rose to the south side of 41st Street between Seventh and Eighth Avenues in the passageway between the Eighth Avenue Line station and the rest of the station complex, and was closed in 1989 due to very low usage.[129] A street stair to the northeastern corner of 42nd Street and Seventh Avenue, by One Times Square,[130] was closed around 1998–2000.[131] Two stairs to the northeastern corner of 41st Street and Seventh Avenue were closed during the same time, as were stairs to both western corners of that intersection.[131] In 2019, a stair to the southwestern corner of 43rd Street and Broadway was closed as part of the shuttle modernization project.[132][133]
IRT 42nd Street Shuttle platform
Times Square | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | A (IRT)[134] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IRT 42nd Street Shuttle | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | S (all except late nights) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 1 island platform | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | October 27, 1904[135] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible (Transfer accessible to BMT Broadway Line, IRT Broadway–Seventh Avenue Line, and IRT Flushing Line platforms only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | N/A | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Former/other names | 42 Street | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Times Square station on the 42nd Street Shuttle consists of an island platform between tracks 1 and 4, which was completed in 2021.[116][117] It is 28 feet (8.5 m) wide and is 360 feet (110 m) long, with a slight northward curve at the western end.[108] At the east end of the platform is a passageway to the 42nd Street–Bryant Park station,[107][117] running between tracks 1 and 4.[117]
The island platform replaced a layout dating from the original IRT subway, completed in 1904. It was originally a four-track local stop with two side platforms outside the local tracks. Most of the wall along the side platform for track 1 was removed in 1914 to provide a connection to the new Times Square station on the IRT Broadway–Seventh Avenue Line.[4]: 5 An underpass formerly connected the original side platforms.[136]: 146 In 1918, the southbound express track (formerly track 2) was removed and replaced by a temporary wooden platform for access to the original northbound express track (formerly track 3). Track 3's wooden platform was subsequently replaced by a more permanent platform, while the old local platforms still served tracks 1 and 4.[137] Track 3 was taken out of service on November 7, 2020, and was replaced with the island platform.[138]
The old platforms were connected on the west (railroad north) side. A movable walkway crossed track 4, the former northbound local track; the walkway could be temporarily removed to allow access to and from that track.[4]: 5 Because of the curvature on the platforms, gap fillers under the platforms were used on tracks 1 and 3. These two platforms were concave and curved toward the shuttle trains. Track 1 was 295 feet (89.9 m) long and track 3 was 285 feet (86.9 m) long. Track 4 did not have gap fillers because of the convex curve of the platform, curving away from the shuttle trains. The platform serving Track 4 was only 150 feet (45.7 m) long, and could barely fit the three 51.4-foot-long (15.7 m) cars of the shuttle.[4]: 5
Design
As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[139]: 237 The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick.[4]: 3–4 [140]: 9 Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platform next to track 1 contain circular Doric columns spaced every 15 feet (4.6 m). Prior to the 2019–2022 reconstruction, there were additional columns between the tracks and on track 3's platform, spaced every 5 feet (1.5 m), which supported the jack-arched concrete station roofs.[4]: 5–6 [11]: 4 [140]: 9 The renovation removed or relocated many of these columns so they are spaced at wider intervals, and an island platform was built atop tracks 2 and 3.[107] There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[4]: 3–4 [140]: 9
The original decorative scheme for the side platforms consisted of blue tile station-name tablets, blue and pink tile bands, multicolored tile pilasters, a buff faience cornice, and buff faience plaques.[140]: 36 The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[140]: 31 The decorative work was performed by faience contractor Grueby Faience Company.[140]: 36 The former southbound local platform (serving track 1) still has a vestiges of a doorway to the Knickerbocker Hotel,[6][4]: 5 while the former northbound local platform (which once served track 4) retains a former doorway to the Times Building.[6] Small sections of the original wall remained before the station's reconstruction, with brick wainscoting capped by a marble band and white tiles.[4]: 5
The shuttle station contains three works of art, all by Nick Cave.[141][142] Every One (2021), in the passageway between the Times Square and 42nd Street–Bryant Park stations, consists of a mosaic flanking 11 digital screens; one side of the mosaic measures 143 feet (44 m) long and the other measures 179 feet (55 m) long.[142] The mosaic and screens both depict figures in "Soundsuits", sculptural costumes made in a variety of materials. The two other artworks are Each One at the new shuttle entrance and Equal All on the island platform.[141][142]
Track layout
North of the station, track 4 merges into the northbound IRT Broadway–Seventh Avenue Line local track along the original subway alignment, north of the current Broadway–Seventh Avenue Line station.[6] The other three tracks once curved parallel to this. Track 1 ends at a bumper block at the west end of the platform. Track 3 originally also ended at a bumper block at the west end of its platform. There is no track connection between track 4 and the other tracks anywhere along the shuttle.[6]
BMT Broadway Line platforms
Times Square–42 Street | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | B (BMT)[143] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | BMT Broadway Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | N (all times) Q (all times) R (all except late nights) W (weekdays only) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 island platforms cross-platform interchange | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | January 5, 1918[25] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible (Transfer accessible to IRT 42nd Street Shuttle, IRT Broadway–Seventh Avenue Line, and IRT Flushing Line platforms only) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Times Square–42nd Street station on the BMT Broadway Line is an express station, with four tracks and two island platforms.[144] The N and Q trains stop here at all times.[145][146] The R stops here at all times except late nights,[147] while the W stops here during weekdays.[148] Two stairs and one elevator from each platform ascend to the primary mezzanine. At the far south end of each platform, two stairs ascend to the southern BMT mezzanine. Near the center of the southbound platform, a set of stairs rises to the 41st Street corridor of the primary mezzanine.[4]: 3, 19
The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a concrete foundation no less than 4 inches (100 mm) thick. Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platforms contain I-beam columns spaced every 15 feet (4.6 m). Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs. The trackside walls also contain exposed I-beam columns, dividing the trackside walls into 5 foot (1.5 m) wide panels. The panels on the trackside walls consist of white square ceramic tiles. A frieze with multicolored geometric patterns runs atop the trackside walls, and a plaque with a framed white "42" tile is placed inside the frieze every 15 feet (4.6 m). The walls at the south ends of the platforms are not tiled.[4]: 3–4, 6
The express tracks north of the station spread out to pass around a crossunder in the Times Square shuttle platforms.[144] This crossunder was sealed off in the 1960s.
