British Rail Class 701
The British Rail Class 701 Aventra is a class of electric multiple unit passenger train being built for South Western Railway (SWR) by Bombardier Transportation (now Alstom) at Derby Litchurch Lane Works. Built on the Aventra platform, they are branded as Arterio trains by SWR, and will operate services on the Reading, Windsor and South West London suburban lines.
British Rail Class 701 Aventra | |
---|---|
In service | Planned for December 2023[1] |
Manufacturer | |
Built at | Derby Litchurch Lane Works |
Family name | Aventra |
Replaced | |
Constructed | 2019–present |
Number under construction | 66 |
Number built | 68 (as of July 2023)[3] |
Formation |
|
Fleet numbers |
|
Capacity |
|
Operator(s) | South Western Railway |
Depot(s) | |
Line(s) served | |
Specifications | |
Doors |
|
Maximum speed | 100 mph (160 km/h) |
Acceleration | 0.7 m/s2 (2.3 ft/s2)[4] |
Deceleration | 0.9 m/s2 (3.0 ft/s2) |
Electric system(s) | 750 V DC third rail |
Current collector(s) | Contact shoe |
Braking system(s) | Electro-pneumatic (disc) and rheostatic/regenerative[4] |
Safety system(s) | |
Coupling system | Dellner |
Multiple working | Within subclass /5 only[5][6] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Ordered in 2017, the trains were due to enter service in mid-2019, however several delays have prevented this, with passenger service currently planned for late 2023. As of October 2023, 47 units had been accepted by SWR.[7] They will eventually allow the withdrawal of SWR's fleets of Class 455 units and the cascade of the Class 458 fleet to longer-distance services.
History
Background
In March 2017, SWR was awarded the South Western franchise with a commitment to introduce 750 new carriages.[8][9][10][11] In June 2017, SWR awarded a contract to Bombardier Transportation for 90 Aventra DC EMUs, with 60 ten-car and 30 five-car trains to be introduced from mid 2019 at a cost of £895 million.[12][13] There was an option to purchase a further five ten-car units if required by October 2020.[14] The units will be maintained at Wimbledon depot and the new Feltham depot.
The new trains will eventually replace all of SWR's suburban fleets, which at the time of the order comprised Classes 455, 456, 458, and 707,[15][12] increasing peak capacity on suburban routes into London Waterloo by 46%.[16][note 1] Original plans called for the rollout of the full Class 701 fleet to take two years after the first units entered service.[18]
The order was initially split into two separate classes, with five-car units placed in Class 705 and ten-car units placed in Class 711, but this was later changed to place ten-car units in Class 701 subclass /0 and five-car units in subclass /5.[4]
Construction and delays
Following a brief halt to production in March 2020 as a result of the COVID-19 pandemic,[19] the first completed ten-car unit (number 701002) was delivered to Eastleigh Works on 10 June 2020 so that the testing and certification processes could commence.[20] At this point entry into service was already more than five months late.[21] By June 2021, only 19 units had been delivered, none of which had been formally accepted by SWR.[20][22]
In January 2022, SWR announced that continued delays to the Class 701 introduction had "created a challenging situation" on its suburban network, and that it was still waiting for Alstom (which acquired Bombardier Transportation in January 2021) to "supply a train that performs to specification". This caused SWR to extend the lease on its remaining 12 Class 707 units until late 2022, which in turn delayed their planned transfer to Southeastern.[23]
Railway industry journalist Roger Ford observed that the programme now met the "ultimate standard for lateness", given that none of the finished units had yet been accepted by SWR and at least 280 vehicles had not yet even been built—while the original contract specified that the entire fleet was to be in service by the end of 2021.[22] He noted that the delay was, in part, due to "endemic software issues" that had affected the introduction of all Aventra fleets to date.[22] Other issues include complaints from driver's union ASLEF that the cab environment in the production units differs unacceptably from the standard previously agreed with SWR, and a high level of manufacturing defects in the finished vehicles.[24][25]
