Changi Airport MRT station
Changi Airport MRT station is an underground Mass Rapid Transit (MRT) station serving Changi Airport and its supplementary structure Jewel in Changi, Singapore. It is the terminus of the Changi Airport branch of the East West line (EWL). The station is operated by SMRT Trains and is built in an east–west direction. The two ends of the station connects directly to Terminals 2 and 3 of Changi Airport.
CG2 Changi Airport 樟宜机场 சாங்கி விமானநிலையம் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) terminus | |||||||||||
General information | |||||||||||
Location | 70 Airport Boulevard Singapore 819661[1] | ||||||||||
Coordinates | 1°21′26.54″N 103°59′19.81″E | ||||||||||
Operated by | SMRT Trains Ltd (SMRT Corporation) (East West & Thomson-East Coast lines)[2][3] | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Connections | Changi Airport Bus Terminal, taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes (Changi Airport, Jewel Changi Airport) | ||||||||||
Bicycle facilities | Yes (Changi Airport) | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 8 February 2002 (as Changi Branch line) | ||||||||||
Opening | 2040Thomson–East Coast line) | (||||||||||
Electrified | Yes | ||||||||||
Passengers | |||||||||||
July 2020 | 4799 per day[4] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Changi Airport Changi Airport station in Singapore |
While there were plans for a rail connection to the airport since the 1980s, plans were shelved due to the low viability of such a branch. With higher air traffic to Changi Airport and the proposal of a Terminal 3 in 1994, the rail link plan were revived. The current two-station branch line was finalised in 1996 and construction began in 1998.
The station opened on 8 February 2002, with passenger demand lower than expected. Nevertheless, it continues to provide an alternative transport option to the airport. Demand also improved when Terminal 3 opened in 2008. On 25 May 2019, it was announced that the station will be incorporated as part of the Thomson–East Coast line (TEL) as it extends to the airport's Terminal 5 by 2040.[5][6]
History
Early plans
A branch to the airport was included in the early plans of the MRT network in May 1982.[7] The branch was to be built when the rest of the MRT system was completed. In 1983, the Mass Rapid Transit Corporation (MRTC) concluded through a feasibility study that there might not be sufficient passenger traffic to justify such a branch.[8] As the MRT system was built below budget, plans for the connection were reviewed in 1984.[9]
In 1985, the MRTC conducted a survey on transportation needs by airport workers in 1985,[10] but concluded in January 1986 that the connection is unfeasible, with travellers preferring to commute to the airport by taxis.[11] Communications Minister Yeo Ning Hong further explained that such an extension might be considered if there were development plans in the Changi area, otherwise the low demand might not meet operating costs.[12] In 1991, he stated that such a connection would only be justified when 50 million passengers are using the airport annually, with projections that the airport would handle only about 34 million passengers annually at the beginning of the 21st century. The minister further stated that the airport was already well served by expressways with affordable taxi rates.[13] Nevertheless, land needed for the possible route has already been reserved by the government.[14]
Finalisation of rail connection
The proposal for the rail link to Changi Airport was revisited in August 1994, following a surge in airport usage that exceeded previous projections (10% compared to 6–7% annually). With plans for a new terminal to cater to the passenger growth, the Civil Aviation Authority of Singapore (CAAS) had urged the MRTC to reconsider the proposal for the rail link, as the new roads serving the new terminal might be insufficient. It was suggested for the new link to be built along with the new terminal. The airport link will branch off from the EWL at Tanah Merah station, although there were not yet plans for intermediate stops.[15][16]
After another feasibility study by the Land Transport Authority (LTA) in March 1996, finalised plans for the 6.4-kilometre (4.0 mi) branch were announced by deputy prime minister Lee Hsien Loong on 15 November 1996.[17] The branch, projected to be completed in 2001, will run from Tanah Merah station and have an intermediate stop at Somapah (now Expo) to serve the Changi Business Park and the exhibition centre.[18][19] There were no plans to extend the branch towards the cargo and engineering complexes due to low demand in the area.[20]