IRT Broadway–Seventh Avenue Line platforms
Times Square–42 Street | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | A (IRT)[149] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IRT Broadway–Seventh Avenue Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 (all times) 2 (all times) 3 (all times) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 island platforms cross-platform interchange | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | June 3, 1917[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt | 1998-2002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible (Transfer accessible to BMT Broadway Line, IRT 42nd Street Shuttle, and IRT Flushing Line platforms only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Times Square–42nd Street station on the IRT Broadway–Seventh Avenue Line is an express station, with four tracks and two island platforms.[144] The 1, 2, and 3 trains stop here at all times.[150][151][152] The station serves as the southern terminal of 3 trains during late nights.[152] The platforms are 510 feet (160 m) long, and were extended to the south in 1959.[4]: 6 Stairways to the other lines are provided at the northern end and in the center of each platform; two stairways from each platform lead to the lower mezzanine level while the remainder lead to mezzanines above the platforms. An elevator leads from each platform to the upper mezzanine; the southbound elevator also leads to the lower mezzanine and the Flushing Line platform.[4]: 17
The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a concrete foundation no less than 4 inches (100 mm) thick. Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platforms contain I-beam columns spaced every 15 feet (4.6 m). Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs. The trackside walls also contain exposed I-beam columns, dividing the trackside walls into 5 foot (1.5 m) wide panels. The panels on the trackside walls consist of white square ceramic tiles. A frieze with multicolored geometric patterns runs atop the trackside walls, and a plaque with a stylized "T" is placed inside the frieze at intervals of every three panels.[4]: 3–4, 6
Just south of the station, a fifth center track begins, formed by a connection from each express track. This track merges back into the two express tracks just before 34th Street–Penn Station.[144] This center track was used in the past for turning rush hour "Gap Trains", which would head back up north. It is currently used for short turning 3 trains during nights.[153]
IND Eighth Avenue Line platforms
42 Street– Port Authority Bus Terminal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | B (IND)[154] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IND Eighth Avenue Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | A (all times) C (all except late nights) E (all times) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Levels | 2 (lower level abandoned) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 island platforms cross-platform interchange (upper level) 1 abandoned side platform (lower level) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 (upper level) 1 (lower level) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | September 10, 1932[60] (upper level) August 25, 1952[63] (lower level) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | 1981 (lower level) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible (passageway to other services not accessible) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 42nd Street–Port Authority Bus Terminal station on the IND Eighth Avenue Line is an express stop. It is partly underneath the Port Authority Bus Terminal. The A and E trains stop here at all times,[155][156] while the C train stops here at all times except late nights.[157] It has one operational platform level, two offset island platforms, and a long mezzanine. Formerly, it also had a lower level with a single side platform. The northbound platform extends from 42nd to 44th Streets, while the southbound platform extends from 40th to 42nd Streets.[58]
The passageway to the Times Square–42nd Street station is stair-free but contains steep ramps, which are not wheelchair-accessible.[125] The station's mezzanine extends four blocks from 40th to 44th Streets, and connects with the rest of the complex by a long passageway underneath 41st Street.[158][159]
Former lower level
In addition to the level currently in use, there was formerly a lower platform on the southbound side (one track underneath the downtown local track on the upper level, and one side platform underneath the island platform above). The lower level featured two high-speed escalators to the mezzanine, and three staircases to the upper-level platform. The walls featured 1950s-era cream tiles, a purple and black tile band, and white mosaic name plates with black "42ND ST" text.[63][64][65]
Theories differ on why the lower-level platform was built. The platform could only be reached by trains originating from Queens via the IND Queens Boulevard Line, and 53rd Street (the current E service). Some commentators have speculated that this was meant to allow Manhattan-bound E trains from Queens to hold at 42nd Street without slowing down service on trains traveling from Central Park West,[66] while the reported purpose of the platform upon its opening was to allow E trains to load and unload passengers without having to wait for one of the two upper level tracks to clear.[63][64] Others have suggested that the lower-level platform was built to prevent the IRT Flushing Line from being extended westward. The IND lower-level platform was located just beyond the tail tracks on the IRT Flushing Line platform.[159][66][99] This explanation is contradicted by the New York Herald Tribune, which wrote in 1928: "The construction is such as will enable the engineers to extend the Queensboro subway under and beyond Eighth Avenue in the direction of the 42nd Street ferry if desired".[160]
Film producers have used the lower-level platform for several films, most notably Ghost (1990), starring Patrick Swayze and Demi Moore.[65][66] By the 2010s, the lower-level platform had been bisected by the extension of the Flushing Line.[99]
IRT Flushing Line platform
Times Square–42 Street | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
New York City Subway station (rapid transit) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Division | A (IRT)[161] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | IRT Flushing Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 7 (all times) <7> (rush hours until 9:30 p.m., peak direction) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure | Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 1 island platform | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | March 14, 1927[162] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible (Transfer accessible to BMT Broadway Line, IRT 42nd Street Shuttle, and IRT Broadway–Seventh Avenue Line platforms only) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Times Square–42nd Street station on the IRT Flushing Line has one island platform and two tracks, located deep below West 41st Street. Stairs, escalators, and an elevator along the platform lead to various mezzanines. There are "TS" tile mosaics along the station walls. An office is located at the north (compass east) end of the platform. An elevator connects with the Downtown IRT Seventh Avenue platform and then the mezzanine.
The platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platform contains I-beam columns spaced every 15 feet (4.6 m).[4]: 3–4 Large H-section columns, supporting horizontal I-beams, also support the tall ceilings of the Flushing Line station. Above the escalators, X-supports and diagonally braced lateral beams also support the ceiling. The trackside walls also contain exposed I-beam columns, dividing the trackside walls into 5 foot (1.5 m) wide panels. The panels on the trackside walls consist of white square ceramic tiles. A frieze with multicolored geometric patterns runs atop the trackside walls, and a plaque with a framed white "TS" tile is placed inside the frieze every 15 feet (4.6 m). Similar mosaics run along the bases of the trackside walls as well.[4]: 6–7
The tracks continue south (compass west) beyond the station to the 34th Street station. These tracks formerly led to an unused storage and layover area, but the extension of the Flushing Line, whose trackwork was completed in 2013, included the addition of third rails to the layover tracks, as well as the inspection and replacement of these tracks.[163] The closed lower-level platform on the IND Eighth Avenue Line was blocking the line but since removed.[65]
Artwork
George Lewis Heins and Christopher Grant LaFarge were the first commissioned architects of the IRT. They designed the original Times Square Station, which was located at the current Grand Central Shuttle stop.
In many of their stations, Heins and LaFarge use symbolic imagery to honor a neighborhood or its namesake. When Squire Vickers took over as chief designer and architect of the IRT in 1906, he continued this tradition of using symbolism to speak to a station's history.
The colored tile trim of the IRT portions of the station closely resembles the Confederate flag.[164] Scholars believe that Vickers and his colleagues unmistakably reference the symbol of the South to pay homage to New York Times owner Adolph S. Ochs. The Times had built a new headquarters directly above part of the subway station in 1904.[165] The Confederacy was a significant part of Ochs' heritage, and the eccentric Vickers relished literary and historical imagery.[166] After a 2010s movement in which Confederate monuments nationwide were removed, the Metropolitan Transportation Authority announced in August 2017 that these tiles would be replaced;[167][168] the tiles were subsequently covered with stickers.[169]
- Original colored tile trim, before the station renovation of the late 1990s
- Replica of the original trim, installed in 1998
- Times Square Mural by Roy Lichtenstein
- The Return of Spring/The Onset of Winter by Jack Beal
- The Revelers by Jane Dickson
- New York in Transit by Jacob Lawrence
- Times Square Times by Toby Buonagurio
- The Commuter's Lament by Norman B. Colp
Modern artwork installed in the complex includes the following:
- The Commuter's Lament or A Close Shave by Norman B. Colp, 1991
- New York in Transit by Jacob Lawrence, 2001
- The Return of Spring/The Onset of Winter by Jack Beal, 2001/2005
- Times Square Mural by Roy Lichtenstein, 2002 (collage 1990, fabricated 1994)
- Times Square Times: 35 Times by Toby Buonagurio, 2005
- The Revelers by Jane Dickson, 2008
New York in Transit was Lawrence's last public work before his 2000 death.[170] Lichtenstein died in 1997 before the mural could be installed; he had completed Times Square Mural in 1994, but installation was delayed until after the station complex's renovation.[171]
The Commuter's Lament is a series of signs attached to the roof of the lower passageway, inspired by classic Burma-Shave ads. In order, the signs read Overslept/So tired/If late/Get fired/Why bother?/Why the pain?/Just go home/Do it again.; The last panel is a picture of a bed. The panels were part of an art project that was supposed to last only one year, but were never removed.[172]
References
Notes
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- "Three New Links of the Dual Subway System Opened". The New York Times. June 3, 1917. p. 33. ISSN 0362-4331. Archived from the original on May 31, 2020. Retrieved April 21, 2020.
- "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
- "New York MPS Times Square–42nd Street Subway Station". Records of the National Park Service, 1785 - 2006, Series: National Register of Historic Places and National Historic Landmarks Program Records, 2013 - 2017, Box: National Register of Historic Places and National Historic Landmarks Program Records: New York, ID: 75313937. National Archives.
- "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- Dunlap, David W. (March 28, 2004). "1904-2004; Crossroads of the Whirl". The New York Times. ISSN 0362-4331. Archived from the original on August 10, 2017. Retrieved December 17, 2016.
- "600-Foot Pedestrian Tunnel, Linking Subways, Opens Today" (PDF). The New York Times. December 24, 1932. Archived from the original on June 19, 2022. Retrieved October 10, 2016.
- "Transfer Points Under Higher Fare; Board of Transportation Lists Stations and Intersections for Combined Rides". The New York Times. June 30, 1948. p. 19. ISSN 0362-4331. Archived from the original on December 9, 2021. Retrieved April 21, 2020.
- Lyall, Sarah (December 12, 1988). "All Aboard. . .Somewhere. . .for Subway Changes!". The New York Times. ISSN 0362-4331. Archived from the original on March 6, 2016. Retrieved July 24, 2016.
- Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
- "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Archived (PDF) from the original on March 27, 2016. Retrieved November 19, 2019.
- Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
- "First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street -- Power House Delays". The New York Times. November 14, 1903. ISSN 0362-4331. Archived from the original on May 5, 2022. Retrieved May 10, 2022.
