Chiswick Road station

Chiswick Road station is a light rail station on the MBTA's Green Line B branch, located in the median of Commonwealth Avenue north of Chiswick Road in the Brighton neighborhood of Boston, Massachusetts. Chiswick Road consists of two side platforms, which serve the B branch's two tracks.

Chiswick Road
An inbound train at Chiswick Road station in August 2018
General information
LocationCommonwealth Avenue at Chiswick Road
Brighton, Boston, Massachusetts
Coordinates 42.34084°N 71.15046°W / 42.34084; -71.15046
Platforms2 side platforms
Tracks2
History
OpenedMay 26, 1900[1][2]
Passengers
2011 daily615[3]
Services
Preceding station MBTA Following station
Chestnut Hill Avenue Green Line Sutherland Road
Location

History

In 2003, Chiswick Road was one of five stops on the B branch proposed for closure, due to having a low average daily ridership and being located quite close to nearby, better-used stops.[4] Chiswick Road was dropped from the proposal shortly after it was announced due to opposition from residents of a local housing project for the elderly served by the stop.[4] The other four stops (Fordham Road, Summit Avenue, Mount Hood Road, and Greycliff Road) were provisionally closed on April 20, 2004, which was made permanent on March 15, 2005.[4][5]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[6] Design for Chiswick Road and four other B Branch stops was 30% complete by December 2022.[7] As of June 2023, construction is expected to take place during 2024.[8]

References

  1. Engineering and Maintenance Department (1981). History of subways, tunnels and elevated lines. Massachusetts Bay Transportation Authority via Internet Archive.
  2. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. p. 58. ISBN 0938315048.
  3. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  4. Daniel, Mac (16 March 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on 18 March 2005. Retrieved 6 June 2016.
  5. "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on 26 November 2010. Retrieved 6 February 2014.
  6. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  7. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  8. "System-Wide Accessibility Initiatives—June 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. June 5, 2023. p. 4.

Media related to Chiswick Road station at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.