Cleveland Regional Jetport

Cleveland Regional Jetport is a public general aviation airport located near the community of Tasso, Tennessee, US, approximately four miles north of the business district of Cleveland. Opened on January 25, 2013, it is owned by the City of Cleveland and serves Cleveland and Bradley County.

Cleveland Regional Jetport
Summary
OwnerCity of Cleveland, Tennessee
ServesCleveland, Tennessee
Bradley County, Tennessee
Location251 Dry Valley Road NE
Cleveland, TN 37312
OpenedJanuary 25, 2013 (2013-01-25)
Time zoneEastern ()
Elevation AMSL262.1 m / 860 ft
Coordinates35°12′41″N 084°47′59″W
Websitewww.clevelandregionaljetport.com
Map
KRZR is located in Tennessee
KRZR
KRZR
Location of airport in Tennessee
Runways
Direction Length Surface
m ft
3/21 1,890 6,200 Concrete
Statistics: Cleveland Regional Jetport[1]

Facilities

The airport contains a 6,200 foot by 100 foot concrete runway, an 8,000 square foot terminal building, a thirty-five foot wide taxiway, a 311,452 square foot apron, and twenty hangars.[2]

History

Background

Cleveland Regional Jetport was constructed to replace Hardwick Field, established in 1955 and located about 2 miles (3.2 km) to the west. Hardwick field consisted of a 3,300-foot (1,000 m) asphalt runway. By the early 1970s, many local leaders had come to view Hardwick Field's facilities as inadequate for the community. In 1973, a newly elected city commissioner proposed a new general aviation airport for the city to be constructed at a new site, and later that year, a proposal was unveiled to double the length of the runway to 6,600 feet (2,000 m).[3] Further efforts continued throughout the 1980s.[4] In 1991, then-newly elected mayor of Cleveland Tom Rowland set a goal for a new general aviation airport for the city.[5] A study commissioned by the city in 1994 identified 18 possible sites for a new airport, including the one near the Tasso community. The push for a new airport was further energized in March 2000, when then-governor Don Sundquist flew into Hardwick Field and expressed his opinion that the facility was the "worst airport in the state."[4]

In 2004, the Cleveland City Council authorized the creation of the Cleveland Municipal Airport Authority.[3] On January 28, 2005, several proposals to lengthen and expand the runway at Hardwick Field, which would have required additional purchased land, were presented to the airport authority.[6][4] At the time, then-chairwoman of the airport authority Lynn Devault expressed doubt that another site would be found for a new airport.[7] Many residents living around the airport expressed opposition to these proposals, and requested that the city pursue and new site instead.[8][9]

After the proposed expansions of Hardwick Field were ruled unfeasible, the airport authority began reviewing sites from the 1994 study, and settled on the site on Dry Valley Road, then a series of farms.[4] This proposal was also met with opposition, however.[4] The authority, which chose not to acquire land via eminent domain, soon worked a deal with the property owners to sell the land, and on August 21, 2006, the Bradley County Commission voted 10–4 to rezone the property.[4] On April 11, 2007, then-governor Phil Bredesen announced that the state would provide a $4.35 million aeronautics grant for property acquisition and preliminary engineering for an environmental impact statement of the property.[4]

Construction

Construction of the new airport was split into three phases. The contract for phase one of construction, which including wetland mitigation and preliminary work, was signed on November 20, 2009.[10] The project officially began on April 19, 2010.[4] Phase 2 was awarded on September 20, 2010. This phase involved leveling and excavating 2.2 million cubic yards of dirt onto the site and slightly rerouting and constructing a culvert over a small stream which ran through the site. Construction of the new airport also required the relocation of Tasso Road, which ran through the property. This was accomplished by rerouting the road around the airport, creating a straight stretch nearly 1 mile (1.6 km) long parallel to the runway, which some have come to jokingly nickname the airport's second runway.[4] The name Cleveland Regional Jetport was selected by the airport authority on December 16, 2011.[11] The contract for the final phase of construction, the construction of the runway, was awarded on April 20, 2012.[4] The jetport officially opened on January 25, 2013, with a 5,500 feet (1.7 km) runway.[12] Hardwick Field closed on December 31, 2013.[13][14]

The entire project cost $42.32 million, with $36.376 coming from the state and federal government, $5.943 from the city, and additional funds coming from private donors, including businessman Allan Jones.[3]

Later history

The jetport was named Airport of the Year by the Tennessee Aeronautics Commission (TEC) in March 2014.[15]

In 2017 the runway was extended to 6,200 ft.[16]

References

  1. "AirNav:KRZR - Cleveland Regional Jetport". AirNav.com. AirNav. Retrieved 16 March 2014.
  2. Gerber, Greg (March 2013). "New Jetport Becomes Front Door to Tennessee Business Region". AirportImprovement.com. Airport Improvement Magazine. Archived from the original on 20 March 2014. Retrieved 16 March 2014.
  3. Davis, David (January 27, 2013). "Jetport tab was $42.32M". Cleveland Daily Banner. Cleveland, Tennessee.
  4. Davis, David (January 27, 2013). "Jetport timeline: For more than decade, airport need discussed". Cleveland Daily Banner. Cleveland, Tennessee.
  5. Bowers, Larry C. (January 4, 2018). "ROWLAND WON'T RUN, BUT ENDORSES BROOKS". Cleveland Daily Banner. Cleveland, Tennessee. Retrieved 2018-03-21.
  6. Braden, Christine (March 20, 2005). "Airport Authority looks at alternatives for Hardwick Field". Cleveland Daily Banner. Cleveland, Tennessee. Archived from the original on March 21, 2005. Retrieved 2019-07-14.
  7. Braden, Christine (March 16, 2005). "Local residents voice airport site disapproval". Cleveland Daily Banner. Cleveland, Tennessee. Archived from the original on March 17, 2005. Retrieved 2019-07-14.
  8. Braden, Christine (March 29, 2005). "Group against airport proposals is organized". Cleveland Daily Banner. Cleveland, Tennessee. Archived from the original on April 4, 2005. Retrieved 2019-07-14.
  9. Bowers, Larry C. (March 29, 2005). "Airport expansion opposition voiced". Cleveland Daily Banner. Cleveland, Tennessee. Archived from the original on April 4, 2005. Retrieved 2019-07-14.
  10. Higgins, Randall (November 21, 2009). "Environmental group appeals permit for Cleveland airport". Chattanooga Times Free Press. Chattanooga, Tennessee. Retrieved 2019-07-14.
  11. Leach, Paul (December 17, 2011). "'Cleveland Regional Jetport' is airport's new name". Chattanooga Times Free Press. Chattanooga, Tennessee. Retrieved 2019-07-14.
  12. Leach, Paul (January 26, 2013). "Cleveland Regional Jetport officially open". Chattanooga Times Free Press. Retrieved 16 March 2014.
  13. Love, Joyanna (December 29, 2013). "Cleveland's Hardwick Field officially closes Tuesday closes Tuesday". Cleveland Daily Banner. Archived from the original on 17 March 2014. Retrieved 16 March 2014.
  14. Leach, Paul (December 27, 2013). "Cleveland's oldest airport, Hardwick Field, to close at year's end". Chattanooga Times Free Press. Retrieved 16 March 2014.
  15. "Cleveland Regional Jetport Named Airport Of The Year". The Chattanoogan. March 24, 2014. Retrieved November 30, 2017.
  16. Bowers, Larry C. (October 23, 2017). "Jetport work on extension now finished". Cleveland Daily Banner. Retrieved November 1, 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.