Stanley A. Milner Library

The Stanley A. Milner Library is the flagship branch of the Edmonton Public Library. It is located on the southern side of Sir Winston Churchill Square in the downtown core of Edmonton, Alberta, Canada. The main library is near walking distance to the City Hall, the Edmonton City Centre mall, the Francis Winspear Centre for Music, and the Citadel Theatre. In January 2017, the library closed its doors for a major renovation, as all but the basic structure was removed to be rebuilt with an architectural design similar to that of the Art Gallery of Alberta located a few blocks away. Its services were relocated to a temporary space on Jasper Avenue in Enterprise Square. The new Stanley A. Milner Library, along with the new Shelley Milner Children's Library opened on September 17, 2020.

Stanley A. Milner Library
53.5430°N 113.4897°W / 53.5430; -113.4897
Location7 Sir Winston Churchill Square
Edmonton, Alberta
T5J 2V4
Established1967
Service areaDowntown Edmonton
Branch ofEdmonton Public Library
Other information
Public transit accessEdmonton Transit System Light rail interchangeCapital LineMetro Line Churchill station
Websitewww.epl.ca/milner-library/

The building is directly connected to the underground pedway network and to Edmonton's LRT. A number of ETS bus routes also serve the library along Harbin Road (102 Avenue) and 100 Street. Underground parking, run by the city, is also available.[1]

The Stanley A. Milner Library is also a centre for assistive services. Specialized magnifiers, projection reading rooms, large print books, braille material, voice dictation stations, and specialized computers are available as part of the library's mission to provide information access to all.[2]

History

Stanley A. Milner Library in 1989

The Stanley A. Milner Library was opened in 1967 on the southern edge of Churchill Square. Architect was the Canadian/Norwegian Dr. Fred. Minsos. The site of the library was originally home to Market Square, Edmonton's main square and city market from 1900 to 1965. Although the square and market were considered a hub of Edmonton's community, the city wished to create a more dedicated civic centre.[3][4] The city had already built and relocated city hall to its current location in 1956 and, in conjunction with the new art gallery completed in 1969, the library was designed to form part of this new centre.

The library replaced the original downtown library, which was located two blocks south on Macdonald Drive. The original downtown library was funded by a donation from Andrew Carnegie and completed in 1923 (a temporary downtown library had existed prior to this).[5] The building was small though, and the city's growth boom in the post-WWII years fueled demand for a larger building. The new building was designed in the Brutalist style, common for many public buildings constructed in Edmonton in the 1960s, and would cost approximately CA$4 million. It features a cantilevered second level above a smaller lower level, exposed concreted, plate glass window walls, podium pillars, and a four-story tower atop it. It opened on May 27, 1967, and was originally named the "Centennial Library" in honour of the Canadian Centennial that year.[6] The small public square on the south side of the library building was also named "Centennial Square". The original downtown library was sold and demolished in 1968, to make room for the Alberta Government Telephones Tower (today ATB Place).

Direct connection to Edmonton's underground pedway system was added in 1978 when construction was completed on the original LRT line downtown. The library is connected to Churchill LRT Station, and can also reach most of the nearby arts and civic centre buildings through the pedway. In 1996 the library was officially renamed the "Stanley A. Milner Library," in honour of petroleum business leader, philanthropist, former city councilor, and former Library Board Chairman Dr. Stanley A. Milner.[7][8] The first major renovation project to the library was completed in 1998, which saw the addition of a new front entrance facing Churchill Square, along with many interior upgrades. In 2010, the newly renovated children's library was reopened and named in honour of Dr. Milner's late daughter, Shelley Milner.[9]

The Stanley A. Milner Library had a number of meeting rooms and a small theater in the lower level, that were used for library programs and would also be rented out by the public.[10]

The library temporarily closed in January 2017 for major revitalization of the building.[11] The building reopened on September 17, 2020.

Future

The Stanley A. Milner Library in 2017

The Stanley A. Milner Library is the largest and one of the busiest Edmonton Public Library locations. It was still very up to date with assistive services, accessibility, and information technologies. However, The building was now over 50 years old and was beginning to show its age. As is common with many of Edmonton's Brutalist buildings of the era, the exposed concrete and other materials in the library were beginning to fail from years of weathering. Aging mechanical system designs have also led to ventilation concerns and wasted energy costs. In addition, there have been safety concerns regarding the front entrance of the library facing Churchill Square.[12] The narrow sidewalk and busy bus stop just outside the entrance on 102 Avenue, has led to many congestion and safety problems.