Construction and opening
Contract 504 for the construction of Changi Airport MRT station and its associated tunnels was awarded to a joint venture between Kumagai-Gumi Co and Sembawang Engineering and Construction in October 1998 for S$204.5 million (US$122.2 million). The contract includes the construction of Changi Airport station and associated tunnels, a new baggage tunnel between Terminals 2 and 3 and a new vehicular underpass to serve Terminal 3.[21] This project was a joint effort which combines Japanese technology and experience with local knowledge of subcontractor availability and supplier availability, due to the challenges of the construction of the station.[22]
A groundbreaking ceremony was held on 29 January 1999. In the speech by then-communications minister Mah Bow Tan at the ceremony, he highlighted the challenges of the construction of the station, which would require close cooperation between various parties such as the Land Transport Authority (LTA), the CAAS and the contractors. For the construction of Changi Airport station, different methods of deep excavations using various ground support systems were adopted. The construction work involved the challenge of deep excavation works right next to nearby developments such as the existing Terminal 2 structures.[23] In addition, close monitoring was needed for the construction of the 1 km-long (0.62 mi) tunnel leading to the station, which passes directly underneath the runway and airport terminal.[24] During the construction, CPG Consultants, which was designing Terminal 3 at the time, provided 20 staff to complement the LTA team on the Changi Airport line extension.[25]
As part of the President's Challenge 2001, a part of a charity walk goes through the tunnel between Expo and Changi Airport stations.[26][27][28]
The station opened on 8 February 2002,[29][30] with the official opening ceremony of the Changi Airport MRT extension held on 27 February 2002.[31] Since the station's opening, passenger traffic has been moderate, as most bus routes were maintained and continue to be a popular means of cheap, direct transport for local airport/airline employees, as well as travellers not living along the East West line. Many air travellers also prefer to continue taking taxis or private transport as not all of the MRT services have luggage racks in the trains.[32] However, taxi drivers claimed that the station has put them at a disadvantage, reporting a loss of 20 percent in earnings, with about 20,500 commuters using the station daily as of March 2002.[33]
Incorporation into the TEL
In July 2016, then Transport Minister Khaw Boon Wan announced the possibility of extending the Thomson–East Coast line (TEL) to Changi Airport, to provide a more direct connection from the airport to the city. The extension will open along with the future Terminal 5 of the airport.[34] On 25 May 2019, the LTA further announced that the stretch between Tanah Merah and Changi Airport will be part of the TEL when it extends to Changi Airport from Sungei Bedok MRT station via Terminal 5 and will open in 2040.[5][35] Contract T316 for the construction of twin bored tunnels from this station to Changi Airport Terminal 5 was awarded to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd for S$321.7 million (US$240.07 million).[36][37]
Incidents
- On 24 July 2002, a glass panel of the atria wall shattered. The area was quickly closed off for repairs but train services were not affected.[38][39]
- On 24 September 2003, a man died at the station, apparently having fallen five stories from the departure hall.[40]
- On 16 January 2020, rail operator SMRT reported a crack in the crossing at Changi Airport MRT Station during inspection works that morning. Trains had to be diverted to only one platform and travel at a slower speed as they approached the affected crossing. The fault was rectified and normal services resumed afterwards.[41][42]
Station details
Services
Changi Airport station is served by the Changi Airport Branch of the EWL, which connects to the airport from Tanah Merah station as a shuttle service. The official station code is CG2,[43] previously EW29.[44][45] The next station towards Tanah Merah is Expo station.[43] In 2040, the station will be served by the TEL when the line extends to the airport.[5]