SWR's Business Plan for 2022–2023, published in July 2022, acknowledged that "continuing problems ... have prevented the start of driver training and delayed the programme of train acceptance", and included a commitment to "introduce the new Arterio fleet as soon as possible". This will involve SWR agreeing on new roll-out milestones for the project with the Department for Transport.[26][25]
A further update in December 2022 stated that SWR had by then formally accepted 24 finished units and repeated the commitment to introduce the fleet into service "as early in [2023] as possible", though a concurrent statement from the Department for Transport indicated that work to finalise a service-standard software package for the trains was still underway and that driver training had not yet commenced.[27]
In June 2023 it was reported that South Western Railway had formally accepted 42 finished units and that training for depot drivers had begun.[28]
In September 2023 it was reported that South Western Railway had accepted 47 finished units and that training for mainline driver was being prepared.[29]
Planned entry into service
In May 2023 it was announced that entry into service was now planned for December 2023.[1]
Features
The Class 701 features regenerative braking, wide gangways between coaches, wide doors for ease and efficiency of boarding and alighting, 2+2 seating arrangement throughout, Wi-Fi, at-seat USB charging points, real-time passenger information screens, air conditioning, bicycle spaces (three for each five coaches),[2] and accessible toilets for disabled passengers (one in each five coaches).[2] SWR will also provide a complimentary entertainment service called "SWR|Stream" for passengers with devices connected to the onboard Wi-Fi.[12]
Each five-car train has 274 seats with room for 361 standing passengers, while a ten-car set will seat 556 passengers with space for 746 standing.[16] The trains also feature external door cameras, and monitors within the cab, to allow for driver-controlled operation (where the driver is responsible for the opening and closing of passenger doors).[30]
Fleet details
Subclass | Operator | Qty. | Year built | Cars per unit | Unit nos. | Formation |
---|---|---|---|---|---|---|
701/0 | South Western Railway | 60 | 2019–pres. | 10 | 701001–701060 | DM-(P)M-TLW-M-EM-EM-M-TLW-(P)M-DM[5] |
701/5 | 30 | 5 | 701501–701530 | DM-M-TLW-(P)M-DM[5] |
Vehicle numbering
Individual vehicles are numbered in the ranges as follows, with the last two digits of each vehicle number matching those of the unit to which the vehicle belongs:
Vehicle Detail |
DM | (P)M | TLW | M | EM | EM | M | TLW | (P)M | DM |
---|---|---|---|---|---|---|---|---|---|---|
Diagram[note 2] | EL247 | ER249 | EQ211 | ER247 | ER246 | ER247 | EQ211 | ER249 | EL247 | |
Number range | 480001–480060 | 481001–481060 | 482001–482060 | 483001–483060 | 484001–484060 | 485001–485060 | 486001–486060 | 487001–487060 | 488001–488060 | 489001–489060 |
Vehicle Detail |
DM | M | TLW | (P)M | DM |
---|---|---|---|---|---|
Diagram[note 2] | EL247 | ER247 | EQ211 | ER249 | EL247 |
Number range | 480101–480130 | 481101–481130 | 482101–482130 | 483101–483130 | 484101–484130 |
European Vehicle Numbers for the fleet are devised by prefixing the domestic vehicle number with type code 94, country code 70, and a leading zero; thus "94700...".[5]
Illustration
Notes
- Subsequent delays to the Class 701 programme, and changes to service requirements as a result of the COVID-19 pandemic, led to the Class 456 fleet instead being withdrawn without replacement in January 2022.[17]
- Units 701001 and 701501–701502 were additionally authorised for dual-voltage operation, and have DM and (P)M vehicles described by variant diagrams EL248 and ER248 respectively.[5]
References
- Pickering, Graeme (May 2023). "December start date for SWR 'Arterios'". Track Record. The Railway Magazine. No. 1466. Horncastle: Mortons Media Group. p. 90. ISSN 0033-8923.
- "Arterio Our new fleet to transform suburban travel". South Western Railway. Retrieved 12 February 2023.
- "Training starts on heavily delayed SWR Arterios". Rail Magazine. No. 987. 12 July 2023. pp. 22–23.
- "SWR Unveils '701'". Modern Railways. Stamford: Key Publishing. 24 December 2019. Retrieved 18 January 2022.
- Fletcher, Steve (1 October 2020). "The Railways (Interoperability) Regulations 2011, as amended – Authorisation of Class 701/0 and 701/5" (PDF). Letter to Paul Carter (Bombardier Transportation UK Ltd). London: Office of Rail and Road. UK/51/2020/0054. Archived (PDF) from the original on 4 November 2020. Retrieved 18 January 2022.
