Diverting Reservoir

The Diverting Reservoir is a reservoir in the New York City water supply system in the town of Southeast, New York, in Putnam County immediately south of the village of Brewster, New York. Part of the system's Croton Watershed, it lies about 50 miles (80 km) north of New York City. Construction impounding the East Branch Croton River began early in the 20th century and was completed by 1911.

Diverting Reservoir
Diverting Reservoir is located in New York Adirondack Park
Diverting Reservoir
Diverting Reservoir
Location within New York
Diverting Reservoir is located in the United States
Diverting Reservoir
Diverting Reservoir
Diverting Reservoir (the United States)
LocationPutnam County, New York
Coordinates41°23′01″N 73°37′48″W
Typereservoir
Basin countriesUnited States

The Diverting reservoir holds 900 million US gallons (3,400,000 m3) of water at full capacity, making it the smallest in New York City's water supply outside the City itself. Its drainage basin represents 8 square miles (21 km2) of the Croton River watershed. This basin includes the lakes, streams, rivers, and other bodies of water that flow into the reservoir.

The Diverting Reservoir is also connected to the nearby Croton Falls Reservoir via a channel and dividing weir allowing water to freely pass between. The water in Diverting Reservoir flows into the continuation of the East Branch, which then joins the flow of the West Branch, itself carrying the flow of the Middle Branch, amid the headwaters of the Muscoot Reservoir, the collecting point for most of the Croton Watershed. It continues into the New Croton Reservoir, the final collecting point, then the New Croton Aqueduct. Water from the Aqueduct flows into the Jerome Park Reservoir.

In January 2007, the New York City Department of Environmental Protection began a $74 million project of improvements to the Croton Falls Reservoir and the Diverting Reservoir. (See Journal-News article dated Feb. 28, 2007) The upgrading and rehabilitation is part of the city's effort to comply with state and federal dam safety regulations. The work at the Diverting Reservoir includes new valves and pipes, along with redoing the spillway and some of the concrete surfaces on the 55-foot (17 m)-high dam. The connecting channel between the two reservoirs will be emptied, inspected and dredged. Construction at both sites is expected to continue until Jan. 31, 2010.