When the station first opened on 8 February 2002, the station was served by a through service from Boon Lay station to this station.[46] However, due to low ridership, from 22 July 2003, this service reverted to a shuttle service, with trains from Changi Airport station terminating at Tanah Merah station instead.[47] The first train from Changi Airport station departs at 5:31 am on weekdays and Saturdays and 5:59 am on Sundays instead, with the last train from the airport departing at 12:06 am.[48] From Tanah Merah station, the first train towards the station departs at 5:20 am on weekdays and Saturdays and 5:47 am on Sundays instead, with the last train towards the airport from Tanah Merah station departing at 11:50 pm.[49][50] Headways between trains vary from 7 to 13 minutes.[51][52]
Design
The station is 40 metres (130 ft) wide and 200 metres (660 ft) long, and was constructed at a depth of 18.5 metres (61 ft).[22] Designed by architectural firm Skidmore, Owings and Merrill,[53] various features have been incorporated into the station design to enhance the commuting experience of airport travellers.[31] The station has wider faregates for commuters with luggage.[54] These faregates, located on the same level as the station,[55] also allow easier access for wheelchair users into the station. Changi Airport station is one of the first MRT stations to be wheelchair-accessible, with lifts and ramps retrofitted for barrier-free access.[56] A tactile system, consisting of tiles with rounded or elongated raised studs, guides visually impaired commuters through the station.[57]
At the two entrances of the station are glass atrium walls supporting an illuminated 150 m (490 ft) linkbridge spanning over the island platform.[53][54][58] The glass bridge allows unpaid transfer between the two terminals.[59] At either end of the station is an atrium measuring approximately 60 m (200 ft) long by 36 m (118 ft) high. Australian engineering company Meinhardt Facades provided structural design engineering of the glazing system and the tensioned cable structure of the atria's walls,[60] with engineering input by Ove Arup and Partners.[61]
The atria are designed to allow maximum sunlight into the station, with minimal structures used to maintain the transparency of the atria.[60] The roof is only supported at its northern and southern ends, with a massive beam (the spine) running between the north and south.[59] This beam is supported by a staggered structure made of reinforced concrete at one end and an 'A' frame column and stability truss at the other end.[60] The facade panels are hung from vertical trusses at the end of each cantilever, with other cables (that runs diagonally and horizontally) supporting the panels.[59]
The station design was awarded the 2004 American Architecture Award by the Chicago Athenaeum.[62] In 2011, the station was rated 10 out of 15 most beautiful subway stops in the world by BootsnAll.[63]
References
- "Changi Airport MRT Station (CG2)". OneMap. Singapore Land Authority. Retrieved 1 March 2022.
- "LTA | Getting Around | Public Transport | Rail Network". www.lta.gov.sg. Archived from the original on 1 November 2019. Retrieved 20 April 2020.
- "SMRT Journeys". SMRT Journeys. Archived from the original on 8 September 2019. Retrieved 20 April 2020.
- "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 20 August 2020.
- "New MRT stations, line extensions and a possible new rail line: LTA's 2040 blueprint". TODAYonline. Archived from the original on 25 May 2019. Retrieved 25 May 2019.
- "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". www.lta.gov.sg. Archived from the original on 23 August 2019. Retrieved 26 May 2019.
- "Proposed MRT stations". The Straits Times. Singapore Press Holdings. 23 May 1982. p. 1. Retrieved 12 December 2020 – via NewspaperSG.
- "No line to the airport". The Straits Times. Singapore Press Holdings. 17 November 1983. p. 18. Retrieved 20 February 2022 – via NewspaperSG.
- "New MRT sector under study". Singapore Monitor. 25 September 1984. p. 1. Retrieved 20 February 2022 – via NewspaperSG.
- "Airport survey to decide MRT link". The Straits Times. Singapore Press Holdings. 21 June 1985. p. 11. Retrieved 20 February 2022 – via NewspaperSG.
- "Changi MRT line 'not viable'". The Straits Times. Singapore Press Holdings. 15 January 1986. p. 13. Retrieved 20 February 2022 – via NewspaperSG.
- "New MRT routes will depend on economic viability". The Straits Times. Singapore Press Holdings. 23 March 1989. p. 14.
- "MRT Link to Airport: Not in next 10 years". The Straits Times. Singapore Press Holdings. 17 May 1991. p. 1. Archived from the original on 21 February 2022. Retrieved 20 February 2022.
- "No MRT Line to Changi yet". The Straits Times. Singapore Press Holdings. 20 March 1992.