- "Subway Opening To-day With Simple Ceremony – Exercises at One O'Clock – Public to be Admitted at Seven – John Hay May Be Present – Expected to Represent the Federal Government – President Roosevelt Sends Letter of Regret" (PDF). The New York Times. October 27, 1904. ISSN 0362-4331. Archived (PDF) from the original on August 30, 2021. Retrieved May 28, 2017.
- Barron, James (April 8, 2004). "100 Years Ago, an Intersection's New Name: Times Square". Archived from the original on December 24, 2015. Retrieved December 28, 2017.
- "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Archived from the original on December 23, 2021. Retrieved November 6, 2016.
- Herries, William (1916). Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. p. 119. Archived from the original on May 11, 2021. Retrieved December 24, 2020.
- Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911. Archived from the original on January 20, 2021. Retrieved January 7, 2021.
- "Money Set Aside for New Subways; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T." (PDF). The New York Times. March 19, 1913. ISSN 0362-4331. Archived (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
- "MONEY SET ASIDE FOR NEW SUBWAYS; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T." (PDF). The New York Times. March 19, 1913. ISSN 0362-4331. Archived (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
- "Open new subway to regular traffic". The New York Times. Archived from the original on December 12, 2021. Retrieved August 27, 2008.
- "Open New Subway Lines to Traffic; Called a Triumph" (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Archived (PDF) from the original on August 3, 2019. Retrieved October 4, 2011.
- Eagle, From The Brooklyn (February 8, 1914). "42D STREET AN EXPRESS STOP.; A Big Victory for Brooklynites, Says The Brooklyn Eagle". The New York Times. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved August 1, 2017.
- "Open New Subway to Times Square". The New York Times. January 6, 1918. ISSN 0362-4331. Archived from the original on July 28, 2021. Retrieved April 21, 2020.
- Rogoff, David (1960). "The Steinway Tunnels". Electric Railroads. No. 29. Electric Railroaders' Association. Archived from the original on December 10, 2019. Retrieved December 22, 2020.
- Hood, Clifton (2004). 722 Miles: The Building of the Subways and How They Transformed New York (Centennial ed.). Baltimore: Johns Hopkins University Press. pp. 163–168. ISBN 978-0-8018-8054-4. Archived from the original on April 25, 2022. Retrieved August 26, 2009.
- Burks, Edward C. (September 2, 1973). "The Ill‐Starred History Of an Old Subway Tunnel". The New York Times. ISSN 0362-4331. Archived from the original on May 4, 2022. Retrieved April 8, 2020.
- Rogoff, David (1960). "The Steinway Tunnels". Electric Railroads. No. 29. Electric Railroaders' Association. Archived from the original on December 10, 2019. Retrieved December 22, 2020.
- New Subways For New York: The Dual System of Rapid Transit Chapter 1: Dual System of Rapid Transit. New York State Public Service Commission. 1913. Archived from the original on January 11, 2021. Retrieved December 22, 2020.
- "Steinway Tunnel Will Open Today; Officials Will Attend Ceremony in the Long Island City Station at 11 A.M. First Public Train At Noon Public Service Commission Renames the Under-River Route the Queensboro Subway". The New York Times. June 22, 1915. ISSN 0362-4331. Archived from the original on April 14, 2018. Retrieved April 14, 2018.
- "Plan New Station for 42d Street; Proposed as Part of Extension of the Queensboro Subway". The New York Times. July 25, 1920. ISSN 0362-4331. Retrieved July 12, 2022.
- "Subway Station on 42d St. Between 5th and 6th Avs". New-York Tribune. July 25, 1920. p. A12. ProQuest 576244392.
- "Queensboro Tube to be Extended West: Bids for Construction of Subway Over to 8th Ave. to be Opened Wednesday; Two Years' Job". New-York Tribune. November 6, 1922. Retrieved July 12, 2022.
- "Subway Bids 0.7 P.C. Apart: Unprecedentedly Small Difference in Estimates Offered". The Brooklyn Times Union. November 28, 1921. Retrieved July 12, 2022.
- "Queensboro Subway Contract Is Awarded; $3,867,138 Bid for 42d Street Extension Let to Powers-Kennedy by Commission". The New York Times. November 23, 1921. ISSN 0362-4331. Retrieved July 12, 2022.
- "Subway Power Expense Added To 'L' Burdens: Impoverished System Forced to Foot Bills for Overhead, According to Check-Up of Interborough Transactions Hedley on Stand To-day Auditor Admits Campaign to Raise Fare Was Charged to I. R. T. Operating Cost". New-York Tribune. November 23, 1921. p. 24. ProQuest 576494810.
- "Start Work on Forty-second Street Extension; New Link Will Run From Lexington Avenue and Forty-second Street to Forty-first Street and Eighth Avenue--Contractors Promise to Rush Work and Keep Streets Clear of Obstructions as Far as Possible". The New York Times. May 14, 1922. ISSN 0362-4331. Retrieved July 12, 2022.
- "Rushing Work on New Subway: New Tunnel Opened to Point Under Library, Fifth Av. And 42d Street, Last Week". The New York Times. May 20, 1923. p. RE1. ISSN 0362-4331. ProQuest 103117644.
- "Queens Subway Extension; Crossover at Fifth Avenue Station Will Hasten Opening". The New York Times. February 1, 1923. ISSN 0362-4331. Retrieved July 12, 2022.
- "Want 42d St. Extension Operated in Sections: Need of Transit Is Too Great to Wait for Completion of Entire Tube". New-York Tribune. January 14, 1923. p. B2. ProQuest 1114723879.
- "Queens Borough Subwy.; Committees Ask That Fifth Avenue Station Be Opened". The New York Times. November 18, 1923. ISSN 0362-4331. Retrieved July 12, 2022.
