Alewife Brook Parkway

Alewife Brook Parkway is a short parkway in Cambridge and Somerville, Massachusetts. It is listed on the National Register of Historic Places. It begins at Fresh Pond in Cambridge (linking to Fresh Pond Parkway via Concord Avenue), and heads north on the east bank of Alewife Brook, crossing into West Somerville and ending at the Mystic River on the Medford town line, where it becomes Mystic Valley Parkway. The entire length of Alewife Brook Parkway is designated as part of Massachusetts Route 16 (Route 16), while the southernmost sections are also designated as part of Route 2 and U.S. Route 3 (US 3). It is managed by the Department of Conservation and Recreation with the Massachusetts Department of Transportation responsible for bridge maintenance.

Alewife Brook Parkway

U.S. Route 3 marker

Route 2 marker

Route 16 marker

Map of Middlesex County in eastern Massachusetts with Alewife Brook Parkway highlighted in red
Map of Middlesex County in eastern Massachusetts with Alewife Brook Parkway highlighted in red
Maintained byDepartment of Conservation and Recreation and MassDOT
Length2.05 mi (3.30 km)[1]
LocationAlewife Brook Reservation, Middlesex County, Massachusetts
South end US 3 / Route 2 / Route 16 in Cambridge
North end Route 16 / Mystic Valley Parkway in Somerville
Construction
Completion1916
Alewife Brook Parkway
The parkway at Powder House Boulevard in Somerville
Alewife Brook Parkway is located in Massachusetts
Alewife Brook Parkway
Alewife Brook Parkway is located in the United States
Alewife Brook Parkway
LocationCambridge and Somerville, Massachusetts
Built1908
ArchitectCharles Eliot; Olmsted Brothers
MPSMetropolitan Park System of Greater Boston MPS
NRHP reference No.04000249[2]
Added to NRHPMarch 18, 2004

Route description

The southern terminus of the parkway is the westernmost of the two Fresh Pond rotaries, with Concord Avenue connecting the parkway to Fresh Pond Parkway at the eastern rotary. The road is designated Massachusetts Routes 2 (northbound) and 16 (eastbound), and US Route 3 (northbound). The parkway runs roughly north, skirting just east of the Alewife T station to a large intersection (formerly a rotary), where the limited access highway carrying Route 2 to the west begins. The parkway runs north from this intersection, paralleling just east of the course of Alewife Brook, which forms the western boundary of Cambridge with Arlington. The first major intersection is with Massachusetts Avenue, which carries Massachusetts Route 2A eastward toward Porter Square, and Routes 2A and 3 westward into Arlington. The parkway continues to parallel Alewife Brook as it heads north into Somerville. After crossing Broadway, the parkway passes through a rotary-like interchange with Powder House Boulevard. It then passes Dilboy Stadium, on the left, and reaches its northern terminus at a small rotary near where Alewife Brook empties into the Mystic River. There it meets Mystic Valley Parkway, which runs from Arlington just to the west to Medford to the northeast. The Route 16 designation continues northeast. The parkway's total length is just over two miles (about three kilometers).

History

The parkway, with the surrounding Alewife Brook Reservation (115 acres (47 ha)), forms part of the Metropolitan Park System of Greater Boston, established in 1893. It was originally planned by landscape architect Charles Eliot as one section of a web of pleasure roads designed for their aesthetics. Nearby Alewife Brook was straightened and channelized between 1909 and 1912, and construction of the parkway was completed by 1916. Landscaping was performed by the famed Olmsted Brothers firm. Route 2 connected to Alewife Brook Parkway as a highway in the present right-of-way at some point before 1937.[3]

A drive-in theater was built in 1950, replaced by the Fresh Pond Shopping Center in 1962.[4] The current indoor movie theater next to the shopping center was added in 1964.[4]

Along the southern end, Alewife Brook Parkway underwent further changes beginning in the late 1980s, including a new four lane overpass spanning the Fitchburg Line,[5][6] new dedicated shoulder turning-lanes for exiting and entering the shopping centers, enlarged roundabouts with obstructive center trees removed, new raised grassy medians down the center of the parkway, and new trees, light poles, and bike lanes integrated into the sidewalks. Some of the other amenities integrated in the new design included accessible ramps and stairs on the northbound side of the bridge leading to the Rindge Towers, new sidewalk access to Alewife station, Alewife Linear Park, bike trail adjacent to Jerry's Pond, and a dedicated road for large trucks to service the shopping areas by passing below the overpass.[7]

As traffic has grown over the past century, the original aesthetics of the parkway's southernmost sections have been largely lost. It is now a section of the principal route between the northwestern suburbs and Boston on the other, and consequently carries a large volume of commuter traffic. The Alewife MBTA station is a prominent feature on the parkway, and there are shopping centers, parking lots, and office and apartment buildings lining the parkway between Alewife station and the southern terminus.

Major intersections

The entire route is in Middlesex County.

Locationmi[8]kmDestinationsNotes
Cambridge0.00.0


Route 2 east / Route 16 west / US 3 south / Concord Avenue Boston, Belmont
Traffic circle; all routes continue south
0.71.1
Route 2 west Concord
Route 2 continues west
1.11.8
Route 2A / US 3 west (Massachusetts Avenue) Winchester, Lexington, Cambridge
US 3 continues north
Somerville2.13.4
Route 16 east / Mystic Valley Parkway west Arlington, Medford, Revere
Traffic circle; Route 16 continues along Mystic Valley Parkway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Route transition

See also

References

  1. Executive Office of Transportation - Office of Transportation Planning Roads - June 2008
  2. "National Register Information System". National Register of Historic Places. National Park Service. January 23, 2007.
  3. Imageschlichtman.org Archived May 17, 2011, at the Wayback Machine
  4. A Brief Chronology of Fresh Pond
  5. Palmer Jr., Thomas C. (August 27, 1993). "Ground finally broken for $10.7m Alewife Brook bridge". Boston Globe. p. 27 via Newspapers.com. open access
  6. Rosenberg, Ronald (April 22, 1990). "Panel Tables Bill To Scale Back Route 2 Project". Boston Globe. p. 72 via Newspapers.com. open access
  7. "A Cambridge Compromise". Boston Globe. July 1, 1989 via Newspapers.com. open access
  8. Google (May 25, 2019). "Alewife Brook Parkway" (Map). Google Maps. Google. Retrieved May 25, 2019.
Template:Attached KML/Alewife Brook Parkway
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.