- Dhaliwal, Rav (2 August 1994). "MRT extension to airport reconsidered". The Straits Times. Singapore Press Holdings. p. 1. Archived from the original on 19 February 2022. Retrieved 20 February 2022.
- "Next Stop: Changi Airport?". The New Paper. 2 August 1994.
- "Singapore Mass Rapid Transit Employees' Union (SMRTEU)'s annual Dinner and Dance" (PDF). National Archives of Singapore. 15 November 1996. Archived (PDF) from the original on 10 July 2019. Retrieved 10 July 2019.
- Tan, Hsueh Yan (16 November 1996). "MRT line to be extended to Changi Airport". The Straits Times. Singapore Press Holdings. Archived from the original on 1 March 2022. Retrieved 1 March 2022.
- Tan, Christopher (12 December 1996). "Changi Airport MRT line details". Business Times. p. 1. Retrieved 26 October 2017 – via NewspaperSG.
- "MRT Line will not go beyond passenger terminals". The Straits Times. 12 December 1996. p. 39. Retrieved 17 October 2019 – via NewspaperSG.
- "Joint Venture of SembCorp unit wins MRT contract". The Business Times. 3 November 1998. p. 16.
- Nishi, Shuichi; Nakashima, Yasuyoshi; Izumi, Chitoshi. "Underpinning Works in Construction of MRT Changi Airport Station in Singapore" (PDF). library.jsce.or.jp. Archived (PDF) from the original on 30 October 2020.
- Murugamoorthy, C. (2003). Behaviour of Various Support Systems for Deep Excavations, Changi Airport Underground MRT Station (PDF). Land Transport Authority. Archived (PDF) from the original on 20 July 2021. Retrieved 21 February 2022.
- "Speech By Mr Mah Bow Tan, At The Changi Airport Line Ground Breaking Ceremony, 29 Jan 99, 10 am, Singapore Changi Airport". www.nas.gov.sg. Archived from the original on 29 December 2019. Retrieved 9 April 2020.
- "CPG Consultants – Changi Airport Mass Rapid Transit Station (MRT)". www.cpgcorp.com.sg. Archived from the original on 21 February 2018. Retrieved 9 April 2020.
- Seng Kim, Lim (12 August 2001). "Charity walk to talk place underground". The Straits Times.
- "Perfectly legal, and for a good cause!". The New Paper. 9 September 2001.
- Tan, Terence (9 September 2001). "Tunnel walk a hit". The Straits Times.
- "Completion Of The Changi Airport MRT Extension". www.mot.gov.sg. Archived from the original on 21 August 2020. Retrieved 9 April 2020.
- "Airport MRT stop to open tomorrow". Today. 7 February 2002.
- "Speech By Mr Yeo Cheow Tong At The Opening Of The Changi Airport MRT Extension on 27 February 2002". www.mot.gov.sg. Archived from the original on 21 August 2020. Retrieved 9 April 2020.
- Chew, Seng Kim (26 August 2002). "Taxi still the way to go for Changi air travellers". The Straits Times. p. 5.
- Phei Phei, Leong (11 March 2002). "Airport woes for cabbies". Today. Archived from the original on 30 October 2020.
- Lim, Adrian (22 July 2016). "Thomson-East Coast MRT line may be extended to airport". The Straits Times. Archived from the original on 25 March 2021. Retrieved 25 March 2021.
- Chong, Aaron (25 May 2019). "New stations, line extensions planned for Singapore's rail network". CNA. Archived from the original on 13 February 2020. Retrieved 25 March 2021.
- "Contract T316". STECS. Archived from the original on 22 March 2023. Retrieved 22 March 2023.
- "Contract T316" (PDF). Land Transport Authority. Archived (PDF) from the original on 22 March 2023. Retrieved 22 March 2023.
- "Joint Press Release By Land Transport Authority And Singapore MRT Ltd Atria Wall In Changi Airport MRT Station". Ministry of Transport. 24 July 2002. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
At 12.05pm, a piece of tempered glass at the atria wall in the Changi Airport MRT Station shattered into small fragments.