- "Queens Tube Trains to 5th Av. In March; Subway Extension Completed From Grand Central to Near Sixth Avenue". The New York Times. February 21, 1926. ISSN 0362-4331. Retrieved July 10, 2022.
- "Queensboro Line 5th Ave. Stations Open in March: Tracks Now Installed Between Grand Central and Near Sixth Avenue". The New York Herald, New York Tribune. February 21, 1926. p. 8. ProQuest 1112728483.
- "Queens Subway Runs to 5th Ave. Amid Ceremony: Bryant Park Station Will Mark Terminal of New Extension Until Tunnel Is Finished to 8th Avenue". The New York Herald, New York Tribune. March 23, 1926. p. 1. ProQuest 1112743933.
- "Fifth Av. Station of Subway Opened; Ceremonies at Library Mark Completion of First Part of Queensboro Extension". The New York Times. March 23, 1926. ISSN 0362-4331. Retrieved July 10, 2022.
- Annual Report of the Interborough Rapid Transit Company For The Year Ended June 30, 1925. Interborough Rapid Transit Company. 1925. p. 4.
- "Nearly Year Late, New Station to be Open in 2 Weeks: Date for Extending Queens Subway Service to Times Square Long Delayed". The Brooklyn Times Union. March 2, 1927. Retrieved July 12, 2022.
- "Times Square Tube Station To Open Soon: Train Operation on Queensboro Line Will Begin Feb. 19". The Brooklyn Citizen. February 9, 1927. Retrieved July 12, 2022.
- "New Queens Subway Opened to Times Sq.; Service Starts at Once After a Celebration by City and Civic Leaders". The New York Times. March 15, 1927. ISSN 0362-4331. Retrieved July 10, 2022.
- State of New York Department of Public Service Metropolitan Division Transit Commission Seventh Annual Report For The Calendar Year 1927. New York State Transit Commission. 1928. p. 13.
- "Plan a New Subway on Upper West Side". The New York Times. March 3, 1918. p. 27. ISSN 0362-4331. Retrieved June 29, 2018.
- "Two Subway Routes Adopted by City". The New York Times. August 4, 1923. p. 9. ISSN 0362-4331. Retrieved June 29, 2018.
- "Plans Now Ready to Start Subways". The New York Times. March 12, 1924. p. 1. ISSN 0362-4331. Retrieved June 29, 2018.
- "Hylan Subway Plan Links Four Boroughs at $450,000,000 Cost". The New York Times. December 10, 1924. p. 1. ISSN 0362-4331. Retrieved June 29, 2018.
- Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. doi:10.5422/fordham/9780823253692.001.0001. ISBN 978-0-82325-369-2.
- "Will Break Ground Today for New Uptown Subway". The New York Times. March 14, 1925. p. 15. ISSN 0362-4331. Retrieved June 29, 2018.
- Warner, Arthur (November 22, 1931). "The City's New Underground Province; The Eighth Avenue Subway Will Be Not Only a Transit Line but a Centre for the Shopper A New Underground Province of New York The Eighth Avenue Subway Will Be a Rapid Transit Line With Innovations and Will Provide Centres for the Shoppers". The New York Times. ISSN 0362-4331. Archived from the original on May 3, 2018. Retrieved May 2, 2018.
- Transit Journal. McGraw-Hill Publishing Company, Incorporated. 1932.
- "List of the 28 Stations on the New 8th Av. Line". The New York Times. September 10, 1932. p. 6. ISSN 0362-4331. Archived from the original on December 14, 2021. Retrieved April 21, 2020.
- Crowell, Paul (September 10, 1932). "Gay Midnight Crowd Rides First Trains In The New Subway: Throngs at Station an Hour Before Time, Rush Turnstiles When Chains are Dropped" (PDF). The New York Times. Archived (PDF) from the original on September 18, 2019. Retrieved November 8, 2015.
- Transportation, New York (N Y. ) Board of (1953). Proceedings. Archived from the original on April 26, 2022. Retrieved December 5, 2020.
- "New IND Platform Will Open Monday" (PDF). The New York Times. August 23, 1952. Archived from the original on June 19, 2022. Retrieved June 30, 2015.
- Ingraham, Joseph C. (June 20, 1952). "New IND Platform at 8th and 42d To Expedite Service From Queens" (PDF). The New York Times. Archived from the original on June 19, 2022. Retrieved June 30, 2015.
- Mindlin, Alex (April 20, 2008). "No Whoosh, No 'All Aboard'". The New York Times. Archived from the original on June 19, 2022. Retrieved July 10, 2009.
- Kabak, Benjamin (April 21, 2008). "With the 7 on the way, a swan song for a Times Square platform". Archived from the original on October 27, 2020. Retrieved April 6, 2013.
- Brennan, Joseph (2002). "Abandoned Stations: 42 St Lower Level". Archived from the original on November 11, 2020. Retrieved May 4, 2015.
- "Non-Stop Trips, Reserved Seats On Special Here: Deluxe Subway Express Ride Also Features Music; $1.55 Round-Trip Fare From 42nd Street To Playland Station Provides Admission And Rides". Wave of Long Island. Fultonhistory.com. July 3, 1958. p. 1. Archived from the original on June 19, 2022. Retrieved August 17, 2016.
- Associated Press (August 25, 1928). "Hold Man in Tube Tragedy". San Jose News. p. 1.
- Associated Press (August 25, 1928). "14 Persons Killed and Over Hundred Injured in Terrible Wreck on New York Subway". Ottawa Citizen. p. 1.
- Legislature, New York (State) (1937). Legislative Document. J.B. Lyon Company. p. 15. Archived from the original on June 19, 2022. Retrieved December 5, 2021.
- "New Subway Exit for Times Square; Will Be Through Basement Concourse in Theatre to Replace Rialto". The New York Times. February 14, 1935. ISSN 0362-4331. Retrieved July 15, 2022.
