Dublin Waste-to-Energy Facility

The Dublin Waste-to-Energy Facility, also known as the Poolbeg Incinerator,[1] is a waste-to-energy plant serving the Greater Dublin Area, located on the Poolbeg peninsula. The plant is capable of producing up to 60 megawatts of electricity, enough to power 80,000 homes, and provide district heating for up to 50,000 homes in the Dublin area.[2] The facility will process up to 600,000 tonnes of waste per year.[3] Poolbeg accepted its first delivery of waste on the 24th of April 2017.[4]

Dublin Waste-to-Energy Facility
The Dublin Waste-to-Energy Facility
CountryIreland
LocationPoolbeg, Dublin
Coordinates53.341915°N 6.200809°W / 53.341915; -6.200809
StatusOperational
Construction began2014 (2014)
Commission date2017 (2017)
Construction cost€600m
Owner(s)Covanta Energy
Operator(s)
Thermal power station
Primary fuelMunicipal solid waste (MSW)
Chimneys2
Cogeneration?Yes
Power generation
Nameplate capacity60 MW
External links
WebsiteOfficial Website

The proposal to build an incinerator at this location provoked controversy since its inception in 1997 with concerns about traffic and emissions, but construction work finally started in 2014.

Incidents

On 8 June 2017, eleven people were admitted to hospital after an ‘uncontrolled release’ of lime inside the flue gas treatment area inside the plant.[5] Covanta, the operator of the plant, was ordered to temporarily cease the incineration process at the facility by the Health and Safety Authority.[6]