- "Joint Press Release By Land Transport Authority And Singapore MRT Ltd Atria Wall In Changi Airport MRT Station". www.mot.gov.sg. Archived from the original on 30 October 2020. Retrieved 9 April 2020.
- "Man Dies at Changi Airport". TODAY. 25 September 2003. Archived from the original on 18 December 2017. Retrieved 26 October 2017.
- Toh, Ting Wei (17 January 2020). "Crack found on track near Changi Airport MRT station; slower service expected till Jan 21". The Straits Times. Retrieved 1 May 2022.
- "Slower train service to Changi Airport MRT Station until Jan 21, after crack spotted on track". Today. 17 January 2020. Archived from the original on 18 January 2020.
- "MRT System Map" (PDF). LTA. Archived (PDF) from the original on 21 August 2020.
- Salim, Shazalina (3 August 2001). "Red, green and grey". p. 9. Archived from the original on 30 October 2020. Retrieved 21 August 2020.
- "MRT & LRT System Map" (PDF). lta.gov.sg. Land Transport Authority. Archived from the original (PDF) on 29 May 2009. Retrieved 21 February 2022.
- "Boon Lay to Expo: MRT now running". The Straits Times. 20 December 2001.
- "Board MRT to airport from Tanah Merah". The Straits Times. 18 July 2003.
- "SMRT Journeys (First and last trains from Changi Airport)". journey.smrt.com.sg. Archived from the original on 14 September 2019. Retrieved 9 April 2020.
- "SMRT Journeys (First and last trains from Tanah Merah)". journey.smrt.com.sg. Archived from the original on 4 September 2019. Retrieved 9 April 2020.
- "Getting to the Airport". Singapore Changi Airport. Archived from the original on 8 September 2019. Retrieved 20 April 2020.
- "Tanah Merah station to get new tracks, platform". TODAYonline. 26 August 2014. Archived from the original on 31 August 2014. Retrieved 20 April 2020.
- "Visiting Singapore". www.smrttrains.com.sg. Archived from the original on 3 February 2020. Retrieved 20 April 2020.
- "Changi International Airport – Rail Terminal". SOM. 14 December 2021. Archived from the original on 21 February 2022. Retrieved 21 February 2022.
- "Changi Airport MRT station designed for travellers". The Straits Times. Singapore Press Holdings. 11 February 1988. p. 1. Retrieved 21 February 2022.
- "Station Stories: Changi Airport MRT Station". The SMRT Blog. 28 April 2015. Archived from the original on 5 March 2016. Retrieved 21 February 2022.
- "More MRT stops ready for disabled". The Straits Times. Singapore Press Holdings. 24 December 2002. p. 1. Archived from the original on 21 February 2022. Retrieved 21 February 2022.
- "Tactile Guiding System: Studs and Strips to Guide Your Way". lta.gov.sg. Land Transport Authority. 30 July 2021. Archived from the original on 11 September 2021. Retrieved 11 September 2021.
- Goh, Sushma (2018). RE:think – Designing For Wayfinding (PDF). Land Transport Authority. p. 24.
- Bussel, Abby (2000). SOM evolutions: Recent work of Skidmore, Owings & Merrill. Boston: Birkhäuser. p. 152. ISBN 0-8176-6072-0. OCLC 43227468.
- "Changi Airport Glass Atria". Meinhardt. Archived from the original on 6 September 2019. Retrieved 9 April 2020.
- "Singapore Changi Airport MRT Station Design & Construction of Glass Atria" (PDF). Land Transport Authority. Archived (PDF) from the original on 30 October 2020. Retrieved 20 April 2020.
- "The American Architectural Awards (2004 Archive)" (PDF). The Chicago Athenaeum. Retrieved 21 February 2022.
- "15 of the Most Beautiful Subway Stops in the World – BootsnAll Travel Articles". Archived from the original on 17 May 2019. Retrieved 31 July 2019.
External links
- Media related to Changi Airport MRT Station at Wikimedia Commons
- Official website
- Official SMRT blogsite
- HarbourFront to Changi Airport MRT station route