- "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN 0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
- "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest 1243059209.
- "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
- "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
- Hood, Clifton (2004). 722 Miles: The Building of the Subways and How They Transformed New York (Centennial ed.). Johns Hopkins University Press. pp. 238–239. ISBN 0-8018-8054-8.
- Authority, New York City Transit (1955). Minutes and Proceedings. Archived from the original on April 21, 2022. Retrieved December 5, 2020.
- Bennett, Charles G. (June 6, 1957). "Kiosk to Subway in Times Sq. Shut; Entrance Used by 5,500 a Day Is Making Way for, City Information Center". The New York Times. ISSN 0362-4331. Retrieved July 15, 2022.
- "Times Sq. To Keep Exit for Subway; Transit Authority to Rebuild Kiosk After the Completion of Information Center". The New York Times. June 7, 1957. ISSN 0362-4331. Retrieved July 15, 2022.
- "Entrance to Subway in Times Square Is Reopened". The New York Times. July 4, 1958. ISSN 0362-4331. Retrieved July 15, 2022.
- "Times Sq. Subway Arcade Shut, Making a Belated End of Stores". The New York Times. July 2, 1967. ISSN 0362-4331. Retrieved July 15, 2022.
- Goldman, Ari L. (February 5, 1983). "Crime in Subway Station Rises in Spite of TV Monitors". The New York Times. ISSN 0362-4331. Archived from the original on April 25, 2022. Retrieved July 2, 2022.
- Carmody, Deirdre (October 4, 1985). "Subway Anticrime TV Test Abandoned". The New York Times. ISSN 0362-4331. Archived from the original on November 24, 2017. Retrieved July 2, 2022.
- Gordy, Margaret (October 14, 1985). "TA Aim: Make Subways Unsafe For Muggers: Will Spend $22M To Upgrade Safety". Newsday. pp. 3, 19.
- Hirsch, James (July 30, 1988). "Authority to Begin Free-Transfer Policy In Times Sq. Station". The New York Times. ISSN 0362-4331. Retrieved July 15, 2022.
- Lueck, Thomas J. (February 14, 1988). "The Region: Redevelopment; Times Square Plan Takes A Shaky Step Forward". The New York Times. ISSN 0362-4331. Archived from the original on September 17, 2021. Retrieved September 17, 2021.
- Johnson, Kirk (June 18, 1988). "Crossroads for Times Square Subway: Is Tidier Better?". The New York Times. ISSN 0362-4331. Archived from the original on June 19, 2022. Retrieved September 25, 2021.
- Silverman, Edward R. (August 24, 1992). "TA Sent Back To (Times) Square 1". Newsday. p. 25. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Levy, Clifford J. (August 23, 1992). "Times Sq. Subway Station Plan Is Canceled". The New York Times. ISSN 0362-4331. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Lambert, Bruce (December 10, 1995). "Neighborhood Report: Midtowm;Times Square Subway Station: Putting a There There". The New York Times. ISSN 0362-4331. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Ramirez, Anthony (April 28, 1996). "Neighborhood Report: Times Square; Subway Plan For Times Sq. Reduces Exits". The New York Times. ISSN 0362-4331. Retrieved July 15, 2022.
- MacFarquhar, Neil (July 16, 1997). "Times Sq. Entrance Opens Up the Underground". The New York Times. ISSN 0362-4331. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Firestone, David (July 16, 1998). "Subway Station to Be Renovated, Keeping Pace With Times Square". The New York Times. ISSN 0362-4331. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Review and photos of the Times Square bathrooms Archived March 17, 2006, at the Wayback Machine at Gothamist
- Young, Michelle (June 10, 2020). "Closed: Record Mart, Manhattan's Oldest Record Store Located in Times Square Subway Station". Untapped New York. Archived from the original on June 10, 2020. Retrieved June 10, 2020.
- Bagli, Charles V. (May 14, 1998). "Retreat on Times Square Subway Plan". The New York Times. ISSN 0362-4331. Archived from the original on September 25, 2021. Retrieved September 25, 2021.
- Donohue, Pete (June 20, 2009). "Abandoned No More: 2nd Life Drilled into Old 7 Subway Platform". Daily News. New York. Archived from the original on June 23, 2009. Retrieved January 30, 2010.
- "7 Line Extension 081". Flickr. December 20, 2013. Archived from the original on February 8, 2015. Retrieved January 20, 2017.
- "New 34 St-Hudson Yards 7 Station Opens". Building for the Future. New York, New York: Metropolitan Transit Authority. Archived from the original on March 4, 2016. Retrieved March 10, 2016.
The new station opened September 13, 2015
- "7 subway service is now running to/from the new 34 St-Hudson Yards station. Times Sq-42 St is no longer the Manhattan terminal. At Times Sq-42 St, Queens-bound express and local service leave from Track 2 only". mta.info. Metropolitan Transportation Authority. September 2015. Archived from the original on September 15, 2020. Retrieved December 18, 2016.
- Gold, Michael (February 23, 2022). "Subway Will Test Platform Doors at 3 Stations". The New York Times. ISSN 0362-4331. Archived from the original on February 23, 2022. Retrieved February 23, 2022.
- Brosnan, Erica (February 23, 2022). "MTA: Platform barrier pilot program to launch in three stations". Spectrum News NY1 | New York City. Archived from the original on February 23, 2022. Retrieved February 23, 2022.
- "MTA Opens Door to Platform Barriers in Three Subway Stations". The City. July 15, 2022. Retrieved October 6, 2022.
- "Project Details: Platform Screen Doors (PSD) Pilot: 3 Stations". MTA. Retrieved October 6, 2022.
