Churchill station (Edmonton)

Churchill station is an Edmonton Light Rail Transit station in Edmonton, Alberta. It serves both the Capital Line and the Metro Line. It is an underground station located beneath Churchill Square and is a part of the Edmonton Pedway system.

Churchill
Edmonton LRT station
General information
Coordinates53°32′39″N 113°29′21″W
Owned byCity of Edmonton
PlatformsCentre
Tracks4
Construction
Structure typeunderground and at-grade
Platform levels2
AccessibleYes
Other information
WebsiteChurchill LRT Station
History
Opened1978 (underground) 2023 (at-grade)
Electrified600 V DC[1]
Passengers
2019
(typical weekday)
9,834 board
9,814 alight
19,648 Total[2]
Services
Preceding station Edmonton LRT Following station
Stadium
toward Clareview
Capital Line Central
MacEwan
toward NAIT
Metro Line Central
102 Street
Terminus
Valley Line
Opening 2023
Quarters
toward Mill Woods

An at-grade surface platform for the Valley Line is above the existing station at Rue Hull (99 Street) and 102 Avenue, and was scheduled to open in 2020;[3] It is now scheduled to open on November 4, 2023.[4]

The new platform will facilitate transfers between the Metro and Capital lines below grade, and the Valley Line and Festival Line at the surface level. By 2040 Churchill LRT Station is expected to be one of the major hubs of the Edmonton LRT system, with four out of the five lines currently approved by the City passing through the station.

History

Churchill station opened on April 22, 1978 when the LRT system first began operations.

A tragedy occurred in August 1988 when Cathy Greeve, a 29-year-old mother of two, was found strangled to death in one of the washrooms at the station [5]

In November 2006, Churchill became the first LRT station in Edmonton to have an exclusive advertisement campaign, with all ad space, as well as many other parts of the station, being used for advertisements for Enmax.

Station layout

The station has a 129-metre-long (423 ft) centre loading platform that can accommodate two five-car LRT trains at the same time, with one train on each side of the platform. At just under 8 m wide (26 ft), the platform is narrow by current Edmonton LRT design guidelines. Access to the platform is from the concourse level by stairs and escalators located at each end of the platform. The concourse level is part of the Edmonton pedway system.[6]

The LRT system control centre is located on the Churchill Station concourse level. The Edmonton Transit System Customer Services centre, complete with lost and found, was also located in the station before moving to City Hall in February 2013,[7] then to the Edmonton Tower in early 2017. At one time, windows allowed pedestrians to view the control centre, but these were removed in 2008.

Lines

Unlike the Capital and Metro Line platforms, the Valley Line platforms are at surface level

The station serves as a transfer point for the Metro Line, Capital Line, and future Valley Line.[8][9]

Public art

Churchill station includes two pieces of public art. The first, "Ridden Down" is an abstract sculpture using welded steel that was installed in 1996. The second is a mural entitled "New Year's Eve".[10]

Around the station

References

  1. "SD160 Light Rail Vehicle" (PDF). Siemens Transportation Systems, Inc. May 2007. Archived from the original (PDF) on October 26, 2010. Retrieved August 1, 2014.
  2. "2019 LRT Passenger Count Report" (PDF). City of Edmonton. April 2020. Retrieved 5 Feb 2021.
  3. "Valley Line LRT" (PDF). City of Edmonton. September 2016. Retrieved July 21, 2017.
  4. "Edmonton's Valley Line Southeast LRT set to open Nov. 4". CBC. 24 October 2023. Retrieved 24 October 2023.
  5. "LRT Line Names Approved". City of Edmonton.
  6. City of Edmonton (July 2011). "LRT Design Guidelines 2011" (PDF). City of Edmonton. p. 700. Archived from the original (PDF) on June 1, 2012. Retrieved May 30, 2012.
  7. City of Edmonton (February 15, 2013). "ETS Customer Services Moves to City Hall". City of Edmonton. Archived from the original on June 28, 2013. Retrieved April 10, 2013.
  8. "TransEd Partners picked to build, operate Edmonton's Valley LRT Line". CBC News. November 25, 2015. Retrieved February 13, 2016.
  9. "Valley Line – Stage 1 Mill Woods Town Centre to 102 Street" (PDF). City of Edmonton. November 25, 2015. Retrieved February 13, 2016.
  10. "Churchill Station Art". City of Edmonton. Retrieved February 13, 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.