- Fletcher, Steve (28 June 2021). "The Railways (Interoperability) Regulations 2011, as amended – Authorisation of Cl 701/5 Aventra (DC & DV) upgrade for multiple unit operation" (PDF). Letter to Franco Cataldo (Bombardier Transportation UK Ltd t/a Alstom). London: Office of Rail and Road. UK/51/2021/0044. Archived (PDF) from the original on 6 July 2021. Retrieved 3 March 2023.
- @SW_Help (13 October 2023). "Tweet from SWR" (Tweet). Retrieved 18 October 2023 – via Twitter.
We have now accepted 47 units…
- "First, MTR beat Stagecoach to win South West Trains". Railnews. 27 March 2017. Retrieved 23 August 2017.
- "RMT slams 'crazy' First MTR decision to drop new £200m SWT trains". Rail Technology Magazine. Manchester: Cognitive Publishing. 31 March 2017. Archived from the original on 2 June 2017. Retrieved 23 August 2017.
- Clifton, Paul (30 March 2017). "New trains 'dumped' by South Western franchise winner". BBC News. British Broadcasting Corporation. Retrieved 23 August 2017.
- Clinnick, Richard (6 September 2017). "Class 707s enter traffic with South Western Railway". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 7 September 2017.
- "Bombardier to supply 750 EMU cars for South Western franchise". Railway Gazette International. Sutton: DVV Media International. 20 June 2017. Archived from the original on 4 July 2020. Retrieved 23 August 2017.
- "First, MTR unveil new trains for South Western". Wellingborough: Railnews. 20 June 2017. Retrieved 23 August 2017.
- "Option enables SWR to expand Class 701 fleet". Rail Business UK. Sutton: DVV Media International. 17 July 2020. Retrieved 6 August 2020.
- Clinnick, Richard (20 June 2017). "Bombardier wins South Western Aventra contract". Rail Magazine. Peterborough: Bauer Consumer Media. Retrieved 23 August 2017.
- Briginshaw, David (11 June 2020). "South Western Railway receives first class 701 Bombardier Aventra EMU". International Railway Journal. Falmouth: Simmons-Boardman Publishing. Retrieved 14 July 2020.
- "SWR withdraws '456s' following service cuts". Rail Magazine. No. 949. Peterborough: Bauer Consumer Media. 26 January 2022. pp. 10–11.
- "Arterio - Our new fleet to transform suburban travel". South Western Railway. London: First MTR South Western Trains. Archived from the original on 9 October 2022. Retrieved 9 October 2022.
- "Bombardier to resume some operations in UK". Reuters. 14 April 2020. Retrieved 15 April 2020.
- "SWR Class 701 Deliveries". Rail Record. 12 June 2020. Retrieved 14 October 2020.
- "South Western Railway's £895 million Aventra unveiled - but entry delayed to 2020". Rail Magazine. No. 893. Peterborough: Bauer Consumer Media. 11 November 2019. Archived from the original on 27 November 2019.
- Ford, Roger (27 January 2022). "Operators face ongoing new train woes". Modern Railways. Stamford: Key Publishing. Retrieved 9 October 2022.
- "SWR retains 12 Class 707 trains in boost to fleet availability". South Western Railway. London: First MTR South Western Trains. 11 January 2022. Retrieved 18 January 2022.
- Clifton, Paul (3 November 2021). "Rolling stock concerns as '701s' "not fit for purpose"". Rail Magazine. No. 943. Peterborough: Bauer Consumer Media. p. 21.
- "SWR to agree fresh milestones for Class 701 EMU introduction". Rail Business UK. Sutton: DVV Media International. 25 July 2022. Retrieved 9 October 2022.
- South Western Railway (18 July 2022). South Western Railway 2022/23 Business Plan (PDF). London: First MTR South Western Trains. p. 7. Retrieved 9 October 2022.
- "First of £1bn trains to run in 2023, South Western Railway says". BBC News. British Broadcasting Corporation. 13 December 2022. Retrieved 13 December 2022.
- "Depot drivers trained on SWR '701s'". Modern Railways. No. 898. July 2023. p. 88.
- "Optimism on Aventra debuts". Modern Railways. No. 901. October 2023. p. 86.
- Holden, Michael; Thompson, Doug; Glasscock, Jan (August 2018). South Western Railway Performance Review (PDF). Woking: Coledale Consulting. Retrieved 29 June 2021.