- "Transit and Bus Committee December 2016" (PDF). mta.info. Metropolitan Transportation Authority. February 21, 2017. p. 199. Archived from the original (PDF) on February 22, 2017. Retrieved February 21, 2017.
- "METROPOLITAN TRANSPORTATION AUTHORITY (MTA) NOTICE OF PUBLIC HEARING AND DESCRIPTION OF PROJECTS Tuesday, August 23, 2016 4:30 P.M. Request for Federal Financial Assistance Under the Federal Transportation Authorization For Federal Fiscal Year 2017 Capital Improvement Projects" (PDF). mta.info. Metropolitan Transportation Authority. July 28, 2016. Archived from the original (PDF) on July 28, 2017. Retrieved August 7, 2016.
- "MTA Capital Program 2015-2019" (PDF). mta.info. Metropolitan Transportation Authority. October 28, 2015. Archived (PDF) from the original on November 17, 2015. Retrieved December 17, 2016.
- "T7041404 Reconstruction of Times Square Shuttle - Phase 3". web.mta.info. Metropolitan Transportation Authority. Archived from the original on September 3, 2017. Retrieved September 3, 2017.
- "MTA to Transform 42 St Shuttle to Provide Better Service, Fully Accessible Crosstown Transit Connection". mta.info. Metropolitan Transportation Authority. August 2, 2019. Archived from the original on August 2, 2019. Retrieved August 2, 2019.
- "MTA Celebrates Unveiling of New Accessible Entrance at 42 St-Times Square Subway Station". mta.info. Metropolitan Transportation Authority. May 16, 2022. Archived from the original on May 16, 2022. Retrieved May 18, 2022.
- "Amendment to the Memorandum of Agreement Between Federal Transit Administration New York State Historic Preservation Office New York City Transit Authority Regarding The Times Square Shuttle Station During Contract A-35302, The Reconfiguration of the Times Square Shuttle Station, SHPO Project #17PR00545" (PDF). mta.info. Metropolitan Transportation Authority. April 25, 2018. Archived (PDF) from the original on April 25, 2018. Retrieved April 27, 2018.
- "Capital Program Oversight Committee Meeting - September 2018" (PDF). mta.info. Metropolitan Transportation Authority. September 24, 2018. p. 73. Archived (PDF) from the original on September 23, 2018. Retrieved September 23, 2018.
- "Capital Program Oversight Committee Meeting - March 2019" (PDF). mta.info. Metropolitan Transportation Authority. March 25, 2019. p. 11. Archived (PDF) from the original on January 10, 2021. Retrieved September 23, 2018.
- Hu, Winnie; Goldbaum, Christina (June 5, 2020). "With Fewer People in the Way, Transportation Projects Speed Ahead". The New York Times. ISSN 0362-4331. Archived from the original on June 5, 2020. Retrieved June 5, 2020.
- Davenport, Emily (September 10, 2021). "MTA unveils update shuttle from Grand Central to Times Square and new campaign welcoming back riders". amNewYork. Archived from the original on September 10, 2021. Retrieved September 10, 2021.
- Guse, Clayton (September 8, 2021). "MTA opens new walkway between Times Square and Bryant Park subway stations, revamped shuttle platforms". New York Daily News. Archived from the original on September 9, 2021. Retrieved September 9, 2021.
- Nessen, Stephen (May 17, 2022). "New Times Square subway entrance includes an elevator — and the largest mosaic in the system". gothamist.com. Archived from the original on May 18, 2022. Retrieved May 18, 2022.
- "MTA unveils new Times Square subway entrance". ABC7 New York. May 16, 2022. Archived from the original on May 17, 2022. Retrieved May 19, 2022.
- Zraik, Karen; Johnston, David (September 15, 2009). "Man in Queens Raids Denies Any Terrorist Link". The New York Times. Archived from the original on March 6, 2014. Retrieved February 20, 2017.
- Griggs, Troy; Lai, K.K. Rebecca; Wallace, Tim (December 11, 2017). "Where the Port Authority Subway Explosion Happened". The New York Times. Archived from the original on December 11, 2017. Retrieved December 12, 2017.
- McKendry, Joe (2011). One Times Square: A Century of Change at the Crossroads of the World. David R. Godine Publisher. pp. 10–14. ISBN 9781567923643. Archived from the original on October 10, 2017. Retrieved September 17, 2020.
- Crump, William D. (2014). Encyclopedia of New Year's Holidays Worldwide. McFarland. p. 242. ISBN 9781476607481. Archived from the original on June 19, 2022. Retrieved September 17, 2020.
- nycsubway.org – IND 8th Avenue: 42nd Street-Port Authority Bus Terminal
- "MTA Accessible Stations". MTA. May 20, 2022. Retrieved July 5, 2022.
- "MTA Neighborhood Maps: Times Sq-42 St (1)(2)(3)". Metropolitan Transportation Authority. 2018. Archived from the original on August 29, 2021. Retrieved December 25, 2020.
- "New York City Transit Authority Public Hearing on Proposed Token Booth and/or Entrance Closing Boroughs of Manhattan and Brooklyn". Daily News. New York. June 8, 1981. Archived from the original on June 19, 2022. Retrieved February 22, 2019.
- "1940s NYC | Street photos of every building in New York City in 1939/1940". 1940s.nyc. Archived from the original on June 19, 2022. Retrieved August 28, 2020.
- New York City Transit Authority Committee Agenda January 1989. New York City Transit Authority. January 20, 1989. pp. K-8, K-9, K-10.
- Ramirez, Anthony (April 28, 1996). "Neighborhood Report: Times Square; Subway Plan For Times Sq. Reduces Exits". The New York Times. ISSN 0362-4331. Archived from the original on June 19, 2022. Retrieved February 24, 2019.
