Ayrılık Çeşmesi (Istanbul Metro)

Ayrılık Çeşmesi is an underground station on the M4 line of the Istanbul Metro.[2] It was opened on 29 October 2013 to provide a connection to the Marmaray station and trains crossing the Bosphorus, a year after the rest of the line's first stage (which opened on 17 August 2012). Ayrılık Çeşmesi has an island platform serviced by two tracks.

Ayrılık Çeşmesi
Istanbul Metro
Istanbul Metro rapid transit station
General information
Coordinates41.000371°N 29.029972°E / 41.000371; 29.029972
Owned byIstanbul Metro
Line(s)Line M4 M4
Platforms1 island platform
Tracks2
ConnectionsRail transport TCDD Taşımacılık:
Marmaray Marmaray at Ayrılık Çeşmesi
Construction
Structure typeUnderground
Depth28 m (92 ft)
AccessibleYes
History
Opened29 October 2013[1]
Electrified1,500 V DC Overhead line
Services
Preceding station Istanbul Metro Following station
Kadıköy
Terminus
M4 Line Acıbadem
towards Tavşantepe

Station Layout

P
Platform level
Westbound Line M4 toward Kadıköy
Island platform, doors will open on the left
Eastbound Line M4 toward Sabiha Gökçen Airport

References

  1. "M4 Kadıköy-Kartal Metro Hattı". Istanbul Ulaşım. Archived from the original on 2015-04-23.
  2. "Istanbul Metro Map". Turkey Travel Planner. Retrieved 2019-11-02.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.