The interactive digital wall at the Stanley A. Milner Library

In response to these concerns, the increasing cost and inefficiencies of the aging building, and a general misfit with the other, now more modern buildings in the civic and arts area, the city commissioned the architectural firm of Manasc Isaac to look into a "re-imagination" of the current building.[13][14] The proposal would involve removal and replacement of the exterior walls, a new front entrance, and revamped interior with updated mechanical systems. The primary structure and layout of the building, however, would not be changed. This would provide significant cost-savings in comparison to completely replacing the building, while still transforming it into a modern, energy efficient space. Construction started in January 2017, and the library was expected to reopen on February 14, 2020; however, this target was not met.[15] The library already has access to the two lines on the LRT system from Churchill station, and the Valley Line, scheduled to be completed in 2021, will run past the library on 102 Avenue. The library officially opened on September 17, 2020.[16]

Future developments at the newly reopened Milner Branch include a Second Cup location, a renewed Muttart Theatre and the EPL Kitchen, a 2,100 square foot culinary centre that will provide creative and educational opportunities relating to health, nutrition and food literacy.[17]

Schools served

As part of Edmonton Public Library's regional division, the Stanley A. Milner Library serves the following nearby schools:[18]

  • Centre High School
  • Edmonton Academy
  • Grandin Elementary School
  • John A. McDougall Elementary School
  • Mother Teresa Elementary School
  • Oliver Elementary/Junior High School
  • Riverdale Elementary School
  • St. Catherine Elementary/Junior High School
  • St. Joseph High School
  • Victoria School of the Arts

See also

Notes

  1. "Parking Operations - Parking in downtown Edmonton :: City of Edmonton". Edmonton.ca. Retrieved 2010-11-14.
  2. "Assistive Services | Edmonton Public Library". Epl.ca. Retrieved 2010-11-14.
  3. "Real Estate Weekly". Rewedmonton.ca. 2004-09-23. Archived from the original on March 23, 2012. Retrieved 2010-11-14.
  4. Merrett, 117
  5. "Real Estate Weekly". Rewedmonton.ca. October 21, 2010. Archived from the original on March 23, 2012. Retrieved 2010-11-14.
  6. "City Projects for Canada's 1967 Centennial". edmonton.ca. City of Edmonton. Retrieved September 8, 2020.
  7. "The Alberta Order of Excellence - Members". Lieutenantgovernor.ab.ca. Archived from the original on October 23, 2003. Retrieved 2010-11-14.
  8. "Leaders - Stanley Milner". Albertasource.ca. Retrieved 2010-11-14.
  9. "Edmonton Public Library Names Downtown Children's Library | Edmonton Public Library". Epl.ca. 2010-05-04. Retrieved 2010-11-14.
  10. "Rent a Meeting Room | Edmonton Public Library". Epl.ca. 2008-01-01. Retrieved 2010-11-14.
  11. "Milner Revitalization". epl.ca. Retrieved 2017-08-18.
  12. "CBC News - Edmonton - Mayor calls for more police patrols". Cbc.ca. 2010-05-08. Archived from the original on May 10, 2010. Retrieved 2010-11-14.
  13. "Stanley Milner Library Study". Reimagine.ca. Archived from the original on March 14, 2012. Retrieved 2010-11-14.
  14. "Stanley A. Milner Library". Manascisaac.com. Archived from the original on March 14, 2012. Retrieved 2010-11-14.
  15. French, Janet (December 15, 2019). "Opening of revamped Stanley A. Milner library to be delayed". Edmonton Journal. Retrieved 16 July 2020.
  16. "Edmonton's significantly revamped Stanley A. Milner Library opens doors to the public". Global News. Retrieved 2020-09-30.
  17. "Hello Milner". www.epl.ca. Retrieved 2020-10-02.
  18. "Stanley A. Milner Library | Edmonton Public Library". Epl.ca. Retrieved 2010-11-14.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.