- NYC Transit Committee Agenda November 1995. New York City Transit. November 14, 1995. pp. D.30, D.37, D.38, D.39.
- "42nd Street Shuttle ADA, State of Good Repair, and Capacity Enhancement Project & Grand Central Station Elevator and Escalator Replacements" (PDF). cbsix.org. Metropolitan Transportation Authority. May 30, 2019. Archived from the original (PDF) on August 19, 2019. Retrieved June 14, 2019.
- "MTA to Transform 42 St Shuttle to Provide Better Service, Fully Accessible Crosstown Transit Connection". mta.info. Metropolitan Transportation Authority. August 2, 2019. Archived from the original on August 2, 2019. Retrieved August 2, 2019.
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Archived from the original on November 12, 2020. Retrieved April 21, 2020.
- Appendices to the Report of the Royal Commission on London Traffic with Index Presented to both Houses of Parliament by Command of His Majesty. Royal Commission on London Traffic. 1906. Archived from the original on October 15, 2021. Retrieved September 10, 2021.
- Williams, Keith (November 1, 2017). "Midtown's Mysterious Unused Shuttle Track". The New York Times. ISSN 0362-4331. Archived from the original on June 19, 2022. Retrieved September 7, 2021.
- "A New Phase Begins for the Shuttle". us18.campaign-archive.com. Metropolitan Transportation Authority. October 30, 2020. Archived from the original on November 10, 2020. Retrieved November 10, 2020.
- Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - Yakas, Ben (September 8, 2021). "Photos: Nick Cave's Mosaics Grace New 42nd Street Shuttle Connector". Gothamist. Archived from the original on September 10, 2021. Retrieved September 10, 2021.
- Zornosa, Laura (September 6, 2021). "Nick Cave Digs Deep, With a Symphony in Glass". The New York Times. ISSN 0362-4331. Archived from the original on June 19, 2022. Retrieved September 7, 2021.
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC 1056711733.
- "N Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "Q Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "R Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "W Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- "1 Subway Timetable, Effective December 19, 2021". Metropolitan Transportation Authority. Retrieved February 3, 2022.
- "2 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "3 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "Service Enhancements on 3 Line" (Press release). MTA New York City Transit. July 24, 2008. Archived from the original on December 29, 2008. Retrieved July 26, 2008.
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- "A Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "E Subway Timetable, Effective November 8, 2020". Metropolitan Transportation Authority. Retrieved December 9, 2020.
- "C Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 1, 2022.
- "MTA Neighborhood Maps: Pennsylvania Station/Times Square" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Archived (PDF) from the original on September 14, 2020. Retrieved December 11, 2015.
- "Station: 42nd Street-Port Authority Bus Terminal (8th Avenue)". Archived from the original on October 9, 2015. Retrieved April 6, 2013.
- Daly, William Jerome (February 5, 1928). "New Subway Work Far Advanced, From the Circle to 207th Street: Small Section Near St. Nicholas Avenue and 148th Street Being Constructed". New York Herald Tribune. p. B1. ProQuest 1113431484.
- "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- "New Queens Subway Opened to Times Sq". The New York Times. March 15, 1927. p. 1. ISSN 0362-4331. Archived from the original on August 14, 2019. Retrieved April 21, 2020.
- "View of Tunnel from station platform showing sign indicating no third rail power". Archived from the original on March 13, 2009. Retrieved April 1, 2009.
- "Confederate Flags in Times Square?". History Net: Where History Comes Alive – World & US History Online. May 22, 2012. Archived from the original on August 27, 2013. Retrieved August 28, 2013.
- Jackowe, David J. "The Times Square Confederate." Civil War Times; Aug 2012, Vol. 51 Issue 4, p. 42. http://www.historynet.com/confederate-flags-in-times-square.htm Archived August 27, 2013, at the Wayback Machine
- Kennedy, Randy (August 3, 2007). "Underground Renaissance Man: Watch the Aesthetic Walls, Please". The New York Times. Archived from the original on June 19, 2022. Retrieved February 20, 2017.
- Plitt, Amy (August 18, 2017). "MTA will modify Times Square subway tile resembling a Confederate flag". Curbed NY. Archived from the original on September 9, 2017. Retrieved August 31, 2017.
- Stevens, Matt (August 18, 2017). "M.T.A. to Modify Subway Station Design Resembling Confederate Flag". The New York Times. ISSN 0362-4331. Archived from the original on June 19, 2022. Retrieved August 31, 2017.
- "Subway tiles that looked like Confederate flags in Times Square covered with stickers". amNewYork. August 24, 2017. Archived from the original on September 15, 2020. Retrieved April 18, 2020.
- "Times Square Subway Mural Unveiled" (Press release). Metropolitan Transportation Authority. November 7, 2001. Archived from the original on June 5, 2011. Retrieved April 11, 2010.
- Carol Vogel. "Times Square Mural". The Roy Lichtenstein Foundation. Archived from the original on February 1, 2010. Retrieved April 11, 2010.
- "Artwork: "The Commuter's Lament/A Close Shave", Norman B. Colp (1991)". Archived from the original on January 24, 2021. Retrieved October 22, 2008.
External links
- nycsubway.org – IRT Grand Central/Times Square Shuttle: Times Square
- nycsubway.org – IRT Flushing Line: Times Square
- nycsubway.org – IRT West Side Line: Times Square/42nd Street (text used with permission)
- nycsubway.org – BMT Broadway Subway: Times Square/42nd Street
- nycsubway.org – IND Eighth Avenue Line: 42nd Street/Port Authority Bus Terminal
- MTA's Arts For Transit – 42nd Street–Port Authority Bus Terminal (IND Eighth Avenue Line)