Bucharest Metro Line M6

M6 is an under construction metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station (Gara de Nord) to Henri Coandă International Airport (Aeroport Otopeni). The line is expected to be completed by 2027.[1][2] As of 2019, only the section from 1 Mai to Tokyo has secured funding.[3] On March 8, 2022 the contract for construction was signed; he contract for the second section from Tokyo to the airport was signed on May 2, 2023.

Line M6
Aeroportul Otopeni
Henri Coandă International Airport
Ion I.C. Brătianu
Otopeni
Bruxelles
Paris
Washington
Tokyo
Aeroportul Băneasa
Aurel Vlaicu International Airport
Gara Băneasa
Băneasa railway station
Piața Montreal
Expoziției
Pajura
1 Mai
Grivița
Basarab
Mainline rail interchange
Gara de Nord
Mainline rail interchange

Cost

The construction of the new line is estimated to cost around 1.2 billion. The Japan Bank for International Cooperation is financing the project with €300 million.[4]

Stations

The M6 Line will have a total of 12 stations: 1 station shared with the existing M4 Line and 11 planned new stations: Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.[2]

PhaseTerminalsLengthTotal stationsConstruction sinceOpening
IGara de Nord-1 Mai3.6 km (2.2 mi)419892000
II1 Mai - Tokyo6.6 km (4.1 mi)62022[5]2027 (est.)
IIIWashington - Aeroport Otopeni7.6 km (4.7 mi)620232027[6] (est.)

References